97-14917. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 110 (Monday, June 9, 1997)]
    [Notices]
    [Page 31419]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-14917]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-551-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    June 3, 1997.
        Take notice that on May 29, 1997, ANR Pipeline Company (ANR), 500 
    Renaissance Center, Detroit, Michigan 48243, filed a request with the 
    Commission in Docket No. CP97-551-000, pursuant to Sections 157.205, 
    and 157.212 of the Commission's Regulations under the Natural Gas Act 
    (NGA) for authorization to install and operate an orifice meter in 
    Shawano County, Wisconsin authorized in blanket certificate issued in 
    Docket No. CP82-480-000, all as more fully set forth in the request on 
    file with the Commission and open to public inspection.
        ANR proposes to install and operate a 2-inch orifice meter, to 
    accommodate increasing residential demand, at its existing Cecil Meter 
    Station. The total cost of the proposed facility is approximately 
    $22,300.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-14917 Filed 6-6-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/09/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-14917
Pages:
31419-31419 (1 pages)
Docket Numbers:
Docket No. CP97-551-000
PDF File:
97-14917.pdf