98-18919. ANR Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed Wisconsin Loop Expansion Project  

  • [Federal Register Volume 63, Number 136 (Thursday, July 16, 1998)]
    [Notices]
    [Page 38398]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-18919]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-765-000]
    
    
    ANR Pipeline Company; Notice of Availability of the Environmental 
    Assessment for the Proposed Wisconsin Loop Expansion Project
    
    July 10, 1998.
        The staff of the Federal Energy Regulatory Commission (FERC or 
    Commission) has prepared an environmental assessment (EA) on the 
    natural gas pipeline facilities proposed by ANR Pipeline Company (ANR) 
    in the above-referenced docket.
        The EA was prepared to satisfy the requirements of the National 
    Environmental Policy Act. The staff concludes that approval of the 
    proposed project, with appropriate mitigating measures, would not 
    constitute a major Federal action significantly affecting the quality 
    of the human environment.
        The EA assesses the potential environmental effects of the 
    construction and operation of the proposed Wisconsin Loop Expansion 
    Project facilities including:
         About 11.7 miles of 30-inch-diameter pipeline loop on 
    ANR's existing Wisconsin mainline in Waukesha County, Wisconsin;
         The relocation of an existing pig receiver from ANR's 
    existing Milwaukee Tap and Meter Station No. 10 to a parcel of land 
    adjacent to ANR's existing mainline Station No. 12 in Waukesha County, 
    Wisconsin;
         A valve station at milepost 7.7 along the proposed 30-
    inch-diameter pipeline loop; and
         A new meter station (Somers Meter Station) at milepost 
    12.19 along ANR's existing Racine lateral in Kenosha County, Wisconsin.
        ANR would transport an additional 116 million cubic feet of natural 
    gas per day to shippers in the Chicago hub markets.
        The EA has been placed in the public files of the FERC. A limited 
    number of copies of the EA are available for distribution and public 
    inspection at: Federal Energy Regulatory Commission, Public Reference 
    and Files Maintenance Branch, 888 First Street, N.E., Room 2A, 
    Washington, DC 20426, (202) 208-1371.
        Copies of the EA have been mailed to Federal, state and local 
    agencies, public interest groups, interested individuals, newspapers, 
    and parties to this proceeding.
        Any person wishing to comment on the EA may do so. To ensure 
    consideration prior to a Commission decision on the proposal, it is 
    important that we receive your comments before the date specified 
    below. Please carefully follow these instructions to ensure that your 
    comments are received in time and properly recorded:
         Send two copies of your comments to: Secretary, Federal 
    Energy Regulatory Commission, 888 First St., N.E., Room 1A, Washington, 
    DC 20426;
         Label one copy of the comments for the attention of the 
    Environmental Review and Compliance Branch, PR-11.1.
         Reference Docket No. CP97-765-000; and
         Mail your comments so that they will be received in 
    Washington, DC on or before August 7, 1998.
        Comments will be considered by the Commission but will not serve to 
    make the commentor a party to the proceeding. Any person seeking to 
    become a party to the proceeding must file a motion to intervene 
    pursuant to Rule 214 of the Commission's Rules of Practice and 
    Procedures (18 CFR 385.214).
        The date for filing timely motions to intervene in this proceeding 
    has passed. Therefore, parties now seeking to file late interventions 
    must show good cause, as required by Section 385.214(b)(3), why this 
    time limitation should be waived. Environmental issues have been viewed 
    as good cause for late intervention. You do not need intervenor status 
    to have your comments considered.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-18919 Filed 7-15-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/16/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-18919
Pages:
38398-38398 (1 pages)
Docket Numbers:
Docket No. CP97-765-000
PDF File:
98-18919.pdf