97-18185. Colorado Interstate Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 133 (Friday, July 11, 1997)]
    [Notices]
    [Page 37214]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-18185]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-610-000]
    
    
    Colorado Interstate Gas Company; Notice of Request Under Blanket 
    Authorization
    
    July 7, 1997.
        Take notice that on June 27, 1997, Colorado Interstate Gas Company 
    (CIG), P.O. Box 1087, Colorado Springs, Colorado 80944 filed in Docket 
    No. CP97-610-000 a request pursuant to Sections 157.205 and 157.211 of 
    the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 
    and 157.211) for authorization to construct a new meter station at an 
    existing delivery point in Douglas County, Colorado, under CIG's 
    blanket certificate issued in Docket No. CP83-21-000, pursuant to 
    Section 7(c) of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        CIG proposes to construct a new meter station at its existing Bayou 
    Gulch delivery point, located near Castle Rock, in Douglas County, 
    Colorado where gas is delivered to UtiliCorp United Incorporated 
    (UtiliCorp). CIG states that the existing delivery point to UtiliCorp 
    is a 2 inch side tap delivery facility on its 20-inch main transmission 
    line that was constructed pursuant to a Prior Notice filing in Docket 
    No. CP84-762-000. CIG explains that currently UtiliCorp owns and 
    maintains the measurement equipment at the Bayou Gulch delivery point. 
    CIG claims that by installing CIG owned and operated measurement 
    facilities at this point, it will be possible to accurately measure 
    volumes being supplied to this no-noticed customer. CIG proposes to 
    install a Roots Gas Meter, a solar powered remote operating controler, 
    and telemetry so it will know promptly if there are problems with gas 
    flow at this point that serves a housing development.
        CIG states that the estimated cost of the propposed facilities is 
    approximately $36,300. Additionally, CIG indicates that it has obtained 
    all required environmental clearances.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursaunt to Sec. 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-18185 Filed 7-10-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/11/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-18185
Pages:
37214-37214 (1 pages)
Docket Numbers:
Docket No. CP97-610-000
PDF File:
97-18185.pdf