94-17231. Entergy Power Development Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 135 (Friday, July 15, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-17231]
    
    
    [[Page Unknown]]
    
    [Federal Register: July 15, 1994]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    FEDERAL ENERGY REGULATORY COMMISSION
    
    [Docket No. EG94-75-000, et al.]
    
     
    
    Entergy Power Development Corporation, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    July 11, 1994.
    
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Entergy Power Development Corporation
    
    [Docket No. EG94-75-000]
    
        On July 6, 1994, Entergy Power Development Corporation 
    (``Applicant''), 900 S. Shackleford Road, Suite 210, Little Rock, 
    Arkansas, 72211, filed with the Federal Energy Regulatory Commission an 
    application for determination of exempt wholesale generator status 
    pursuant to part 365 of the Commission's regulations.
        Applicant, a Delaware corporation, is wholly-owned by Entergy 
    Corporation, a registered holding company within the meaning of Section 
    2(a)(12) of the Public Utility Holding Company Act of 1935. In Richmond 
    Power Enterprises, L.P., et al., 62 FERC 61,157 (1993), and Entergy 
    Power Development Corp., 67 FERC 61,344 (1994), the Commission 
    determined that Applicant is an exempt wholesale generator. Applicant 
    now intends to indirectly own or operate, or both own and operate, the 
    generating and transmission facilities currently owned by Empresa de 
    Generacion Electrica de Lima, S.A., a nationally owned Peruvian 
    corporation. These facilities consist of five hydroelectric generating 
    facilities and one thermal generating facility having a combined total 
    installed capacity of 692.6 MW and approximately 576 Km of transmission 
    lines, which operate as radial lines to interconnect and deliver energy 
    from the generating units to the national grid in Peru.
        Comment date: July 28, 1994, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application. 
    2. Entergy EDEGEL II, Inc. 
    [Docket No. EG94-76-000] 
        On July 6, 1994, Entergy EDEGEL II, Inc. (``Applicant''), 900 S. 
    Shackleford Road, Suite 210, Little Rock, Arkansas, 72211, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to part 365 
    of the Commission's regulations.
        Applicant, a Delaware corporation, is wholly-owned by Entergy Power 
    Development Corporation, a registered holding company within the 
    meaning of Section 2(a)(12) of the Public Utility Holding Company Act 
    of 1935. Applicant intends to indirectly own or operate, or both own 
    and operate, the generating and transmission facilities currently owned 
    by Empresa de Generacion Electrica de Lima, S.A., a nationally owned 
    Peruvian corporation. These facilities consist of five hydroelectric 
    generating facilities and one thermal generating facility having a 
    combined total installed capacity of 692.6 MW and approximately 576 Km 
    of transmission lines, which operate as radial lines to interconnect 
    and deliver energy from the generating units to the national grid in 
    Peru.
        Comment date: July 28, 1994, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application. 
    3. Entergy EDEGEL I, Inc.
    [Docket No. EG94-77-000] 
        On July 6, 1994, Entergy EDEGEL I, Inc. (``Applicant''), 900 S. 
    Shackleford Road, Suite 210, Little Rock, Arkansas, 72211, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to part 365 
    of the Commission's regulations.
        Applicant, a Delaware corporation, is wholly-owned by Entergy Power 
    Development Corporation, which in turn is wholly-owned by Entergy 
    Corporation, a registered holding company within the meaning of Section 
    2(a)(12) of the Public Utility Holding Company Act of 1935. Applicant 
    intends to indirectly own or operate, or both own and operate, the 
    generating and transmission facilities currently owned by Empresa de 
    Generacion Electrica de Lima, S.A., a nationally owned Peruvian 
    corporation. These facilities consist of five hydroelectric generating 
    facilities and one thermal generating facility having a combined total 
    installed capacity of 692.6 MW and approximately 576 Km of transmission 
    lines, which operate as radial lines to interconnect and deliver energy 
    from the generating units to the national grid in Peru.
    
        Comment date: July 28, 1994, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. EP EDEGEL, Inc.
    
    [Docket No. EG94-78-000]
    
        On July 6, 1994, EP EDEGEL, Inc. (``Applicant''), 900 S. 
    Shackleford Road, Suite 210, Little Rock, Arkansas, 72211, filed with 
    the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to part 365 
    of the Commission's regulations.
    
