2021-14718. BOST5 Hydroelectric LLC; Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Proceeding: Application for non-capacity amendment of license.

    b. Project No.: 12758-007.

    c. Date Filed: February 9, 2021, as supplemented on February 22, 2021.

    d. Licensee: BOST5 Hydroelectric LLC.

    e. Name of Project: Red River Lock and Dam No. 5 Hydroelectric Project.

    f. Location: The project is located at the U.S. Army Corps of Engineers' (Corps) Lock and Dam No. 5, on the Red River near the town of Ninock, in Bossier Parish, Louisiana.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Licensee Contact: Douglas A. Spaulding, P.E., Nelson Energy LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426, (952) 544-8133.

    i. FERC Contact: Christopher Chaney, (202) 502-6778, christopher.chaney@ferc.gov.

    j. Deadline for filing comments, interventions, and protests: Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission.

    The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include docket number P-12758-007. Comments emailed to Commission staff are not considered part of the Commission record.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. Description of Request: The licensee proposes certain design changes to the project; however, the authorized installed capacity would remain as licensed. The licensee proposes to: (1) Install five 5.63-megawatt (MW) Kaplan bulb turbine-generator units, instead of one 28.1-MW unit; (2) shift the powerhouse location approximately 300 feet, and change the footprint from 301 feet long by 90 feet wide to 204 feet long by 153 feet wide; (3) shift the location of the Corps' recreation facilities the licensee is required to reconstruct from downstream to upstream of the dam; and (4) reduce the project's total hydraulic capacity from 18,486 cubic feet per second (cfs) to 17,650 cfs.

    l. Locations of the Application: This filing may be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. Agencies may obtain copies of the application directly from the applicant.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Start Signature

    Dated: July 6, 2021.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2021-14718 Filed 7-9-21; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
07/12/2021
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2021-14718
Pages:
36544-36544 (1 pages)
Docket Numbers:
Project No. 12758-007
PDF File:
2021-14718.pdf