[Federal Register Volume 60, Number 132 (Tuesday, July 11, 1995)]
[Notices]
[Pages 35736-35737]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-16885]
-----------------------------------------------------------------------
[[Page 35737]]
DEPARTMENT OF ENERGY
[Docket No. RP95-362-000]
Koch Gateway Pipeline Company; Notice of Proposed Changes in FERC
Gas Tariff
July 5, 1995.
Take notice that on June 30, 1995, Koch Gateway Pipeline Company
(Koch Gateway) tendered for filing revised tariff sheets, proposing
limited changes to its FERC Gas Tariff, Fifth Revised Volume No. 1, to
establish market-based transportation rates for its firm and
interruptible transportation services.
Koch Gateway states this filing will affect Koch Gateway's firm and
interruptible transportation services and will not affect the rates
which Koch Gateway charges for its no-notice service, no-notice--small
customer option service or firm transportation--small customer option
service. Koch Gateway further states that the filing will also not
affect the market-based storage rates Koch Gateway is currently
charging. Koch Gateway is not proposing that all terms and conditions
of each contract be individually negotiated. Gathering rates will be
affected depending on the availability of alternatives and the type of
contract being supplied.
Koch Gateway proposes limited changes to its tariff listed on
Appendix A to the filing. Koch Gateway states that the tariff changes
included in this filing are only those changes necessary to implement
market-based rates.
Koch Gateway states that it does not propose to change the cost of
service or cost allocation and rate design approved in Docket No. RS92-
26, or in Docket No. RP94-120 when that case is resolved, for any
service in this filing.
Koch Gateway states that it is not proposing a specific effective
date for these tariff sheets at this time, but is proposing an
indefinite suspension period. A proposed procedural schedule for the
Commission's consideration is included with the filing, and Koch
Gateway requests that any hearing will commence no later than October
1, 1996.
Koch Gateway requests the Commission to issue an initial hearing
order on or before October 1, 1995. If the proposed procedural schedule
is utilized, Koch Gateway states it does not intend seeking to move the
proposed rates into effect until after the conclusion of any hearing.
Koch Gateway submits its filing as a limited Section 4(e) filing
and requests all necessary waivers including, but not limited to, a
waiver of 18 CFR 154.51 to allow acceptance for filing more than 60
days before the proposed effective date; a waiver of 18 CFR
154.63(b)(iv), as to submission on electronic media, and 18 CFR
154.63(c)(2), submission of Form 2. Koch Gateway is specifically not
making any motion, at this time, pursuant to 18 CFR 154.67(a). Koch
Gateway recognizes that at least 30 days prior to the effective date of
these tariff sheets, Koch Gateway must file a motion to move them into
effect as of a specific date.
Koch Gateway states that copies of the filing have been mailed to
all of its jurisdictional customers, other parties, inter alia, state
regulatory commissions and other government agencies.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with 18 CFR 385.214 and 385.211 of the
Commission's Rules and Regulations. All such motions or protests should
be filed on or before July 12, 1995. Protests will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to this proceeding. Any person
wishing to become a party must file a motion to intervene. Copies of
this filing are on file with the Commission and are available for
public inspection in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 95-16885 Filed 7-10-95; 8:45 am]
BILLING CODE 6717-01-M