2020-14185. Northern Natural Gas Company; Notice of Application  

  • Start Preamble

    Take notice that on June 11, 2020, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, NE 68124-1000, filed in Docket No. CP20- 479-000 an application pursuant to section 7(b) and 7(c) of the Natural Gas Act (NGA) and part 157 of the Commission's regulations for authorization to abandon in-place the Auburn A-branch line located in Lancaster, Otoe, Johnson, and Nemaha counties, Nebraska. Northern Natural further seeks authorization to construct and operate a branch line loop consisting of approximately 4.3 miles of 8-inch-diameter pipeline and a pig launcher and regulation station and associated appurtenances in Lancaster and Otoe counties, Nebraska (Auburn J-Line Loop). Northern Natural estimates the cost of the Auburn J-Line Loop project to be $7,777,080, all as more fully described in their application which is on file with the Commission and open to public inspection.

    In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's Home Page (http://ferc.gov) using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission's Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID-19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.

    Any questions concerning this application may be directed to Michael T. Loeffler, Senior Director Certificates and External Affairs, Northern Natural Gas Company, P.O. Box 3330, Omaha, NE 68103-0330, by telephone at (402) 398-7103, by facsimile at (402) 398-7592, or by email at mike.loeffler@nngco.com.

    Pursuant to § 157.9 of the Commission's rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the environmental assessment (EA) for this proposal. The issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    As of the February 27, 2018 date of the Commission's order in Docket No. Start Printed Page 39557CP16- 4-001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.[1] Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to “show good cause why the time limitation should be waived,” and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission's Rules and Regulations.[2]

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.

    Comment Date: 5:00 p.m. Eastern Standard Time on July 16, 2020.

    Start Signature

    Dated: June 25, 2020.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018).

    Back to Citation

    [FR Doc. 2020-14185 Filed 6-30-20; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
07/01/2020
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2020-14185
Dates:
5:00 p.m. Eastern Standard Time on July 16, 2020.
Pages:
39556-39557 (2 pages)
Docket Numbers:
Docket No. CP20-479-000
PDF File:
2020-14185.Pdf