96-17840. Tennessee Gas Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 136 (Monday, July 15, 1996)]
    [Notices]
    [Pages 36868-36869]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-17840]
    
    
    -----------------------------------------------------------------------
    
    [[Page 36869]]
    
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-607-000]
    
    
    Tennessee Gas Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    July 9, 1996.
        Take notice that on July 1, 1996, Tennessee Gas Pipeline Company 
    (Tennessee), a Delaware corporation, Post Office Box 2511, Houston, 
    Texas 77252, filed a request with the Commission in Docket No. CP96-
    607-000, pursuant to Sections 157.205, and 157.212(a) of the 
    Commission's Regulations under the Natural Gas Act (NGA) for 
    authorization to install a new delivery point located on Tennessee's 
    system in Montgomery County, Texas, for Hughes Natural Gas, Inc. 
    (Hughes) authorized in blanket certificate issued in Docket No. CP82-
    413-000, all as more fully set forth in the request on file with the 
    Commission and open to public inspection.
        Tennessee proposes to install, own, operate and maintain a 2-inch 
    hot tap on its existing right-of-way and inspect Hughes' installation 
    of the interconnect piping, meter facilities, regulation and strainer 
    facilities. Tennessee reports that they would operate the interconnect 
    piping, regulation and strainer facilities and would own and maintain 
    the meter facilities which would be located on a site, provided by 
    Hughes, adjacent to and along Tennessee's existing right-of-way. The 
    estimated cost of the new facilities would be $15,400 which would be 
    reimbursed by Hughes.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-17840 Filed 7-12-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/15/1996