-
Start Preamble
Take notice that Shenango Dam Hydroelectric Company, LLC, permittee for the proposed Shenango Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on December 2, 2015, and would have expired on November 30, 2018.[1] The project would have been located at the U.S. Army Corps of Engineers' Shenango dam on the Shenango River, near the Borough of Sharpsburg, Mercer County, Pennsylvania.
The preliminary permit for Project No. 14698 will remain in effect until the close of business, July 30, 2017. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.[2] New applications for this site may not be submitted until after the permit surrender is effective.
Start SignatureDated: June 30, 2017.
Kimberly D. Bose,
Secretary.
Footnotes
1. 153 FERC ¶ 62,155 (2015).
Back to Citation2. 18 CFR 385.2007(a)(2) (2016).
Back to Citation[FR Doc. 2017-14336 Filed 7-7-17; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 07/10/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-14336
- Pages:
- 31768-31768 (1 pages)
- Docket Numbers:
- Project No. 14698-001
- PDF File:
- 2017-14336.pdf