95-17448. Exemption  

  • [Federal Register Volume 60, Number 136 (Monday, July 17, 1995)]
    [Notices]
    [Pages 36446-36447]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-17448]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket No. 50-458]
    
    
    Exemption
    
        In the matter of Entergy Operations, Inc. (River Bend Station, 
    Unit 1).
    
    I
    
        Entergy Operations, Inc., (the licensee) is the holder of Facility 
    Operating License No. NPF-47, which authorizes operation of the River 
    Bend Station, Unit 1. The operating license provides, among other 
    things, that the licensee is subject to all rules, regulations, and 
    orders of the Commission now and hereafter in effect.
        The facility consists of a boiling water reactor at the licensee's 
    site in West Feliciana Parish, Louisiana.
    
    II
    
        Title 10 CFR 73.55, ``Requirements for physical protection of 
    licensed activities in nuclear power reactors against radiological 
    sabotage,'' paragraph (a), in part, states that ``The licensee shall 
    establish and maintain an onsite physical protection system and 
    security organization which will have as its objective to provide high 
    assurance that activities involving special nuclear material are not 
    inimical to the common defense and security and do not constitute and 
    unreasonable risk to the public health and safety.''
        10 CFR 73.55(d), ``Access Requirements,'' paragraph (I), specifies 
    that ``The licensee shall control all points of personnel and vehicle 
    access into a protected area.'' 10 CFR 73.55(d)(5) requires that ``A 
    numbered picture badge identification system shall be used for all 
    individuals who are authorized access to protected areas without 
    escort.'' 10 CFR 73.55(d)(5) also states that an individual not 
    employed by the licensee (i.e., contractors) may be authorized access 
    to protected areas without escort provided the individual ``receives a 
    picture badge upon entrance into the protected areas which must be 
    returned upon exit from the protected area* * *''
        The licensee proposed to implement an alternative unescorted access 
    control system which would eliminate the need to issue and retrieve 
    badges at each entrance/exit location and would allow all individuals 
    with unescorted access to keep their badge with them when departing the 
    site.
        An exemption from 10 CFR 73.55(d)(5) is required to allow 
    contractors who have unescorted access to take their badges offsite 
    instead of returning them when exiting the site. By letter dated 
    October 24, 1994, the licensee requested an exemption from certain 
    requirements of 10 CFR 73.55(d)(5) for this purpose.
    
