2010-17218. Sunshine Act Meeting Notice  

  • Start Preamble July 8, 2010.

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:

    Agency Holding Meeting:

    Federal Energy Regulatory Commission.

    Date and Time:

    July 15, 2010, 10 a.m.

    Place:

    Room 2C, 888 First Street, NE., Washington, DC 20426.

    Status:

    Open.

    Matters To Be Considered:

    Agenda*.

    Note:

    Items listed on the agenda may be deleted without further notice.

    Contact Person for More Information:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400. For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    961st—Meeting; Regular Meeting; July 15, 2010; 10 a.m.

    Item No.Docket No.Company
    Administrative
    A-1AD02-1-000Agency Administrative Matters.
    A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations
    A-3AD10-15-000Smart Grid Update.
    Electric
    E-1EL10-64-000California Public Utilities Commission.
    EL10-66-000Southern California Edison Company, Pacific Gas and Electric Company and San Diego Gas & Electric Company.
    Start Printed Page 40817
    E-2ER10-1269-000Southwest Power Pool, Inc.
    E-3RD10-13-000North American Electric Reliability Corporation.
    E-4RM08-19-003Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability; Margins, Total Transfer Capability, and Existing Transmission Commitments; Mandatory Reliability Standards for the Bulk Power System.
    RM05-5-019Standards for Business Practices and Communication Protocols for Public Utilities.
    E-5OA08-52-007New York Independent System Operator, Inc. New York Transmission Owners.
    E-6ER10-1268-000South Carolina Electric & Gas Company.
    ER10-516-000
    ER10-855-000
    E-7OMITTED
    E-8EG06-73-000BG Dighton Power, LLC.
    EG98-79-000MASSPOWER.
    EG99-220-000Lake Road Generating Company, LP.
    E-9ER10-1185-000ISO New England Inc.
    E-10ER10-765-000California Independent System Operator Corporation.
    E-11ER10-942-000ISO New England Inc. and New England Power Pool
    E-12ER07-521-009New York Independent System Operator, Inc.
    E-13ER08-1281-004New York Independent System Operator, Inc.
    E-14OMITTED
    E-15EL10-69-000Virginia Electric and Power Company v. PJM Interconnection, L.L.C.
    Gas
    G-1RP09-2-002Portland Natural Gas Transmission System.
    G-2RP01-245-031Transcontinental Gas Pipe Line Corporation.
    G-3RP10-149-000Great Lakes Gas Transmission Limited Partnership.
    Hydro
    H-1P-1888-028York Haven Power Company, LLC.
    H-2UL09-1-002L.S. Starrett Company.
    H-3P-460-033City of Tacoma, Washington.
    P-460-040
    P-460-021
    H-4EL10-53-000FPL Energy Maine Hydro LLC v. Great Lakes Hydro America, LLC and Rumford Falls Hydro LLC.
    H-5P-2355-014Exelon Generation Company, LLC.
    Certificates
    C-1OMITTED
    C-2CP10-73-000TGGT Holdings, LLC.
    C-3CP09-455-000Florida Gas Transmission Company, LLC.
    CP09-456-000Transcontinental Gas Pipe Line Company, LLC. Florida Gas Transmission Company, LLC.
    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free Web cast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2010-17218 Filed 7-12-10; 11:15 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
07/14/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-17218
Pages:
40816-40817 (2 pages)
EOCitation:
of 2010-07-08
PDF File:
2010-17218.pdf