[Federal Register Volume 62, Number 135 (Tuesday, July 15, 1997)]
[Notices]
[Pages 37900-37901]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-18485]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-618-000]
National Fuel Gas Supply Corporation; Notice of Application
July 9, 1997.
Take notice that on July 2, 1997, National Fuel Gas Supply
Corporation (National Fuel) 10 Lafayette Square, Buffalo, New York
14203, filed in Docket No. CP97-618-000 an application pursuant to
Section 7(b) of the Natural Gas Act for permission and approval to
abandon by sale to Puma Resources Holdings, Inc. (Puma), Line D-69
along with appurtenances, in Erie, Pennsylvania, and for the Commission
to determine that Line D-69 will be exempt from the jurisdiction
following the sale to Puma, all as more fully set forth in the
application on file with the Commission and open to public inspection.
Specifically, National Fuel proposes to abandon Line D-69 which is
12,805 feet in length and 4 inches in diameter, its appurtenances, to
Puma for $1,000. National Fuel states that the line and facilities will
be used for gathering purposes and requests that the Commission
determine that such facilities will not be subject to the Commission's
jurisdiction after the sale.
Any person desiring to be heard or to make any protest with
reference to said application should on or before July 30, 1997, file
with the Federal Energy Regulatory Commission, Washington, DC 20426, a
motion to intervene or a protest in accordance with the requirements of
the Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).
All protests filed with the Commission will be considered by it in
determining the appropriate action to be taken but will not serve to
make the
[[Page 37901]]
protestants parties to the proceeding. Any person wishing to become a
party to a proceeding or to participate as a party in any hearing
therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Williston Basin to appear or be represented
at the hearing.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-18485 Filed 7-14-97; 8:45 am]
BILLING CODE 6717-01-M