[Federal Register Volume 64, Number 126 (Thursday, July 1, 1999)]
[Notices]
[Pages 35642-35644]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-16764]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER99-3127-000, et al.]
Bishop Power Company, Inc. et al.; Electric Rate and Corporate
Regulation Filings
June 23, 1999.
Take notice that the following filings have been made with the
Commission:
1. Bishop Power Company, Inc.
[Docket No. ER99-3127-000]
Take notice that on June 18, 1999, Bishop Power Company, Inc.
(Bishop Power) submitted an amendment to Bishop Power's petition for
acceptance
[[Page 35643]]
of Bishop Power Rate Schedule FERC No. 1; the granting of certain
blanket approvals, including the authority to sell electricity at
market-based rates; and the waiver of certain Commission Regulations.
The amendment provides additional information about the ownership of
Bishop Power.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
2. Entergy Services, Inc.
[Docket No. ER99-3133-000]
Take notice that on June 18, 1999, Entergy Services, Inc., on
behalf of Entergy Gulf States, Inc., tendered for filing changes to the
Generator Imbalance Agreement with Dow Chemical Co.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
3. Entergy Services, Inc.
[Docket No. ER99-3175-000]
Take notice that on June 18, 1999, Entergy Services, Inc., on
behalf of Entergy Gulf States, Inc., tendered for filing changes to the
Generator Imbalance Agreement with Crown Paper Co. d/b/a Crown Vantage.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
4. Alliant Energy Services Company, Inc.
[Docket No. ER99-3292-000]
Take notice that on June 17, 1999, Alliant Energy Services Company,
Inc. (Alliant) on behalf of Interstate Power Company (IPC) and
Wisconsin Power & Light Company (WPL), tendered for filing a Negotiated
Capacity Transaction (Agreement) between IPC and WPL for the period
June 1, 1999 through August 31, 1999. The Agreement was negotiated to
provide service under the IEC System and Coordination and Operating
Agreement among IES Utilities Inc., Interstate Power Company, Wisconsin
Power & Light Company and Alliant.
Comment date: July 7, 1999, in accordance with Standard Paragraph E
at the end of this notice.
5. Alliant Energy Services Company, Inc.
[Docket No. ER99-3293-000]
Take notice that on June 17, 1999, Alliant Energy Services Company,
Inc. (Alliant) on behalf of Wisconsin Power & Light Company (WPL) and
Interstate Power Company (IPC), tendered for filing a Negotiated
Capacity Transaction (Agreement) between WPL and IPC for the period
June 1, 1999 through August 31, 1999. The Agreement was negotiated to
provide service under the Alliant Energy Corporation System and
Coordination and Operating Agreement among IES Utilities Inc.,
Interstate Power Company, Wisconsin Power & Light Company and Alliant.
Comment date: July 7, 1999, in accordance with Standard Paragraph E
at the end of this notice.
6. PP&L, Inc.
[Docket No. ER99-3294-000]
Take notice that on June 18, 1999, PP&L, Inc. (PP&L), tendered for
filing with the Commission an application to amend its Market-Based
Rate Tariff, FERC Electric Tariff Revised Volume No. 5, to allow PP&L
to sell specified ancillary services at market-based rates.
PP&L requested waiver of Commission regulations to permit the
tariff amendment to become effective on June 21, 1999.
PP&L stated that it served a copy of the foregoing on the
Pennsylvania Public Utility Commission and on those parties who have
executed service agreements under PP&L's Market-Based Rate Tariff.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
7. TXU Electric Company
[Docket No. ER99-3295-000]
Take notice that on June 18, 1999, TXU Electric Company (TXU
Electric ), tendered for filing a notice of succession pursuant to
Section 35.16 of the Commission's Regulations, 18 CFR 35.16. As a
result of a name change, TXU Electric is succeeding to the tariffs and
related service agreements of Texas Utilities Electric Company,
effective June 14, 1999.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
8. Illinois Power Company
[Docket No. ER99-3296-000]
Take notice that on June 18, 1999, Illinois Power Company (Illinois
Power), 500 South 27th Street, Decatur, Illinois 62526, tendered for
filing firm and non-firm transmission agreements under which Ameren
Services Company will take transmission service pursuant to its open
access transmission tariff. The agreements are based on the Form of
Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of June 1, 1999.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
9. UtiliCorp United Inc.
[Docket No. ER99-3297-000]
Take notice that on June 18, 1999, UtiliCorp United Inc., on behalf
of its Missouri Public Service operating division, tendered for filing
an Interconnection Agreement between UtiliCorp United Inc., d/b/a
Missouri Public Service and MEP Pleasant Hill LLC dated June 4, 1999.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
10. Commonwealth Edison Company
[Docket No. ER99-3298-000]
Take notice that on June 18, 1999, Commonwealth Edison Company
(ComEd), tendered for filing service agreements establishing
DukeSolutions, Inc. (Duke), Otter Tail Power Company (OTP), and
Duquesne Light Company (Duquesne), as customers under ComEd's FERC
Electric Market Based-Rate Schedule for power sales.
ComEd requests an effective date of June 18, 1999, for the Service
Agreements, and accordingly, seeks waiver of the Commission's notice
requirements.
Copies of the filing were served on Duke, OTP and Duquesne.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
11. Central Maine Power Company
[Docket No. ER99-3299-000]
Take notice that on June 18, 1999, Central Maine Power Company
(CMP), tendered for filing an executed service agreement for sale of
capacity and/or energy entered into with Williams Energy Marketing &
Trading. Service will be provided pursuant to CMP's Wholesale Market
Tariff, Volume No. 4, as supplemented.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
12. Central Maine Power Company
[Docket No. ER99-3300-000]
Take notice that on June 18, 1999, Central Maine Power Company
(CMP), tendered for filing an executed service agreement for sale of
capacity and/or energy entered into with ENRON Power Marketing, Inc.
Service will be provided pursuant to CMP's Wholesale Market Tariff,
Volume No. 4, as supplemented.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
[[Page 35644]]
13. Entergy Services, Inc.
[Docket No. ER99-3302-000]
Take notice that on June 18, 1999, Entergy Services, Inc. (Entergy
Services), on behalf of Entergy Gulf States, Inc. (EGSI), tendered for
filing a Generator Imbalance Agreement with Exxon Company, U.S.A.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
14. West Texas Utilities Company
[Docket No. ER99-3312-000]
Take notice that on June 18, 1999, West Texas Utilities Company
(WTU), tendered for filing a letter agreement to supplement the Control
Area Services Agreement currently on file between WTU, Rayburn Country
Electric Cooperative, Inc. (Rayburn) and LG&E Energy Marketing, Inc.,
(LEM).
WTU requests an effective date of June 22, 1998, and, accordingly,
seeks waiver of the Commission's notice requirements.
Copies of the filing have been served on Rayburn, LEM and the
Public Utility Commission of Texas.
Comment date: July 8, 1999, in accordance with Standard Paragraph E
at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions
or protests should be filed on or before the comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party must file a motion
to intervene. Copies of these filings are on file with the Commission
and are available for public inspection. This filing may also be viewed
on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-
208-2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-16764 Filed 6-30-99; 8:45 am]
BILLING CODE 6717-01-P