95-14029. ANR Storage Co., Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 110 (Thursday, June 8, 1995)]
[Notices]
[Page 30291]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-14029]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-528-000]
ANR Storage Co., Notice of Request Under Blanket Authorization
June 2, 1995.
Take notice that on May 26, 1995, ANR Storage Company (ANR) 500
Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP95-
528-000, a request pursuant to Sections 157.205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.212) for authorization to add and operate a delivery point (the
Rapid River Delivery Point) in Rapid River Township, Kalkaska County,
Michigan under the blanket certificate issued in Docket No. CP82-523-
000, pursuant to Section 7(c) of the Natural Gas Act, all as more fully
set forth in the request which is on file with the Commission and open
to public inspection.
ANR proposes to add the Rapid River Delivery Point where ANR is
currently physically interconnected with ANR Pipeline Company in the
Township of Rapid River. ANR relates that the interconnect was
authorized by a May 1, 1992, Commission order in Docket No. CP91-2705-
000. ANR states that it does not propose to increase its maximum
authorized storage deliveries, abandon any service, nor construct any
new facilities. ANR states that the gas delivered or redelivered at the
proposed new delivery point will be measured by measuring equipment
owned by ANR Pipeline Company. ANR asserts that the new delivery point
will not impact the storage services ANR currently provides to its
existing customers other than to offer ANR's current and future
customers the additional flexibility of another delivery point to
deliver gas for storage or withdraw gas from storage.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-14029 Filed 6-7-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/08/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-14029
- Pages:
- 30291-30291 (1 pages)
- Docket Numbers:
- Docket No. CP95-528-000
- PDF File:
-
95-14029.pdf