94-16781. Transcontinental Gas Pipe Line Corporation; Proposed Changes In FERC Gas Tariff  

  • [Federal Register Volume 59, Number 132 (Tuesday, July 12, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-16781]
    
    
    [[Page Unknown]]
    
    [Federal Register: July 12, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. TM94-14-29-000]
    
     
    
    Transcontinental Gas Pipe Line Corporation; Proposed Changes In 
    FERC Gas Tariff
    
    July 6, 1994.
        Take notice that on July 1, 1994 Transcontinental Gas Pipe Line 
    Corporation (TGPL) tendered for filing as part of its FERC Gas Tariff, 
    Third Revised Volume No. 1, Ninth Revised Sheet No. 60, which tariff 
    sheet is proposed to be effective on August 1, 1994.
        TGPL states that the instant filing is submitted pursuant to 
    Section 39 of the General Terms and Conditions of TGPL's FERC Gas 
    Tariff which provides that TGPL will file to adjust its Great Plains 
    Volumetric Surcharge (GPS) 30 days prior to each GPS Annual Period 
    beginning August 1. The GPS Surcharge is designed to recover: (i) The 
    cost of gas purchased from Great Plains Gasification Associates (or its 
    successor) which exceeds the Spot Index (as defined in Section 39 of 
    the General Terms), and (ii) the related cost of transporting such gas.
        The revised GPS Surcharge included therein consists of two 
    components--the Current GPS Surcharge calculated for the period August 
    1, 1994 through July 31, 1995 plus the Great Plains Deferred Account 
    Surcharge (Deferred Surcharge). The determination of the Deferred 
    Surcharge is based on the balance in the current GPS subaccount plus 
    accumulated interest at April 30, 1994.
        TGPL states that included in Appendix A attached to the filing are 
    workpapers supporting the calculation of the revised GPS Surcharge of 
    $0.0287 per dt reflected on the tariff sheet included therein.
        TGPL states that copies of the filing are being mailed to its 
    customers, State Commissions and other interested parties.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E. Washington, D.C. 
    20426, in accordance with Secs. 385.214 and 385.211 of the Commission's 
    Rules and Regulations. All such motions or protests should be filed on 
    or before July 13, 1994. Protests will be considered by the Commission 
    in determining the appropriate action to be taken, but will not serve 
    to make protestants parties to the proceeding.
        Any person wishing to become a party must file a motion to 
    intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection in the Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-16781 Filed 7-11-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/12/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-16781
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: July 12, 1994, Docket No. TM94-14-29-000