2017-14656. Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process: Walden Hydro, LLC
-
Start Preamble
a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process.
b. Project No.: 4428-010.
c. Date Filed: May 31, 2017.
d. Submitted By: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in Orange County, New York. No federal lands are occupied by the project works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Kevin Webb, Enel Green Power North America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810; (978) 935-6039; email—Kevin.Webb@enel.com.
i. FERC Contact: Jody Callihan at (202) 502-8278; or email at jody.callihan@ferc.gov.
j. Walden Hydro, LLC filed its request to use the Traditional Licensing Process on May 31, 2017, and provided public notice of its request on June 6, 2017. In a letter dated July 6, 2017, the Director of the Division of Hydropower Licensing approved Walden Hydro, LLC's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New York State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Walden Hydro, LLC as the Commission's non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act.
m. Walden Hydro, LLC filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site (http://www.ferc.gov), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h.
o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 4428. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 31, 2020.
p. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
Start SignatureDated: July 6, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-14656 Filed 7-12-17; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 07/13/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-14656
- Pages:
- 32357-32357 (1 pages)
- Docket Numbers:
- Project No. 4428-010
- PDF File:
- 2017-14656.pdf