    III
    
        Pursuant to 10 CFR 73.5, ``Specific exemptions,'' the Commission 
    may, upon application of any interested person or upon its own 
    initiative, grant such exemptions from the requirements of the 
    regulations in this part as it determines are authorized by law and 
    will not endanger life or property or the common defense and security, 
    and are otherwise in the public interest.
        Pursuant to 10 CFR 73.55, the Commission may authorize a licensee 
    to provide alternative measures for protection against radiological 
    sabotage provided the licensee demonstrates that the alternative 
    measures have ``the same high assurance objective'' and meet ``the 
    general performance requirements'' of the regulation, and ``the overall 
    level of system performance provides protection against radiological 
    sabotage equivalent'' to that which would be provided by the 
    regulation.
        Currently, employee and contractor identification/access control 
    cards are issued and retrieved on the occasion of each entry to and 
    exit from the protected areas of the River Bend site. Station security 
    personnel are required to maintain control of the badges while the 
    individuals are offsite. This practice has been in effect at the River 
    Bend Station, Unit 1 since the operating license was issued. Security 
    personnel retain each identification access control card, when not in 
    use by the authorized individual, within appropriately designed storage 
    receptacles inside a bullet-resistant enclosure. An individual who 
    meets the access authorization requirements is issued a picture 
    identification card which also serves as an access control card. This 
    card allows entry into preauthorized areas of the station. While 
    entering the plant in the present configuration, an authorized 
    individual is ``screened'' by the required detection equipment and by 
    the issuing security officer. Having received the badge, the individual 
    proceeds to the access portal, inserts the access control card into the 
    card reader, and passes through the turnstile which is unlocked by the 
    access card. Once inside the station, the access card allows entry into 
    areas if the preauthorized criteria are met.
        This present procedure is labor intensive since security personnel 
    are required to verify badge issuance, ensure badge retrieval, and 
    maintain the badges in orderly storage until the next entry into the 
    protected area. The regulations permit employees to remove their badges 
    from the site, but an exemption from 10 CFR 73.55(d)(5) is required to 
    permit contractors to take their badges offsite instead of returning 
    them when exiting the site.
        Under the proposed system, all individuals authorized to gain 
    unescorted access will have the physical characteristics of their hand 
    (hand geometry) recorded with their badge number. Since the hand 
    geometry is unique to each individual and its application in the entry 
    screening function would preclude unauthorized use of a badge, the 
    requested exemption would allow employees and contractors to keep their 
    badges at the time of exiting the protected area. The process of 
    verifying badge issuance, ensuring badge retrieval, and maintaining 
    badges could be eliminated while the balance of the access procedure 
    would remain intact. Firearm, explosive and metal detection equipment 
    and provisions for conducting searches will remain as well. The 
    security officer responsible for the last access control function 
    (controlling admission to the protected area) will also remain isolated 
    within a bullet-resistant structure in order to assure his or her 
    ability to respond or to summon assistance.
        Use of a hand geometry biometrics system exceeds the present 
    verification methodology's capability to discern an individual's 
    identity. Unlike the photograph identification badge, hand geometry is 
    nontransferable. During the initial access authorization or 
    registration process, hand measurements are recorded and the template 
    is stored for subsequent use in the identity verification process 
    required for entry into the protected area.
        Authorized individuals insert their access authorization card into 
    the card reader and the biometrics system records an image of the hand 
    geometry. The unique features of the newly recorded image are then 
    compared to the template previously stored in the database. Access is 
    ultimately granted based on the degree to which the characteristics of 
    the image match those of the ``signature'' template.
        Since both the badge and hand geometry would be necessary for 
    access into the protected area, the proposed system would provide for a 
    positive 
    
    [[Page 36447]]
    verification process. Potential loss of a badge by an individual, as a 
    result of taking the badge offsite, would not enable an unauthorized 
    entry into protected areas.
        The access process will continue to be under the observation of 
    security personnel. The system of identification badges coupled with 
    their associated access control cards will continue to be used for all 
    individuals who are authorized access to protected areas without 
    escorts. Badges will continue to be displayed by all individuals while 
    inside the protected area. Addition of a hand geometry biometrics 
    system will provide a significant contribution to effective 
    implementation of the security plan at each site.
    
    IV
    
        For the foregoing reasons, pursuant to 10 CFR 73.55, the NRC staff 
    has determined that the proposed alternative measures for protection 
    against radiological sabotage meet ``the same high assurance 
    objective,'' and ``the general performance requirements'' of the 
    regulation and that ``the overall level of system performance provides 
    protection against radiological sabotage equivalent'' to that which 
    would be provided by the regulation.
        Accordingly, the Commission has determined that, pursuant to 10 CFR 
    73.5, an exemption is authorized by law, will not endanger life or 
    property or common defense and security, and is otherwise in the public 
    interest. Therefore, as long as the licensee uses the hand geometry 
    access control system, the Commission hereby grants Entergy Operations, 
    Inc. an exemption from those requirements of 10 CFR 73.55(d)(5) 
    relating to the returning of picture badges upon exit from the 
    protected area such that individuals not employed by the licensee, 
    i.e., contractors, who are authorized unescorted access into the 
    protected area, can take their badges offsite.
        Pursuant to 10 CFR 51.32, the Commission has determined that the 
    granting of this exemption will have no significant impact on the 
    quality of the human environment (60 FR 30116). This exemption is 
    effective upon issuance.
    
        Dated at Rockville, Maryland, this 7th day of July 1995.
    
        For the Nuclear Regulatory Commission.
    Jack W. Roe,
    Director, Division of Reactor Projects III/IV, Office of Nuclear 
    Reactor Regulation.
    [FR Doc. 95-17448 Filed 7-14-95; 8:45 am]
    BILLING CODE 7590-01-M
    
    

Document Information

Published:
07/17/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-17448
Pages:
36446-36447 (2 pages)
Docket Numbers:
Docket No. 50-458
PDF File:
95-17448.pdf