95-14029. ANR Storage Co., Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 110 (Thursday, June 8, 1995)]
    [Notices]
    [Page 30291]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-14029]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-528-000]
    
    
    ANR Storage Co., Notice of Request Under Blanket Authorization
    
    June 2, 1995.
        Take notice that on May 26, 1995, ANR Storage Company (ANR) 500 
    Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP95-
    528-000, a request pursuant to Sections 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.212) for authorization to add and operate a delivery point (the 
    Rapid River Delivery Point) in Rapid River Township, Kalkaska County, 
    Michigan under the blanket certificate issued in Docket No. CP82-523-
    000, pursuant to Section 7(c) of the Natural Gas Act, all as more fully 
    set forth in the request which is on file with the Commission and open 
    to public inspection.
        ANR proposes to add the Rapid River Delivery Point where ANR is 
    currently physically interconnected with ANR Pipeline Company in the 
    Township of Rapid River. ANR relates that the interconnect was 
    authorized by a May 1, 1992, Commission order in Docket No. CP91-2705-
    000. ANR states that it does not propose to increase its maximum 
    authorized storage deliveries, abandon any service, nor construct any 
    new facilities. ANR states that the gas delivered or redelivered at the 
    proposed new delivery point will be measured by measuring equipment 
    owned by ANR Pipeline Company. ANR asserts that the new delivery point 
    will not impact the storage services ANR currently provides to its 
    existing customers other than to offer ANR's current and future 
    customers the additional flexibility of another delivery point to 
    deliver gas for storage or withdraw gas from storage.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-14029 Filed 6-7-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
06/08/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-14029
Pages:
30291-30291 (1 pages)
Docket Numbers:
Docket No. CP95-528-000
PDF File:
95-14029.pdf