NUCLEAR REGULATORY COMMISSION
[Docket No. 50-298]
Nebraska Public Power District; Notice of Consideration of
Issuance of Amendment to Facility Operating License, Proposed No
Significant Hazards Consideration Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
DPR-46, issued to Nebraska Public Power District (the licensee), for
operation of the Cooper Nuclear Station (CNS) located in Nemaha County,
Nebraska.
The proposed amendment in the licensee's application of March 27,
1997, would increase the minimum volume of diesel fuel oil in the fuel
oil storage tanks from 48,000 gallons to 49,500 gallons. This change is
Document of Change (DOC) 3.8.3-M.2 of the conversion of the current
Technical Specifications (CTS) for the CNS to the improved Technical
Specifications (ITS) that was noticed in the Federal Register on March
17, 1998 (63 FR 13074). DOC 3.8.3-M.2 is the second more restrictive
change to ITS Section 3.8.3 for the CNS.
This proposed change would have a value different from the CTS and
the Improved Standard Technical Specifications (ISTS) provided in
NUREG-1433, ``Standard Technical Specifications, General Electric
Plants, BWR/4,'' Revision 1, dated April 1995. The conversion is based
on NUREG-1433 and the Commission's ``Final Policy Statement on
Technical Specifications Improvements for Nuclear Power Reactors,''
published on July 22, 1993 (58 FR 39132).
The exigent circumstances for this notice is that the staff has
recently determined that this change in the minimum volume of diesel
fuel oil in the fuel oil storage tanks is beyond the scope of the
conversion to the ITS; however, the change should be made to the ITS
because the proposed value more properly accounts for the fuel oil
needed for the diesel generators during all design basis accidents. The
staff expects to issue the ITS for the CNS by July 29, 1998. To allow
the staff to include the higher value for the minimum volume of fuel
oil in the ITS, it is necessary for the staff to issue of this notice
of proposed change to the CTS before July 15, 1998, to meet the
requirements in 10 CFR 50.91 on notices for public comment of license
amendments.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act) and the Commission's regulations.
Pursuant to 10 CFR 50.91(a)(6) for amendments to be granted under
exigent circumstances, the NRC staff must determine that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in 10 CFR 50.92, this means that operation of
the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
In accordance with the criteria set forth in 10 CFR. 50.92, the
Nebraska Public Power District has evaluated this proposed Technical
Specifications change and determined it does not represent a
significant hazards consideration. The following is provided in support
of this conclusion.
1. Does the change involve a significant increase in the
probability or consequences of an accident previously evaluated?
The proposed change provides more stringent requirements for
operation of the facility. These more stringent requirements do not
result in operation that will increase the probability of initiating an
analyzed event and do not alter assumptions relative to the mitigation
of an accident or transient event. The more restrictive requirements
continue to ensure process variables, structures, systems, and
components are maintained consistent with safety analyses and [CNS]
licensing basis. [The storage of fuel oil is not an initiator of a
design basis accident for the CNS and the licensee has an approved fire
protection program.] Therefore, this change does not involve a
significant increase in the probability or consequences of an accident
previously evaluated.
2. Does the change create the possibility of a new or different
kind of accident from any accident previously evaluated?
The proposed change does not involve a physical alteration of the
plant (no new or different type of equipment will be installed) or
changes in the methods governing normal plant operation. The proposed
change does impose different requirements. However, this change is
consistent with the assumptions in the safety analyses and [CNS]
licensing basis. [The licensee has an approved fire protection program
for the hazard of having to store more fuel oil.] Thus, this change
does not create the possibility of a new or different kind of accident
from any accident previously evaluated.
3. Does this change involve a significant reduction in a margin of
safety?
The imposition of more restrictive requirements either has no
impact on or increases the margin of plant safety. As provided in the
discussion of the change, each change in this category [(more
restrictive)] is by definition, providing additional restrictions to
enhance plant safety. The change maintains requirements within the
safety analyses and [CNS] licensing basis. [The additional amount of
diesel fuel oil required will provide additional assurance that there
is sufficient fuel oil to run the diesel generators through an event.]
