2010-17321. Withdrawal of the Environmental Impact Statement (EIS) Development Process for the Proposed Beluga to Fairbanks (B2F) Natural Gas Transportation Pipeline  

  • Start Preamble

    AGENCY:

    U.S. Army Corps of Engineers, DoD.

    ACTION:

    Notice of withdrawal.

    Start Printed Page 41453

    SUMMARY:

    On January 22, 2009, the Alaska District, U.S. Army Corps of Engineers (Corps) published a notice of intent to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with the construction of the proposed Beluga to Fairbanks (B2F) Alaska natural gas transportation pipeline. On June 24, 2010, the Corps received a request from the Alaska Natural Gas Development Authority discontinuing the EIS development process associated with the proposed B2F pipeline.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Questions can be answered by: Ms. Serena Sweet, Regulatory Division, telephone: (907) 753-2819, toll free in AK: (800) 478-2712, Fax: (907) 753-5567, e-mail: serena.e.sweet@usace.army.mil, mail: U.S. Army Corps of Engineers, CEPOA-RD, Post Office Box 6898, Elmendorf AFB, Alaska 99506-0898. Additional information may be obtained at http://www.angdab2feis.com.

    Start Signature

    Dated: July 2, 2010.

    Serena E. Sweet,

    Project Manager, Alaska District, U.S. Army Corps of Engineers.

    End Signature End Further Info End Preamble

    [FR Doc. 2010-17321 Filed 7-15-10; 8:45 am]

    BILLING CODE 3720-58-P

Document Information

Comments Received:
0 Comments
Published:
07/16/2010
Department:
Engineers Corps
Entry Type:
Notice
Action:
Notice of withdrawal.
Document Number:
2010-17321
Pages:
41452-41453 (2 pages)
PDF File:
2010-17321.pdf