        Applicant, a Delaware corporation, is owned approximately 72 
    percent by Entergy Edegel I, Inc. and Entergy Edegel II, Inc., 
    collectively, and approximately 28 percent by PSI Argentina, Inc. 
    Entergy Edegel I, Inc. and Entergy Edegel II, Inc. are both wholly-
    owned by Entergy Power Development Corporation, which in turn is 
    wholly-owned by Entergy Corporation, a registered holding company   
    within   the   meaning   of Section   2(a)(12)   of   the   Public   
    Utility Holding   Company   Act   of   1935 (``PUHCA''). PSI Argentina, 
    Inc. is owned by PSI Resources, Inc., an exempt public utility holding 
    company under Section 3(a)(1) of PUHCA. Applicant intends to indirectly 
    own or operate, or both own and operate, the generating and 
    transmission facilities currently owned by Empresa de Generacion 
    Electrica de Lima, S.A., a nationally owned Peruvian corporation. These 
    facilities consist of five hydroelectric generating facilities and one 
    thermal generating facility having a combined total installed capacity 
    of 692.6 MW and approximately 576 Km of transmission lines, which 
    operate as radial lines to interconnect and deliver energy from the 
    generating units to the national grid in Peru.
        Comment date: July 28, 1994, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    5. Wartsila Diesel Development Corp., Inc.
    
    [Docket No. EG94-79-000]
    
        On July 6, 1994 Wartsila Diesel Development Corp., Inc. (DDC) (c/o 
    Lee M. Goodwin, Reid & Priest, 701 Pennsylvania Avenue, NW., 
    Washington, DC 20004) filed with the Federal Energy Regulatory 
    Commission an application for exempt wholesale generator status 
    pursuant to part 365 of the Commission's Regulations.
        DDC is a Delaware corporation formed to develop, own, and/or 
    operate eligible facilities. DDC will operate two diesel electric 
    generating facilities in the Dominican Republic and one diesel electric 
    generating facility in Guyana. DDC states that it also may engage in 
    project development activities associated with its development or 
    acquisition of operating or ownership interests in additional as-yet 
    unidentified eligible facilities and/or exempt wholesale generators 
    that meet the criteria in Section 32 of the Public Utility Holding 
    Company Act.
        Comment date: August 1, 1994, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    6. Intercoast Power Marketing Company
    
    [Docket No. ER94-6-000]
    
        Take notice that on June 22, 1994, Intercoast Power Marketing 
    Company tendered for filing additional information to its October 5, 
    1993 filing in the above-referenced docket.
        Comment date: July 21, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Public Service Company of New Mexico
    
    [Docket No. ER94-938-000]
    
        Take notice that on May 27, 1994, Public Service Company of New 
    Mexico tendered for filing an amendment in the above-referenced docket.
        Comment date: July 20, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Kansas City Power & Light Company
    
    [Docket No. ER94-1107-000]
    
        Take notice that on June 20, 1994, Kansas City Power & Light 
    Company tendered for filing an amendment to its March 31, 1994 filing 
    in the above-referenced docket.
        Comment date: July 20, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Entergy Services, Inc.
    
    [Docket No. ER94-1127-001]
    
        Take notice that on May 30, 1994, Entergy Services, Inc. (Entergy 
    Services), as agent for Mississippi Power & Light Company (MP&L), 
    tendered for filing a revised Service Schedule LF to the 
    Interconnection Agreement between South Mississippi Electric Power 
    Association (SMEPA) and MP&L, dated July 18, 1979, as amended. Entergy 
    Services requests waiver of the notice requirements of the Federal 
    Power Act and the Commission's regulations to permit the service to 
    become effective as of June 1, 1994. To the extent necessary, Energy 
    Services also requests waiver of the requirements of Sec. 35.13 of the 
    Commission's regulations.
        Comment date: July 25, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. East Texas Electric Cooperative, Inc.
    
    [Docket No. ES94-30-000]
    
        Take notice that on June 27, 1994, East Texas Electric Cooperative, 
    Inc. filed an application under Sec. 204 of the Federal Power Act 
    seeking authorization to assume liability for a long-term secured loan 
    in the amount of not more than $34,415,231 from the National Rural 
    Utilities Cooperative Finance Corporation.
        Comment date: July 26, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Chambers Cogeneration Limited Partnership
    
    [Docket Nos. QF87-433-002 and EL94-29-000]
    
        On July 8, 1994, Chambers Cogeneration Limited Partnership tendered 
    for filing additional information in support of its request for waiver 
    of the technical standards relating to its cogeneration facility.
        Comment date: July 29, 1994, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-17231 Filed 7-14-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
07/15/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-17231
Dates:
July 28, 1994, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. 2. Entergy EDEGEL II, Inc. [Docket No. EG94-76-000]
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: July 15, 1994, Docket No. EG94-75-000, et al.