98-17430. California Independent System Operator Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 126 (Wednesday, July 1, 1998)]
    [Notices]
    [Pages 35921-35924]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-17430]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER98-1850-000, et al.]
    
    
    California Independent System Operator Corporation, et al.; 
    Electric Rate and Corporate Regulation Filings
    
    June 22, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. California Independent System Operator Corporation
    
    [Docket No. ER98-1850-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Automated Power Exchange, Inc., and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. California Independent System Operator Corporation
    
    [Docket No. ER98-1851-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Enron Power Marketing, Inc., and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    3. California Independent System Operator Corporation
    
    [Docket No. ER98-1854-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between LG&E 
    Energy Marketing, Inc., and the ISO for acceptance by the Commission. 
    The ISO states that Amendment No. 1, modifies the Agreement, as 
    directed by the Commission, to comply with the Commission's order 
    issued December 17, 1997 in Pacific Gas and Electric Co., 81 FERC para. 
    61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. California Independent System Operator Corporation
    
    [Docket No. ER98-1856-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between Duke 
    Energy Trading & Marketing, L.L.C. and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. California Independent System Operator Corporation
    
    [Docket No. ER98-1857-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator
    
    [[Page 35922]]
    
    Corporation (ISO), tendered for filing Amendment No. 1, to the Meter 
    Service Agreement for Scheduling Coordinators between Salt River 
    Project Agriculture Improvement and Power District and the ISO for 
    acceptance by the Commission. The ISO states that Amendment No. 1, 
    modifies the Agreement, as directed by the Commission, to comply with 
    the Commission's order issued December 17, 1997 in Pacific Gas and 
    Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. California Independent System Operator Corporation
    
    [Docket No. ER98-1858-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between PG&E 
    Energy Services Corporation and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. California Independent System Operator Corporation
    
    [Docket No. ER98-1859-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Vitol Gas & Electric, L.L.C. and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. California Independent System Operator Corporation
    
    [Docket No. ER98-1862-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Arizona Public Service Company and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. California Independent System Operator Corporation
    
    [Docket No. ER98-1863-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Power Resource Managers, L.L.C., and the ISO for acceptance by the 
    Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. California Independent System Operator Corporation
    
    [Docket No. ER98-1866-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    Edison Source and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. California Independent System Operator Corporation
    
    [Docket No. ER98-1867-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between 
    PacifiCorp and the ISO for acceptance by the Commission. The ISO states 
    that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. California Independent System Operator Corporation
    
    [Docket No. ER98-1889-000]
    
        Take notice that on June 17, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Meter Service Agreement for Scheduling Coordinators between the 
    City of Seattle, City Light Department and the ISO for acceptance by 
    the Commission. The ISO states that Amendment No. 1, modifies the 
    Agreement, as directed by the Commission, to comply with the 
    Commission's order issued December 17, 1997 in Pacific Gas and Electric 
    Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. Rochester Gas and Electric Corporation
    
    [Docket Nos. ER98-2510-000 and ER98-2621-000]
    
        Take notice that on June 17, 1998, Rochester Gas and Electric 
    Corporation (RG&E), filed a response to a deficiency letter received 
    from the Director, Division of Rate Applications, dated
    
    [[Page 35923]]
    
    May 18, 1998 (May 18, Letter) in these proceedings. As part of this 
    response, RG&E submits two Service Agreements for service to Energetix, 
    Inc., and NEV East LLC. RG&E states that these Service Agreements 
    address all the items raised in the May 18, Letter.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. Carolina Power & Light Company
    
    [Docket No. ER98-3385-000]
    
        Take notice that on June 17, 1998, Carolina Power & Light Company 
    (CP&L), tendered for filing un-executed Service Agreements between CP&L 
    and 108 eligible buyers.1
    ---------------------------------------------------------------------------
    
        \1\ The list of the 108 eligible buyers can be found in 
    Attachment A of the application filed June 17, 1998 in the above-
    docketed proceeding.
    ---------------------------------------------------------------------------
    
        Service to each eligible buyer will be in accordance with the terms 
    and conditions of CP&L's Market-Based Rates Tariff, FERC Electric 
    Tariff No. 4, for sales of capacity and energy at market-based rates.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. Puget Sound Energy, Inc.
    
    [Docket No. ER98-3392-000]
    
        Take notice that on June 17, 1998, Puget Sound Energy, Inc., as 
    Transmission Provider, tendered for filing a Service Agreement for Firm 
    Point-To-Point Transmission Service (Firm Point-To-Point Service 
    Agreement) and a Service Agreement for Non-Firm Point-To-Point 
    Transmission Service (Non-Firm Point-To-Point Service Agreement) with 
    Avista Energy, Inc. (Avista), as Transmission Customer.
        A copy of the filing was served upon Avista.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. Fortistar Power Marketing LLC
    
    [Docket No. ER98-3393-000]
    
        Take notice that on June 17, 1998, Fortistar Power Marketing LLC 
    (FPM), tendered for filing pursuant to Rule 205, 18 CFR 385.205, a 
    petition for waivers and blanket approvals under various regulations of 
    the Commission and for an order accepting its FERC Electric Rate 
    Schedule No. 1, to be effective sixty days from the date of this 
    filing. In transactions where FPM will sell electric energy at 
    wholesale, it proposes to make such sales on rates, terms and 
    conditions to be mutually agreed to with the purchasing party.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Carolina Power & Light Company
    
