96-17510. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 133 (Wednesday, July 10, 1996)]
    [Notices]
    [Pages 36362-36363]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-17510]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-611-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    July 3, 1996.
        Take notice that on June 28, 1996, Northwest Pipeline Corporation 
    (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, filed in 
    Docket No. CP96-611-000 a request pursuant to Sections 157.205, 157.216 
    and 157.211 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.216 and 157.211) for approval to upgrade its 
    Burley No. 2 Meter Station in Cassia County, Idaho by abandoning 
    certain facilities and constructing and operating upgraded replacement 
    facilities to accommodate a request by Intermountain Gas Company, a 
    local distribution company, for additional delivery capacity and 
    delivery pressure at the Burley No. 2 delivery point under Northwest's 
    blanket certificate issued in Docket No. CP82-433-000 pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        Northwest proposes to upgrade the Burley No. 2 Meter Station by 
    replacing the two existing 2-inch regulators and appurtenances with two 
    new 4-inch regulators and appurtenances. Northwest states that with 
    this proposed upgrade the maximum design capacity of the meter station 
    would increase from approximately 10,933 Dth per day at 300 psig to 
    approximately 24,405 Dth per day at 475 psig. Northwest estimates that 
    the total cost of the proposed facility replacement at the Burley No. 2 
    Meter Station to be approximately $41,500.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section
    
    [[Page 36363]]
    
    157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a 
    protest to the request. If no protest is filed within the time allowed 
    therefor, the proposed activity shall be deemed to be authorized 
    effective the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-17510 Filed 7-9-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/10/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-17510
Pages:
36362-36363 (2 pages)
Docket Numbers:
Docket No. CP96-611-000
PDF File:
96-17510.pdf