98-17516. Agency Information Collection Activities: Submission for OMB Review; Comment Request; New Source Performance Standards for Portland Cement Plants  

  • [Federal Register Volume 63, Number 126 (Wednesday, July 1, 1998)]
    [Notices]
    [Page 35926]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-17516]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [FRL-6118-7]
    
    
    Agency Information Collection Activities: Submission for OMB 
    Review; Comment Request; New Source Performance Standards for Portland 
    Cement Plants
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 
    et seq.), this document announces that the following Information 
    Collection Request (ICR) has been forwarded to the Office of Management 
    and Budget (OMB) for review and approval: New Source Performance 
    Standards for Portland Cement Plants, OMB Control No. 2060-0025, 
    expiration date 8/31/98. The ICR describes the nature of the 
    information collection and its expected burden and cost; where 
    appropriate, it includes the actual data collection instrument.
    
    DATES: Comments must be submitted on or before July 31, 1998.
    
    FOR FURTHER INFORMATION CONTACT: For a copy of the ICR, call Sandy 
    Farmer at EPA, by phone at (202) 260-2740, by E-Mail at 
    Farmer.Sandy@epamail.epa.gov or download off the Internet at http://
    www.epa.gov/icr/icr.htm, and refer to EPA ICR No. 1051.07
    
    SUPPLEMENTARY INFORMATION:
        Title: New Source Performance Standards for Portland Cement Plants, 
    OMB Control No. 2060-0025; EPA ICR No. 1051.07; expiring 8/31/98. This 
    is a request for the extension of a currently approved collection.
        Abstract: Entities potentially affected by this action are portland 
    cement plants with the following facilities: kilns, clinker coolers, 
    raw mill systems, raw mill dryers, raw material storage, clinker 
    storage, finished product storage, conveyor transfer points, bagging 
    and bulk loading and unloading systems. The Administrator has judged 
    that PM emissions from portland cement plants cause or contribute to 
    air pollution that may reasonably be anticipated to endanger public 
    health or welfare. Owners/operators of portland cement plants must 
    notify EPA of construction, modification, startups, shut downs, date 
    and results of initial performance test and excess emissions. In order 
    to ensure compliance with the standards promulgated to protect public 
    health, adequate reporting and recordkeeping is necessary. In the 
    absence of such information enforcement personnel would be unable to 
    determine whether the standards are being met on a continuous basis, as 
    required by the Clean Air Act. An agency may not conduct or sponsor, 
    and a person is not required to respond to, a collection of information 
    unless it displays a currently valid OMB control number. The OMB 
    control numbers for EPA's regulations are listed in 40 CFR part 9 and 
    48 CFR Chapter 15. The Federal Register document required under 5 CFR 
    1320.8(d), soliciting comments on this collection of information was 
    published on 3/5/98. No comments were received.
        Burden Statement: The annual public reporting and recordkeeping 
    burden for this collection of information is estimated to average 279 
    hours per response. Burden means the total time, effort, or financial 
    resources expended by persons to generate, maintain, retain, or 
    disclose or provide information to or for a Federal agency. This 
    includes the time needed to review instructions; develop, acquire, 
    install, and utilize technology and systems for the purposes of 
    collecting, validating, and verifying information, processing and 
    maintaining information, and disclosing and providing information; 
    adjust the existing ways to comply with any previously applicable 
    instructions and requirements; train personnel to be able to respond to 
    a collection of information; search data sources; complete and review 
    the collection of information; and transmit or otherwise disclose the 
    information.
        Respondents/Affected Entities: Owners/Operators of Portland Cement 
    Plants.
        Estimated Number of Respondents: 113.
        Frequency of Response: Initial and semiannual.
        Estimated Total Annual Hour Burden: 7,968 hours.
        Estimated Total Annualized Cost Burden: $941,720.
        Send comments on the Agency's need for this information, the 
    accuracy of the provided burden estimates, and any suggested methods 
    for minimizing respondent burden, including through the use of 
    automated collection techniques to the following addresses. Please 
    refer to EPA ICR No. 1051.07 and OMB Control No. 2060-0025 in any 
    correspondence.
    
    Ms. Sandy Farmer, U.S. Environmental Protection Agency, OPPE Regulatory 
    Information Division (2137), 401 M Street, SW, Washington, DC 20460;
      and
    
    Office of Information and Regulatory Affairs, Office of Management and 
    Budget, Attention: Desk Officer for EPA, 725 17th Street, NW, 
    Washington, DC 20503.
    
        Dated: June 25, 1998.
    Joseph Retzer,
    Director, Regulatory Information Division.
    [FR Doc. 98-17516 Filed 6-30-98; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
07/01/1998
Department:
Environmental Protection Agency
Entry Type:
Notice
Action:
Notice.
Document Number:
98-17516
Dates:
Comments must be submitted on or before July 31, 1998.
Pages:
35926-35926 (1 pages)
Docket Numbers:
FRL-6118-7
PDF File:
98-17516.pdf