98-18835. Virginia Electric and Power Company, Surry Nuclear Power Station, Units 1 and 2; Confirmatory Order Modifying License Effective Immediately  

  • [Federal Register Volume 63, Number 135 (Wednesday, July 15, 1998)]
    [Notices]
    [Page 38196]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-18835]
    
    
    
    [[Page 38196]]
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Nos. 50-280 and 50-281]
    
    
    Virginia Electric and Power Company, Surry Nuclear Power Station, 
    Units 1 and 2; Confirmatory Order Modifying License Effective 
    Immediately
    
    I
    
        Virginia Electric and Power Company (VEPCO, the Licensee) is the 
    holder of Facility Operating License No. DPR-32, which authorizes 
    operation of Surry Nuclear Power Station (SNPS), Unit 1, and Facility 
    Operating License No. DPR-37, which authorizes operation of SNPS, Unit 
    2, located in Surry County, Viginia.
    
    II
    
        The staff of the U.S. Nuclear Regulatory Commission (NRC) has been 
    concerned that Thermo-Lag 330-1 fire barrier systems installed by 
    licensees may not provide the level of fire endurance intended and that 
    licensees that use Thermo-Lag 330-1 fire barriers may not be meeting 
    regulatory requirements. During the 1992 to 1994 timeframe, the NRC 
    staff issued Generic Letter (GL) 92-08, ``Thermo-Lag 330-1 Fire 
    Barriers'' and subsequent requests for additional information that 
    requested licensees to submit plans and schedules for resolving the 
    Thermo-Lag issue. The NRC staff has obtained and reviewed all 
    licensees' corrective plans and schedules. The staff is concerned that 
    some licensees may not be making adequate progress toward resolving the 
    plant-specific issues, and that some implementation schedules may be 
    either too tenuous or too protracted. For example, several licensees 
    informed the NRC staff that their completion dates had slipped by 6 
    months to as much as 3 years. For SNPS, Units 1 and 2, which had 
    corrective action scheduled beyond 1997, the NRC reviewed with VEPCO 
    the schedule of Thermo-Lag corrective actions described in the VEPCO 
    submittal to the NRC dated December 18, 1997. Based on the information 
    submitted by VEPCO, the NRC staff has concluded that the schedules 
    presented are reasonable. This conclusion is based on the need to 
    perform certain plant modifications during outages as opposed to those 
    that can be performed while the plant is at power. In order to remove 
    compensatory measures such as fire watches, it has been determined that 
    resolution of the Thermo-Lag corrective actions by VEPCO must be 
    completed in accordance with current VEPCO schedules. By letter dated 
    May 14, 1998, the NRC staff notified VEPCO of its plan to incorporate 
    VEPCO's schedule commitment into a requirement by issuance of an Order 
    and requested consent from the Licensee. By letter dated May 22, 1998, 
    VEPCO provided its consent to issuance of a Confirmatory Order.
    
    III
    
        The Licensee's commitment as set forth in its letter of December 
    18, 1997, is acceptable and is necessary for the NRC to conclude that 
    public health and safety are reasonably assured. To preclude any 
    schedule slippage and to assure public health and safety, the NRC staff 
    has determined that the Licensee's commitment in its December 18, 1997, 
    letter be confirmed by this Order. The Licensee has agreed to this 
    action. Based on the above, and the Licensee's consent, this Order is 
    immediately effective upon issuance.
    
    IV
    
        Accordingly, pursuant to sections 103, 161b, 161i, 161o, 182, and 
    186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
    regulations in 10 CFR 2.202 and 10 CFR Part 50, It is hereby ordered, 
    effective immediately, that:
    
        Virginia Electric and Power Company shall complete final 
    implementation of Thermo-Lag 330-1 radiant energy shields corrective 
    actions at Surry Units 1 and 2, described in the VEPCO submittal to 
    the NRC dated December 18, 1997, by the completion of the next 
    refueling outage scheduled to begin in October 1998 for Unit 1, and 
    scheduled to begin in April 1999 for Unit 2.
    
        The Director, Office of Nuclear Reactor Regulation, may relax or 
    rescind, in writing, any provisions of this Confirmatory Order upon a 
    showing by the Licensee of good cause.
    
    V
    
        Any person adversely affected by this Confirmatory Order, other 
    than the Licensee, may request a hearing within 20 days of its 
    issuance. Where good cause is shown, consideration will be given to 
    extending the time to request a hearing. A request for extension of 
    time must be made in writing to the Director, Office of Nuclear Reactor 
    Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555, 
    and include a statement of good cause for the extension. Any request 
    for a hearing shall be submitted to the Secretary, U.S. Nuclear 
    Regulatory Commission, Attention: Chief, Rulemakings and Adjudications 
    Staff, Washington, DC 20555. Copies of the hearing request shall also 
    be sent to the Director, Office of Nuclear Reactor Regulation, U.S. 
    Nuclear Regulatory Commission, Washington, DC 20555, to the Deputy 
    Assistant General Counsel for Enforcement at the same address, to the 
    Regional Administrator, NRC Region II, Atlanta Federal Center, 61 
    Forsyth Street, SW., Suite 23T85, Atlanta, Georgia 30303, and to the 
    Licensee. If such a person requests a hearing, that person shall set 
    forth with particularity the manner in which his/her interest is 
    adversely affected by this Order and shall address criteria set forth 
    in 10 CFR 2.714(d).
        If a hearing is requested by a person whose interest is adversely 
    affected, the Commission will issue an Order designating the time and 
    place of any such hearing. If a hearing is held, the issue to be 
    considered at such hearing shall be whether this Confirmatory Order 
    should be sustained.
        In the absence of any request for hearing, or written approval of 
    an extension of time in which to request a hearing, the provisions 
    specified in Section IV above shall be final 20 days from the date of 
    this Order without further order or proceedings. If an extension of 
    time for requesting a hearing has been approved, the provisions 
    specified in Section IV shall be final when the extension expires if a 
    hearing request has not been received. An answer or a request for 
    hearing shall not stay the immediate effectiveness of this Order.
    
        Dated at Rockville, Maryland this 9th day of July 1998.
    
        For the Nuclear Regulatory Commission.
    Samuel J. Collins,
    Director, Office of Nuclear Reactor Regulation.
    [FR Doc. 98-18835 Filed 7-14-98; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
07/15/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
98-18835
Pages:
38196-38196 (1 pages)
Docket Numbers:
Docket Nos. 50-280 and 50-281
PDF File:
98-18835.pdf