2012-17252. Jacob Focht; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene  

  • Start Preamble

    Take notice that the following application has been filed with the Commission and is available for public inspection:

    a. Application Type: Declaration of Intention.

    b. Docket No: DI12-9-000.

    c. Date Filed: June 27, 2012.

    d. Applicant: Jacob Focht.

    e. Name of Project: Jacobs Creek Hydroelectric Project.

    f. Location: The proposed Jacobs Creek Hydroelectric Project will be located near the city of Valdez, Unorganized Borough, Alaska, affecting T. 9 S., R. 4 W., sec. 30, Copper River Meridian.

    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).

    h. Applicant Contact: Troy Hardwick, H & K Energy Solutions LLC, P.O. Box 90961, Anchorage, AK 99509; telephone: (907) 301-1641; email: www.troy@handkenergy.com. Start Printed Page 41778

    i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502-8768, or Email address: henry.ecton@ferc.gov.

    j. Deadline for filing comments, protests, and/or motions: August 13, 2012.

    Comments, Motions to Intervene, and Protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the instructions on the Commission's Web site under the “eFiling” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission's Web site located at http://www.ferc.gov/​filing-comments.asp.

    Please include the docket number (DI12-9-000) on any comments, protests, and/or motions filed.

    k. Description of Project: The proposed Jacobs Creek Hydroelectric Project will be located on Jacobs Creek, tributary to Lowe River, near Valdez, AK. The proposed project will consist of: (1) A small reservoir created by an existing large log that traverses Jacobs Creek; (2) a 6-inch-diameter, 600-foot-long penstock; (3) a powerhouse that will contain a 24-kW Turgo Runner on a 3-phase generator; (4) a 422-foot-long tailrace returning water to Jacobs Creek; (5) a 166-foot-long underground transmission line transmitting power to the Copper River Electric Association, Inc.; and (6) appurtenant facilities.

    When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre-1935 design or operation.

    l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the Docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene— Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents— All filings must bear in all capital letters the title “COMMENTS”, “PROTESTS”, and/or “MOTIONS TO INTERVENE”, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application.

    p. Agency Comments— Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Dated: July 10, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-17252 Filed 7-13-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
07/16/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-17252
Pages:
41777-41778 (2 pages)
Docket Numbers:
Docket No. DI12-9-000
PDF File:
2012-17252.pdf