2015-16182. Notice of Final Federal Agency Actions on US 69/Loop 49 North Lindale Reliever Route, Smith County, Texas  

  • Start Preamble

    AGENCY:

    Federal Highway Administration (FHWA), U.S. DOT.

    ACTION:

    Notice of Limitation on Claims for Judicial Review of Actions by TxDOT and Federal Agencies.

    SUMMARY:

    This notice announces actions taken by Texas Department of Transportation (TxDOT) and Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 69/Loop 49 North Lindale Reliever Route, Smith County, Texas. Those actions grant licenses, permits, and approvals for the project.

    DATES:

    By this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 7, 2015. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Carlos Swonke, P.G., Environmental Affairs Division, Texas Department of Transportation, 125 East 11th Street, Austin, Texas 78701; telephone: (512) 416-2734; email: carlos.swonke@txdot.gov. TxDOT normal business hours are 8:00 a.m. to 5:00 p.m. (central time) Monday through Friday.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Notice is hereby given that TxDOT and Federal agencies have taken final agency actions by issuing licenses, permits, and approvals for the following highway project in the State of Texas: US 69/Loop 49 North Lindale Reliever Route, Smith County, Texas. The project will construct a new location, full control of access reliever route around the city of Lindale in Smith County, Texas, referred to as U.S. Highway (US) 69/Loop 49 North Lindale Reliever Route (Lindale Reliever Route). The proposed action is intended to provide relief to the existing US 69 through the city of Lindale and extend a proposed toll facility (Loop 49 West) from Interstate Highway (IH) 20 southwest of Lindale to US 69 north of Lindale, a distance of approximately seven miles.

    The actions by TxDOT and the Federal agencies, and the laws under which such actions were taken, are described in the Final Environmental Impact Statement (FEIS) for the project, approved on February 10, 2015, in the Record of Decision (ROD) issued on April 24, 2015, and in other documents in the TxDOT administrative record. The FEIS, ROD, and other documents in the administrative record file are available by contacting TxDOT at the address provided above. The FEIS and ROD can be viewed on the project Web site at http://www.txdot.gov/​inside-txdot/​projects/​studies/​tyler/​us69-loop49.html. This notice applies to all TxDOT decisions and Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:

    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].

    2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].

    3. Land: Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers), 23 U.S.C. 319.

    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and Section 1536]; Fish and Wildlife Coordination Act [16 U.S.C. 661-667(d)]; Migratory Bird Treaty Act [16 U.S.C. 703-712].

    5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 470(aa)-11]; Archeological and Historic Preservation Act [16 U.S.C. 469-469(c)]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C. 3001-3013].

    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Start Printed Page 39832Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].

    7. Wetlands and Water Resources: Land and Water Conservation Fund (LWCF) [16 U.S.C. 4601-4604]; Safe Drinking Water Act (SDWA) [42 U.S.C. 300(f)-300(j)(6)]; Rivers and Harbors Act of 1899 [33 U.S.C. 401-406]; Wild and Scenic Rivers Act [16 U.S.C. 1271-1287]; Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; TEA-21 Wetlands Mitigation [23 U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood Disaster Protection Act [42 U.S.C. 4001-4128].

    8. Executive Orders: E.O. 11990, Protection of Wetlands; E.O. 11988, Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593, Protection and Enhancement of Cultural Resources; E.O. 13007, Indian Sacred Sites; E.O. 13287, Preserve America; E.O. 13175, Consultation and Coordination with Indian Tribal Governments; E.O. 11514, Protection and Enhancement of Environmental Quality; E.O. 13112, Invasive Species; E.O. 12372, Intergovernmental Review of Federal Programs.

    The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

    Start Authority

    Authority: 23 U.S.C. 139(l)(1).

    End Authority Start Signature

    Issued on: June 22, 2015.

    Michael T. Leary,

    Director, Planning and Program Development, Federal Highway Administration.

    End Signature End Supplemental Information

    [FR Doc. 2015-16182 Filed 7-9-15; 8:45 am]

    BILLING CODE 4910-22-P

Document Information

Published:
07/10/2015
Department:
Transportation Department
Entry Type:
Notice
Action:
Notice of Limitation on Claims for Judicial Review of Actions by TxDOT and Federal Agencies.
Document Number:
2015-16182
Dates:
By this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 7, 2015. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
Pages:
39831-39832 (2 pages)
PDF File:
2015-16182.pdf
Supporting Documents:
» Final Federal Agency Actions: Proposed Highway in California
» Final Federal Agency Actions: Proposed Highway Projects in Texas
» Transfer and Sanction Programs
» Experimental Project To Evaluate Proposals for Delegation of Certain Program-Wide FHWA Responsibilities to States
» Environmental Impact Statements; Availability, etc.: Multiple Counties in Alabama; Rescission
» Federal Agency Actions: SH 205 From North of John King (Rockwall County Line) to SH 78 in Collin County, TX
» Federal Agency Actions: Interstate 95 in City of Fredericksburg and Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VA
» Environmental Impact Statements; Availability, etc.: I-495 and I-270 Managed Lanes Study, Montgomery and Prince George's Counties, MD and Fairfax County, VA
» Federal Agency Actions: Proposed Highway in California
» Federal Agency Actions: California; Proposed Highway