Therefore, this change does not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 14 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 14-day notice period. However, should circumstances
change during the notice period, such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 14-day notice period, provided that its final determination is that
the amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and
Directives Branch, Division of Administrative Services, Office of
[[Page 38195]]
Administration, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and should cite the publication date and page number of
this Federal Register notice. Written comments may also be delivered to
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville,
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of
written comments received may be examined at the NRC Public Document
Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
The filing of requests for hearing and petitions for leave to
intervene is discussed below. By August 14, 1998, the licensee may file
a request for a hearing with respect to issuance of the amendment to
the subject facility operating license and any person whose interest
may be affected by this proceeding and who wishes to participate as a
party in the proceeding must file a written request for a hearing and a
petition for leave to intervene. Requests for a hearing and a petition
for leave to intervene shall be filed in accordance with the
Commission's ``Rules of Practice for Domestic Licensing Proceedings''
in 10 CFR Part 2. Interested persons should consult a current copy of
10 CFR 2.714 which is available at the Commission's Public Document
Room, the Gelman Building, 2120 L Street, NW., Washington, DC, and at
the local public document room located at the Auburn Memorial Library,
1810 Courthouse Avenue, Auburn, NE 68305. If a request for a hearing or
petition for leave to intervene is filed by the above date, the
Commission or an Atomic Safety and Licensing Board, designated by the
Commission or by the Chairman of the Atomic Safety and Licensing Board
Panel, will rule on the request and/or petition; and the Secretary or
the designated Atomic Safety and Licensing Board will issue a notice of
hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following factors: (1) the nature of the petitioner's right under the
Act to be made a party to the proceeding; (2) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (3) the possible effect of any order which may be
entered in the proceeding on the petitioner's interest. The petition
should also identify the specific aspect(s) of the subject matter of
the proceeding as to which petitioner wishes to intervene. Any person
who has filed a petition for leave to intervene or who has been
admitted as a party may amend the petition without requesting leave of
the Board up to 15 days prior to the first prehearing conference
scheduled in the proceeding, but such an amended petition must satisfy
the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference
scheduled in the proceeding, a petitioner shall file a supplement to
the petition to intervene which must include a list of the contentions
which are sought to be litigated in the matter. Each contention must
consist of a specific statement of the issue of law or fact to be
raised or controverted. In addition, the petitioner shall provide a
brief explanation of the bases of the contention and a concise
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to those specific sources and documents of which the petitioner is
aware and on which the petitioner intends to rely to establish those
facts or expert opinion. Petitioner must provide sufficient information
to show that a genuine dispute exists with the applicant on a material
issue of law or fact. Contentions shall be limited to matters within
the scope of the amendment under consideration. The contention must be
one which, if proven, would entitle the petitioner to relief. A
petitioner who fails to file such a supplement which satisfies these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing, including the opportunity to present evidence and cross-
examine witnesses.
If the amendment is issued before the expiration of the 30-day
hearing period, the Commission will make a final determination on the
issue of no significant hazards consideration. If a hearing is
requested, the final determination will serve to decide when the
hearing is held.
If the final determination is that the amendment request involves
no significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment.
If the final determination is that the amendment request involves a
significant hazards consideration, any hearing held would take place
before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, or may be delivered to the Commission's Public
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC,
by the above date. A copy of the petition should also be sent to the
Office of the General Counsel, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and to Mr. John R. McPhail, Nebraska Public
Power District, Post Office Box 499, Columbus, NE 68602-0499, attorney
for the licensee.
Nontimely filings of petitions for leave to intervene, amended
petitions, supplemental petitions and/or requests for hearing will not
be entertained absent a determination by the Commission, the presiding
officer or the presiding Atomic Safety and Licensing Board that the
petition and/or request should be granted based upon a balancing of the
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the
application for amendment dated March 27, 1997, which is available for
public inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room, located at the Auburn Memorial Library, 1810 Courthouse
Avenue, Auburn, NE 68305.
Dated at Rockville, Maryland, this 9th day of July 1998.
For the Nuclear Regulatory Commission.
Jack N. Donohew,
Senior Project Manager, Project Directorate IV-1, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.