    [Docket No. ER98-3394-000]
    
        Take notice that on June 17, 1998, Carolina Power & Light Company 
    (CP&L), tendered for filing executed Service Agreements between CP&L 
    and the following eligible buyers: Allegheny Power Service Corporation; 
    The Energy Authority; The Power Company of America; and Northern 
    Indiana Public Service Company. Service to each eligible buyer will be 
    in accordance with the terms and conditions of CP&L's Market-Based 
    Rates Tariff, FERC Electric Tariff No. 4, for sales of capacity and 
    energy at market-based rates.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. Carolina Power & Light Company
    
    [Docket No. ER98-3395-000]
    
        Take notice that on June 17, 1998, Carolina Power & Light Company 
    (CP&L), tendered for filing un-executed Service Agreements between CP&L 
    and the following eligible buyers: Avista Energy, Inc.; Cargill-
    Alliant, LLC; First Energy Trading and Power Marketing Incorporated; 
    Plum Street Energy Marketing; and QST Energy Trading. Service to each 
    eligible buyer will be in accordance with the terms and conditions of 
    CP&L's Market-Based Rates Tariff, FERC Electric Tariff No. 4, for sales 
    of capacity and energy at market-based rates.
        Copies of the filing were served upon the North Carolina Utilities 
    Commission and the South Carolina Public Service Commission.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Arizona Public Service Company
    
    [Docket No. ER98-3396-000]
    
        Take notice that on June 17, 1998, Arizona Public Service Company 
    (APS), tendered for filing a Service Agreement under APS' FERC Electric 
    Tariff, Original Volume No. 3, for service to the California 
    Independent System Operator Corporation.
        A copy of this filing has been served on the Arizona Corporation 
    Commission and the California Independent System Operator Corporation.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. New York State Electric & Gas Corporation
    
    [Docket No. ER98-3397-000]
    
        Take notice that on June 17, 1998, New York State Electric & Gas 
    Corporation (NYSEG), tendered for filing pursuant to Section 205 of the 
    Federal Power Act and Section 35.13 of the Federal Energy Regulatory 
    Commission's (FERC or Commission) Regulations, a request for 
    modification of its tax factor applicable to service rendered under 
    Schedules 7 and 8 and Attachment H of NYSEG's OATT.
        NYSEG requests an effective date of August 17, 1998, for the new 
    tax factor.
        NYSEG has served copies of the filing on the parties on the 
    official service list of the OATT. In addition, NYSEG has mailed copies 
    of the filing to NYPSC, NYPA, and the customers taking service under 
    the OATT.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Southern Company Services, Inc.
    
    [Docket No. ER98-3398-000]
    
        Take notice that on June 17, 1998, Southern Company Services, Inc. 
    (SCSI), acting on behalf of Alabama Power Company, Georgia Power 
    Company, Gulf Power Company, Mississippi Power Company and Savannah 
    Electric and Power Company (collectively referred to as Southern 
    Companies), filed a service agreement under Southern Companies' Market-
    Based Rate Power Sales Tariff (FERC Electric Tariff, Original Volume 
    No. 4) with The XERXE Group, Inc. SCSI states that the service 
    agreements will enable Southern Companies to engage in short-term 
    market-based rate sales to this customer.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Western Resources, Inc.
    
    [Docket No. ER98-3401-000]
    
        Take notice that on June 17, 1998, Western Resources, Inc., 
    tendered for filing an agreement between Western Resources and Ameren 
    Services Company, Western Resources and Missouri Public Service, 
    Western Resources and Koch Energy Trading, Inc., Western Resources and 
    PacifiCorp Power Marketing, Inc., and Western Resources and Omaha 
    Public Power District. Western Resources states that the purpose of the 
    agreements is to permit the customers to take service
    
    [[Page 35924]]
    
    under Western Resources' market-based power sales tariff on file with 
    the Commission. The agreements are proposed to become effective May 19, 
    1998, May 18, 1998, May 20, 1998, May 28, 1998 and June 17, 1998, 
    respectively.
        Copies of the filing were served upon Ameren Services Company, 
    Missouri Public Service, Koch Energy Trading, Inc., PacifiCorp Power 
    Marketing, Inc., Omaha Public Power District, and the Kansas 
    Corporation Commission.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. PJM Interconnection, L.L.C.
    
    [Docket No. ER98-3402-000]
    
        Take notice that on June 17, 1998, PJM Interconnection, L.L.C. 
    (PJM), tendered for filing amendments to the service agreements for 
    Network Integration Transmission Service for Delmarva Power & Light 
    Company and PP&L, Inc., so as to reflect that, commencing June 1, 1998, 
    the load of the Easton Utilities Commission will be served by PP&L 
    rather than Delmarva.
        Copies of this filing were served upon Delmarva, PP&L, Easton, the 
    Maryland Public Service Commission, and the Pennsylvania Public Utility 
    Commission.
        PJM requests an effective date of June 1, 1998, for the amendments 
    to the service agreements.
        Comment date: July 7, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-17430 Filed 6-30-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
07/01/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-17430
Dates:
July 7, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
35921-35924 (4 pages)
Docket Numbers:
Docket No. ER98-1850-000, et al.
PDF File:
98-17430.pdf