2010-13562. Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests  

  • Start Preamble June 1, 2010.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Application: Non-project Use of Project Lands and Waters.

    b. Project No: 2055-077.

    c. Date Filed: May 13, 2010.

    d. Applicant: Idaho Power Company.

    e. Name of Project: C.J. Strike Hydroelectric Project.

    f. Location: The project is located on the Snake and Bruneau Rivers in Owyhee and Elmore Counties, Idaho, and occupies federal lands management by the U.S. Bureau of Land Management. The proposed action would occur in Elmore County.

    g. Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Mr. Nathan Gardiner, Idaho Power Company, P.O. Box 70, 1221 W. Idaho Street, Boise, ID 83702. Telephone: (208) 388-2975.

    i. FERC Contact: Any questions on this notice should be addressed to Mr. Christopher Yeakel at (202) 502-8132, or e-mail address: christopher.yeakel@ferc.gov.

    j. Deadline for filing comments and or motions: July 1, 2010.

    Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-filing” link. The Commission strongly encourages electronic filings.

    All documents (original and eight copies) filed by paper should be sent to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P-2055-077) on any comments or motions filed.

    The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    k. Description of Application: The licensee has filed an application requesting Commission authorization to lease approximately 21.23 acres of project land for farming and grazing purposes. The lands proposed for lease are located just west of the C.J. Strike Dam on a terrace above the south shore of the Snake River.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits (P-2055) in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers.

    p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2010-13562 Filed 6-7-10; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
06/08/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-13562
Pages:
32450-32450 (1 pages)
Docket Numbers:
Project No. 2055-077
PDF File:
2010-13562.pdf