2018-12300. Air Plan Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards (“standards”) for sulfur dioxide (SO2).

    DATES:

    This final rule is effective on July 9, 2018.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R09-OAR-2017-0537. All documents in the docket are listed on the https://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through https://www.regulations.gov,, or please contact the person identified in the FOR FURTHER INFORMATION CONTACT section for additional availability information.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ashley Graham, EPA Region IX, (415) 972-3877, graham.ashleyr@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document, the words “we,” “us,” or “our” refer to the EPA.

    Table of Contents

    I. Proposed Action

    II. Public Comments and EPA Responses

    III. EPA Action

    IV. Statutory and Executive Order Reviews

    I. Proposed Action

    On February 16, 2018 (83 FR 6996), the EPA proposed to approve the second 10-year maintenance plan for the Douglas, Arizona SO2 maintenance area. Submitted by the Arizona Department of Environmental Quality on December 14, 2016, the Douglas second 10-year SO2 maintenance plan (“plan”) demonstrates maintenance of the 1971 SO2 standards through 2030.

    We proposed to approve the plan because we determined that it complied with the relevant Clean Air Act (CAA or “Act”) requirements. Our proposed action contains more information on the plan and our evaluation (83 FR 6996, February 16, 2018).

    II. Public Comments and EPA Responses

    The EPA's proposed action provided for a 30-day public comment period. The EPA received eleven anonymous comment letters in response to the proposed action. All eleven comments concerned issues that are outside the scope of our proposed approval of the Douglas second 10-year SO2 maintenance plan. The issues raised in those comments include, but are not limited to, air quality in China and India, natural gas, mining, electric vehicles, wind farms, and wind turbines.

    III. EPA Action

    The EPA is taking final rulemaking action to approve the Douglas second 10-year SO2 maintenance plan under sections 110 and 175A of the CAA. As authorized in section 110(k)(3) of the Act, the EPA is approving the submitted SIP revision because it fulfills all relevant requirements.

    IV. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • Is not an Executive Order 13771 (82 FR 9339, February 2, 2017) regulatory action because SIP approvals are exempted under Executive Order 12866;
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and
    • Does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the Start Printed Page 26597U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it publishes in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by August 7, 2018. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action approving the revision to the State of Arizona's SIP may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2)).

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Intergovernmental relations
    • Reporting and recordkeeping requirements
    • Sulfur dioxide
    End List of Subjects Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority Start Signature

    Dated: May 25, 2018.

    Deborah Jordan,

    Acting Regional Administrator, EPA Region IX.

    End Signature

    Chapter I, title 40 of the Code of Federal Regulations is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart D—Arizona

    Start Amendment Part

    2. In § 52.120, table 1 in paragraph (e) is amended by adding the entry “Maintenance Plan Renewal, 1971 Sulfur Dioxide National Ambient Air Quality Standards, Douglas Maintenance Area” after the entry “Modeling and Emissions Inventory Supplement for the Douglas Sulfur Dioxide Nonattainment Area State Implementation and Maintenance Plan and Redesignation Request, dated September 2005” to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *

    (e) * * *

    Table 1—EPA-Approved Non-Regulatory and Quasi-Regulatory Measures

    [Excluding certain resolutions and statutes, which are listed in tables 2 and 3, respectively] 1

    Name of SIP provisionApplicable geographic or nonattainment area or title/subjectState submittal dateEPA approval dateExplanation
    *         *         *         *         *         *         *
    Part D Elements and Plans (Other than for the Metropolitan Phoenix or Tucson Areas)
    *         *         *         *         *         *         *
    Maintenance Plan Renewal, 1971 Sulfur Dioxide National Ambient Air Quality Standards, Douglas Maintenance AreaDouglas Sulfur Dioxide Air Quality Planning AreaDecember 14, 2016June 8, 2018, [insert Federal Register citation]Adopted by the Arizona Department of Environmental Quality on December 14, 2016. Fulfills requirements for second 10-year maintenance plan.
    *         *         *         *         *         *         *
    1 Table 1 is divided into three parts: Clean Air Act Section 110(a)(2) State Implementation Plan Elements (excluding Part D Elements and Plans), Part D Elements and Plans (other than for the Metropolitan Phoenix or Tucson Areas), and Part D Elements and Plans for the Metropolitan Phoenix and Tucson Areas.
    * * * * *
    End Supplemental Information

    [FR Doc. 2018-12300 Filed 6-7-18; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
7/9/2018
Published:
06/08/2018
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2018-12300
Dates:
This final rule is effective on July 9, 2018.
Pages:
26596-26597 (2 pages)
Docket Numbers:
EPA-R09-OAR-2017-0537, FRL-9979-18-Region 9
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Reporting and recordkeeping requirements
PDF File:
2018-12300.pdf
Supporting Documents:
» 2017-0537_Docket Index - Final
» 2017-0537_Docket Index - Proposal
» C-3_Douglas_modeling_files.zip
» C-2_modeling_readme
» C-1_Douglas 1971 SO2 2nd MP - Modeling TSD
» B-3_Maintenance Plan Renewal, 1971 SO2 NAAQS, Douglas Maintenance Area_December 2016
» B-2_Douglas SO2 Nonattainment Area SIP, Emissions Inventory and Modeling Update_ September 2005
» B-1_Douglas SO2 Nonattainment Area State Implementation and Maintenance Plan_November 2001
» A-11_2018-01-09_83 FR 1098_Air Quality Designations for the 2010 SO2 Primary NAAQS
» A-10_2015-11-02_80 FR 67319_Revisions to Air Plan; AZ; Stationary Sources; NSR, Final rule
CFR: (1)
40 CFR 52.120