95-17295. In the Matter of: Virginia Electric Power Company (Surry Power Station Unit No. 1); Exemption  

  • [Federal Register Volume 60, Number 135 (Friday, July 14, 1995)]
    [Notices]
    [Pages 36314-36316]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-17295]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-280]
    
    
    In the Matter of: Virginia Electric Power Company (Surry Power 
    Station Unit No. 1); Exemption
    
    I
    
        Virginia Electric and Power Company (the licensee) is the holder of 
    Facility Operating License No. DPR-37, which authorizes operation of 
    Surry Power Station, Unit 1 (the facility), at a steady-state reactor 
    power level not in excess of 2441 megawatts thermal. The facility is a 
    pressurized water reactor located at the licensee's site in Surry 
    County, Virginia. The license provide among other things, that it is 
    subject to all rules, regulations, and Orders of the U.S. Nuclear 
    Regulatory Commission (the Commission or NRC) now or hereafter in 
    effect.
    
    II
    
        Section III.D.1.(a) of Appendix J to 10 CFR Part 50 requires the 
    performance of 
    
    [[Page 36315]]
    three Type A containment integrated leakage rate tests (ILRTs) of the 
    primary containment, at approximately equal intervals during each 10-
    year service period. The third test of each set shall be conducted when 
    the plant is shut down for the 10-year inservice inspection program.
    
    III
    
        By letter dated April 28, 1995, the licensee requested temporary 
    relief from the requirement to perform a set of three Type A tests at 
    approximately equal intervals during each 10-year service period of the 
    primary containment. The requested exemption would permit a one-time 
    interval extension of the third Type A test by approximately 18 months 
    (from the October 1995 refueling outage, to the February 1997 refueling 
    outage) and would permit the third Type A test of the second 10-year 
    inservice inspection period to not correspond with the end of the 
    current American Society of Mechanical Engineers Boiler and Pressure 
    Vessel Code (ASME Code) inservice inspection interval.
        The licensee's request cites the special circumstances of 10 CFR 
    50.12, paragraph (a)(2)(ii), as the basis for the exemption. The 
    licensee points out that the existing Type B and C testing programs are 
    not being modified by this request and will continue to effectively 
    detect containment leakage caused by the degradation of active 
    containment isolation components as well as containment penetrations. 
    It has been the experience at Surry Unit 1 during the Type A tests 
    conducted from 1986 to date, that the Type A tests have not identified 
    any significant sources of leakage in addition to those found by the 
    Type B and C tests.
        During operation, the Surry Unit 1 containment is maintained at a 
    subatmospheric pressure (approximately 10.0 psia) which provides a good 
    indication of the containment integrity. Technical Specifications 
    require the containment to be subatmospheric whenever Reactor Coolant 
    System temperature and pressure exceeds 350  deg.F and 450 psig, 
    respectively. Containment air partial pressure is monitored in the 
    control room to ensure Technical Specification compliance. If the 
    containment air partial pressure increases above the established 
    Technical Specification limit, the unit is required to shut down.
    
