94-16778. Texas Eastern Transmission Corporation; Proposed Changes in FERC Gas Tariff
[Federal Register Volume 59, Number 132 (Tuesday, July 12, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-16778]
[[Page Unknown]]
[Federal Register: July 12, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. TM94-5-17-000]
Texas Eastern Transmission Corporation; Proposed Changes in FERC
Gas Tariff
July 6, 1994.
Take notice that on June 30, 1994, Texas Eastern Transmission
Corporation (Texas Eastern) tendered for filing as part of its FERC Gas
Tariff, Sixth Revised Volume No. 1 and Original Volume No. 2, revised
tariff sheets listed on Appendix A to the filing. The proposed
effective date of these revised tariff sheets is August 1, 1994.
Texas Eastern states that these revised tariff sheets are filed
pursuant to section 15.1, Electric Power Cost (EPC) Adjustment, of the
General Terms and Conditions of Texas Eastern's FERC Gas Tariff, Sixth
Revised Volume No. 1. Texas Eastern states that section 15.1 provides
that Texas Eastern shall file to be effective each August 1 revised
rates for each applicable zone and rate schedule based upon the
projected annual electric power costs required for the operation of
transmission compressor stations with electric motor prime movers.
Texas Eastern states that these revised tariff sheets are being
filed to reflect changes in Texas Eastern's projected expenditures for
electric power for the twelve month period beginning August 1, 1994
based upon the latest available actual expenditures for the twelve
month period ending May 31, 1994, which is the first full twelve month
period of experience under Texas Eastern's Order No. 636 tariff.
Texas Eastern states that copies of its filing have been served on
all firm customers of Texas Eastern and current interruptible shippers
and interested state commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Regulatory
Commission, 825 North Capitol Street, NE., Washington, DC 20426, in
accordance with Secs. 385.214 and 385.211 of the Commission's Rules and
Regulations. All such motions or protests should be filed on or before
July 13, 1994. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public inspection
in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 94-16778 Filed 7-11-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/12/1994
- Department:
- Energy Department
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-16778
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: July 12, 1994, Docket No. TM94-5-17-000