DEPARTMENT OF ENERGY
[Docket No. CP95-601-000]
Mississippi River Transmission Corp.; Request Under Blanket
Authorization
July 11, 1995.
Take notice that on July 5, 1995, Mississippi River Transmission
Corporation (MRT), 9900 Clayton Road, St. Louis, Missouri 63124, filed
a prior notice request with the Commission in Docket No. CP95-601-000
pursuant to Section 147.205 of the Commission's Regulations under the
Natural Gas Act (NGA) for authorization to construct and operate a
delivery point in Ste. Genevieve County, Missouri, to provide service
for Laclede Gas Company (Laclede) under MRT's blanket certificates
issued in Docket Nos. CP82-489-000 and CP89-1121-000 pursuant to
Section 7 of the NGA, all as more fully set forth in the request which
is open to the public for inspection.
MRT proposes to construct and operate a 4-inch tap and appurtenant
facilities as a delivery point to serve Laclede, who would provide
natural gas service to Chemical Lime Company's lime kiln facilities.
MRT states that it would deliver up to 6,000 MMBtu equivalent of
natural gas to Laclede at the proposed delivery point on a peak day and
50,000 MMBtu on an annual basis. MRT states that Laclede would
reimburse MRT for the estimated $161,700 construction cost of the
proposed delivery point. MRT also states that its existing FERC tariff
does not prohibit additional delivery points, nor would the natural gas
volumes it proposes to deliver to Laclede via the
[[Page 36413]]
proposed tap exceed currently certified transportation quantities.
Any person or the Commission's staff may, within 45 days after the
Commission has issued this notice, file pursuant to Rule 214 of the
Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or
notice of intervention and pursuant to Sec. 157.205 of the Regulations
under the NGA (18 CFR 157.205) a protest to the request. If no protest
is filed within the allowed time, the proposed activity shall be deemed
to be authorized effective the day after the time allowed for filing a
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to Section 7 of
the NGA.
Lois D. Cashell,
Secretary.
[FR Doc. 95-17388 Filed 7-14-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/17/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-17388
- Pages:
- 36412-36413 (2 pages)
- Docket Numbers:
- Docket No. CP95-601-000
- PDF File:
-
95-17388.pdf