98-15321. Extension of the Public Comment Period on the Draft General NPDES Permit for Aquaculture Facilities and on-site Fish Processing Facilities in Idaho (General NPDES Permit ID-G13-0000)  

  • [Federal Register Volume 63, Number 110 (Tuesday, June 9, 1998)]
    [Notices]
    [Pages 31465-31466]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-15321]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [FRL-6109-2]
    
    
    Extension of the Public Comment Period on the Draft General NPDES 
    Permit for Aquaculture Facilities and on-site Fish Processing 
    Facilities in Idaho (General NPDES Permit ID-G13-0000)
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Notice of the 30-day extension of the public comment period for 
    a general permit.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Director, Office of Water, EPA Region 10, is extending the 
    period for public comment on the proposed general National Pollutant 
    Discharge Elimination System (NPDES) permit number ID-G13-0000 for 
    aquaculture facilities and associated, on-site fish processing 
    facilities operating in Idaho, pursuant to the provisions of the Clean 
    Water Act, 33 U.S.C. 1251 et seq. This extension of thirty (30) days 
    will be until July 10, 1998. The date this document originally appeared 
    in the Federal Register was April 10, 1998.
    
    DATES: Comments must be submitted on or before July 10, 1998.
    
    ADDRESSES: Public comments should be sent to: Environmental Protection 
    Agency Region 10, Idaho Office, 1435 North Orchard Street, Boise, Idaho 
    83706, Attn: Carla Fromm.
        A copy of the permit and fact sheet can be obtained at this office, 
    or
    
    Idaho Division of Environmental Quality, 1410 N Hilton, Boise, Idaho 
    83706;
    IDHW-DEQ Twin Falls Regional Office, 601 Pole Line Road, Suite 2, Twin 
    Falls, Idaho 83301;
    IDHW-DEQ Boise Regional Office, 1445 N. Orchard, Boise, Idaho 83706-
    2239;
    IDHW-DEQ Pocatello Regional Office, 224 S. Arthur, Pocatello, Idaho 
    83204;
    IDHW-DEQ Lewiston Regional Office, 1118 F St., Lewiston, Idaho 83501;
    IDHW-DEQ Coeur d'Alene Regional Office, 2110 Ironwood Pkwy, Coeur 
    d'Alene, Idaho 83814; and
    
    [[Page 31466]]
    
    IDHW-DEQ Idaho Falls Regional Office, 900 N. Skyline, Idaho Falls, 
    Idaho 83402.
    
        Copies of the draft general NPDES permit and supporting fact sheet 
    will continue to be available from the EPA Region 10 Public 
    Environmental Resource Center at 1-800-424-4EPA (4372). Both can be 
    downloaded from the Internet website of EPA Region 10's Office of 
    Water--``Public Notices'' at www.epa.gov/r10earth/offices/water/ow.htm.
    
    FOR FURTHER INFORMATION CONTACT: The complete administrative record for 
    the draft general NPDES permit is available for public review. Contact 
    Carla Fromm, EPA Region 10, Idaho Office, 1435 North Orchard Street, 
    Boise, Idaho 83706; (208) 378-5755; [email protected]
    
    SUPPLEMENTARY INFORMATION: Interested persons may submit written 
    comments on the draft general NPDES permit within the extended public 
    comment period to the attention of Carla Fromm at the address and 
    telephone number above. All comments should include the name, address, 
    and telephone number of the commenter and a concise statement of 
    comment on the permit condition(s) and the relevant facts upon which 
    the comment is based. Comments of either support or concern which are 
    directed at specific, cited permit requirements are appreciated. 
    Comments must be submitted to EPA on or before the expiration date of 
    the public notice.
        After the expiration date on the public notice, the Director, 
    Office of Water, EPA Region 10, will make a final determination with 
    respect to issuance of the general permit. The tentative requirements 
    contained in the draft general permit will become final conditions if 
    no substantive comments are received during the public comment period. 
    The permit is expected to become effective by the end of September 
    1998.
        Persons wishing to comment on the State Certification that the 
    general NPDES permit protects Idaho Water Quality Standards should 
    submit written comments within the extended public comment period to 
    the State of Idaho, IDHW-Division of Environmental Quality, 601 Pole 
    Line Road, Suite 2, Twin Falls, Idaho 83301-3035, Attn: Mike McMasters, 
    (telephone: 208-736-2190).
    
        Dated: June 2, 1998.
    Philip G. Millam,
    Director, Office of Water.
    [FR Doc. 98-15321 Filed 6-8-98; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
06/09/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Action:
Notice of the 30-day extension of the public comment period for a general permit.
Document Number:
98-15321
Dates:
Comments must be submitted on or before July 10, 1998.
Pages:
31465-31466 (2 pages)
Docket Numbers:
FRL-6109-2
PDF File:
98-15321.pdf