97-17108. Texas Eastern Transmission Corporation; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 126 (Tuesday, July 1, 1997)]
[Notices]
[Page 35482]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-17108]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-593-000]
Texas Eastern Transmission Corporation; Notice of Request Under
Blanket Authorization
June 25, 1997.
Take notice that on June 19, 1997, Texas Eastern Transmission
Corporation (Texas Eastern), 5400 Westheimer Court, Houston Texas
77054-5310, filed a request with the Commission in Docket No. CP97-593-
000, pursuant to Sec. 157.205 and Sec. 157.211 of the Commission's
Regulations under the Natural Gas Act (NGA) for authorization to
construct a delivery point in Macon County, Tennessee, so that Texas
Eastern may provide natural gas deliveries to the City of Lafayette
(Lafayette), Tennessee authorized in blanket certificate issued in
Docket No. CP82-535-000, all as more fully set forth in the request on
file with the Commission and open to public inspection.
Texas Eastern proposes to construct and install a 2-inch tap valve
and a 20inch check valve on Texas Eastern's existing 30-inch Line Nos.
10 and 15 at approximate Mile Post 318.83 in Macon County, Tennessee
(Tap). In addition to the facilities described above, Lafayette will
install, or cause to be installed, a dual 2-inch turbine meter (Meter
Station), approximately 50 feet of 2-inch pipeline which will extend
from the Meter Station to the Tap, and electronic gas measurement
equipment.
The estimated cost will be approximately $150,000.00 for installing
the facilities. Texas Eastern reports that Lafayette will reimburse
Texas Eastern for 100% of the costs, including an allowance for federal
income taxes.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Section 157.205 of the
Regulations under the NGA (18 CFR 157.205) a protest to the request. If
no protest is filed within the allowed time, the proposed activity
shall be deemed to be authorized effective the day after the time
allowed for filing a protest. If a protest is filed and not withdrawn
within 30 days after the time allowed for filing a protest, the instant
request shall be treated as an application for authorization pursuant
to Section 7 of the NGA.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-17108 Filed 6-30-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/01/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-17108
- Pages:
- 35482-35482 (1 pages)
- Docket Numbers:
- Docket No. CP97-593-000
- PDF File:
-
97-17108.pdf