2010-17321. Withdrawal of the Environmental Impact Statement (EIS) Development Process for the Proposed Beluga to Fairbanks (B2F) Natural Gas Transportation Pipeline
-
Start Preamble
AGENCY:
U.S. Army Corps of Engineers, DoD.
ACTION:
Notice of withdrawal.
Start Printed Page 41453SUMMARY:
On January 22, 2009, the Alaska District, U.S. Army Corps of Engineers (Corps) published a notice of intent to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with the construction of the proposed Beluga to Fairbanks (B2F) Alaska natural gas transportation pipeline. On June 24, 2010, the Corps received a request from the Alaska Natural Gas Development Authority discontinuing the EIS development process associated with the proposed B2F pipeline.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Questions can be answered by: Ms. Serena Sweet, Regulatory Division, telephone: (907) 753-2819, toll free in AK: (800) 478-2712, Fax: (907) 753-5567, e-mail: serena.e.sweet@usace.army.mil, mail: U.S. Army Corps of Engineers, CEPOA-RD, Post Office Box 6898, Elmendorf AFB, Alaska 99506-0898. Additional information may be obtained at http://www.angdab2feis.com.
Start SignatureDated: July 2, 2010.
Serena E. Sweet,
Project Manager, Alaska District, U.S. Army Corps of Engineers.
[FR Doc. 2010-17321 Filed 7-15-10; 8:45 am]
BILLING CODE 3720-58-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 07/16/2010
- Department:
- Engineers Corps
- Entry Type:
- Notice
- Action:
- Notice of withdrawal.
- Document Number:
- 2010-17321
- Pages:
- 41452-41453 (2 pages)
- PDF File:
- 2010-17321.pdf