97-17108. Texas Eastern Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 126 (Tuesday, July 1, 1997)]
    [Notices]
    [Page 35482]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-17108]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-593-000]
    
    
    Texas Eastern Transmission Corporation; Notice of Request Under 
    Blanket Authorization
    
    June 25, 1997.
        Take notice that on June 19, 1997, Texas Eastern Transmission 
    Corporation (Texas Eastern), 5400 Westheimer Court, Houston Texas 
    77054-5310, filed a request with the Commission in Docket No. CP97-593-
    000, pursuant to Sec. 157.205 and Sec. 157.211 of the Commission's 
    Regulations under the Natural Gas Act (NGA) for authorization to 
    construct a delivery point in Macon County, Tennessee, so that Texas 
    Eastern may provide natural gas deliveries to the City of Lafayette 
    (Lafayette), Tennessee authorized in blanket certificate issued in 
    Docket No. CP82-535-000, all as more fully set forth in the request on 
    file with the Commission and open to public inspection.
        Texas Eastern proposes to construct and install a 2-inch tap valve 
    and a 20inch check valve on Texas Eastern's existing 30-inch Line Nos. 
    10 and 15 at approximate Mile Post 318.83 in Macon County, Tennessee 
    (Tap). In addition to the facilities described above, Lafayette will 
    install, or cause to be installed, a dual 2-inch turbine meter (Meter 
    Station), approximately 50 feet of 2-inch pipeline which will extend 
    from the Meter Station to the Tap, and electronic gas measurement 
    equipment.
        The estimated cost will be approximately $150,000.00 for installing 
    the facilities. Texas Eastern reports that Lafayette will reimburse 
    Texas Eastern for 100% of the costs, including an allowance for federal 
    income taxes.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-17108 Filed 6-30-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/01/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-17108
Pages:
35482-35482 (1 pages)
Docket Numbers:
Docket No. CP97-593-000
PDF File:
97-17108.pdf