    IV
    
        In the licensee's April 28, 1995, exemption request, the licensee 
    stated that special circumstance 50.12(a)(2)(ii) is applicable to this 
    situation, i.e., that application of the regulation is not necessary to 
    achieve the underlying purpose of the rule.
        Appendix J states that the leakage test requirements provide for 
    periodic verification by tests of the leak tight integrity of the 
    primary reactor containment. Appendix J further states that the purpose 
    of the tests ``is to assure that leakage through the primary reactor 
    containment shall not exceed the allowable leakage rate values as 
    specified in the Technical Specifications or associated bases''. Thus, 
    the underlying purpose of the requirement to perform type A containment 
    leak rate tests at intervals during the 10-year service period is to 
    ensure that any potential leakage pathways through the containment 
    boundary are identified within a time span that prevents significant 
    degradation from continuing or becoming unknown.
        The NRC staff has reviewed the basis and supporting information 
    provided by the licensee in the exemption request. The NRC staff has 
    noted that the licensee's record of ensuring a leak-tight containment 
    has improved markedly since 1986. All ``as-found'' Type A tests since 
    1986 have passed and the results of the Type A testing have been 
    confirmatory of the Type B and C tests which will continue to be 
    performed. The licensee will perform the general containment inspection 
    although it is only required by Appendix J (Section V.A.) to be 
    performed in conjunction with Type A tests. The NRC staff considers 
    that these inspections, though limited in scope, provide an important 
    added level of confidence in the continued integrity of the containment 
    boundary.
        The Surry Unit 1 containment is of the subatmospheric design. 
    During operation,the containment is maintained at a subatmospheric 
    pressure (approximately 10 psia) which provides for constant monitoring 
    of the containment integrity and further obviates the need for Type A 
    testing at this time. If the containment air partial pressure exceeds 
    the established Technical Specification limit, the unit must be shut 
    down.
        The NRC staff has also made use of a draft staff report, NUREG-
    1493, which provides the technical justification for the present 
    Appendix J rulemaking effort which also includes a 10-year test 
    interval for Type A tests. The integrated leakage rate test, or Type A 
    test, measures overall containment leakage. However, operating 
    experience with all types of containments used in this country 
    demonstrates that essentially all containment leakage can be detected 
    by local leakage rate tests (Type B and C). According to results given 
    in NUREG-1493, out of 180 ILRT reports covering 110 individual reactors 
    and approximately 770 years of operating history, only 5 ILRT failures 
    were found which local leakage rate testing could not detect. This is 
    3% of all failures. This study agrees well with previous NRC staff 
    studies which show that Type B and C testing can detect a very large 
    percentage of containment leaks.
        The Nuclear Management and Resources Council (NUMARC), now the 
    Nuclear Energy Institute (NEI), collected and provided the NRC staff 
    with summaries of data to assist in the Appendix J rulemaking effort. 
    NUMARC collected results of 144 ILRTs from 33 units; 23 ILRTs exceeded 
    1.0La. Of these, only nine were not due to Type B or C leakage 
    penalties. The NEI data show that in about one-third of the cases 
    exceeding allowable leakage, the as-found leakage was less than 
    2La; in one case the leakage was found to be approximately 
    2La; in one case the as-found leakage was less than 3La; one 
    case approached 10La; and in one case the leakage was found to be 
    approximately 21La. For about half of the failed ILRTs the as-
    found leakage was not quantified. These data show that, for those ILRTs 
    for which the leakage was quantified, the leakage values are small in 
    comparison to the leakage value at which the risk to the public starts 
    to increase over the value of risk corresponding to La 
    (approximately 200La, as discussed in NUREG-1493). Therefore, 
    based on those considerations, it is unlikely that an extension of one 
    cycle for the performance of the Appendix J, Type A test at Surry, Unit 
    1, would result in significant degradation of the overall containment 
    integrity. As a result, the application of the regulation in these 
    particular circumstances is not needed to achieve the underlying 
    purpose of the rule.
        Based on generic and plant specific data, the NRC staff finds the 
    basis for the licensee's proposed exemption to allow a one-time 
    exemption to permit a schedular extension of one cycle for the 
    performance of the Appendix Type A test, provided that the general 
    containment inspection is performed, to be acceptable.
        Pursuant to 10 CFR 51.32, the Commission has determined that 
    granting this Exemption will not have a significant impact on the 
    environment (60 FR 35439).
        This Exemption is effective upon issuance and shall expire at the 
    completion of the 1997 refueling outage.
    
    
    [[Page 36316]]
    
        Dated at Rockville, Maryland, this 7th day of July 1995.
    
        For the Nuclear Regulatory Commission.
    Steven A. Varga,
    Director of Reactor Projects--I/II Office of Nuclear Reactor 
    Regulation.
    [FR Doc. 95-17295 Filed 7-13-95; 8:45 am]
    BILLING CODE 7590-01-M
    
    

Document Information

Published:
07/14/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-17295
Pages:
36314-36316 (3 pages)
Docket Numbers:
Docket No. 50-280
PDF File:
95-17295.pdf