96-17626. Texas Eastern Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 61, Number 134 (Thursday, July 11, 1996)]
[Notices]
[Pages 36557-36558]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17626]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. TM96-4-17-000]
Texas Eastern Transmission Corporation; Notice of Proposed
Changes in FERC Gas Tariff
July 5, 1996.
Take notice that Texas Eastern Transmission Corporation (Texas
Eastern) on July 1, 1996 tendered for filing as part of its FERC Gas
Tariff, Sixth Revised Volume No. 1 and Original Volume No. 2, revised
tariff sheets listed on Appendix A to the filing to become effective
August 1, 1996.
Texas Eastern states that these revised tariff sheets are filed
pursuant to Section 15.1, Electric Power Cost (EPC) Adjustment, of the
General Terms and Conditions of Texas Eastern's FERC Gas Tariff, Sixth
Revised Volume No. 1. Texas Eastern states that Section 15.1 provides
that Texas Eastern shall file to be effective each August 1 revised
rates for each applicable zone and rate schedule based upon the
projected annual electric power costs required for the operation of
transmission compressor stations with electric motor prime movers.
Texas Eastern states that these revised tariff sheets are being
filed to reflect changes in Texas Eastern's projected costs for the use
of electric power for the twelve month period beginning August 1, 1996.
Texas Eastern states that the rate changes proposed to the primary firm
capacity reservation charges, usage rates and 100% load factor average
costs for full Access Area Boundary service from the Access Area Zone,
East Louisiana, to the three market area zones are as follows:
----------------------------------------------------------------------------------------------------------------
Zone Reservation Usage 100% LF
----------------------------------------------------------------------------------------------------------------
Market 1.............................. $0.002/dth $(.0003)/dth $(.0002)/dth
Market 2.............................. $0.008/dth $(.0009)/dth $(.0006)/dth
Market 3.............................. $0.013/dth $(.0013)/dth $(.0009)/dth
----------------------------------------------------------------------------------------------------------------
Texas Eastern states that copies of its filing have been served on
all firm customers of Texas Eastern and current interruptible shippers
and interested state commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Section 385.214 and 385.211 of the Commission's
Rules and Regulations. All such motions or protests must be filed as
provided in Section 154.210 of
[[Page 36558]]
the Commission's Regulations. Protests will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Any person
wishing to become a party must file a motion to intervene. Copies of
this filing are on file with the Commission and are available for
public inspection in the Public Reference Room.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 96-17626 Filed 7-11-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/11/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-17626
- Pages:
- 36557-36558 (2 pages)
- Docket Numbers:
- Docket No. TM96-4-17-000
- PDF File:
-
96-17626.pdf