96-18120. Empresa de Generaci N Electrica Nor Peru S.A., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 138 (Wednesday, July 17, 1996)]
    [Notices]
    [Pages 37252-37256]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-18120]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG96-79-000, et al.]
    
    
    Empresa de Generaci N Electrica Nor Peru S.A., et al.; Electric 
    Rate and Corporate Regulation Filings
    
    July 10, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Empresa de Generaci N Electrica Nor Peru S.A.
    
    [Docket No. EG96-79-000]
    
        On June 28, 1996, Empresa De Generacion Electrica Nor Peru 
    (``EGENOR''), filed with the Federal Energy Regulatory Commission an 
    application for determinations of exempt wholesale generator status 
    pursuant to Part 365 of the Commission's Regulations.
        Sixty percent of EGENOR, a Peruvian corporation, will be owned by 
    Inversions Dominion Peru S.A., a wholly-owned indirect subsidiary of 
    Dominion Energy, Inc., a Virginia corporation which in turn is a 
    wholly-owned subsidiary of Dominion Resources, Inc., also a Virginia 
    corporation.
        EGENOR will own and operate two run-of-river hydroelectric 
    facilities and six combustion turbine/diesel generator facilities in 
    Peru with a combined installed capacity of approximately 405 MW. 
    (collectively, the ``Facilities''). The Facilities are located in 
    Huaylas Province, Chota Province, and the towns of Chimbote, Trujillo, 
    Chiclayo, Piura, Sullana and Palta, Peru.
        Comment date: July 31, 1996, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Glenns Ferry Cogneration Partners, Ltd.
    
    [Docket No. EG96-80-000]
    
        On July 3, 1996, Glenns Ferry Cogeneration Partners, Ltd. 
    (``Applicant'') (c/o Jonathan W. Gottleib, Esq., Reid & Priest LLP, 701 
    Pennsylvania Avenue, NW, Washington, DC 20004) filed with the Federal 
    Energy Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations.
        Applicant is a limited partnership organized and in good standing 
    under the laws of the Colorado. Applicant was formed to own an electric 
    generating facility to be located in Glenns Ferry, Idaho.
        Comment date: July 31, 1996, in accordance with standard Paragraph 
    E at the end of this notice. The
    
    [[Page 37253]]
    
    Commission will limit its consideration of comments to those that 
    concern the adequacy or accuracy of the application.
    
    3. Rupert Cogeneration Partners, Ltd.
    
    [Docket No. EG96-81-000]
    
        On July 3, 1996, Rupert Cogeneration Partners, Ltd. (``Applicant'') 
    (c/o Jonathan W. Gottleib, Esq., Reid & Priest LLP, 701 Pennsylvania 
    Avenue, NW, Washington, DC 20004) filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    Regulations.
        Applicant is a limited partnership organized and in good standing 
    under the laws of the Colorado. Applicant was formed to own an electric 
    generating facility to be located in Rupert, Idaho.
        Comment date: July 31, 1996, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    4. Concord Electric Company
    
    [Docket No. ER96-1429-000]
    
        Take notice that on June 20, 1996, Concord Electric Company 
    tendered for filing an amendment in the above-referenced docket.
        Comment date: July 25, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Exeter & Hampton Electric Company
    
    [Docket No. ER96-1430-000]
    
        Take notice that on June 20, 1996, Exeter & Hampton Electric 
    Company tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: July 25, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Entergy Services, Inc.
    
    [Docket No. ER96-2268-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Transmission Service Agreement (TSA) between Entergy Services, Inc. and 
    Duke/Louis Dreyfus. Entergy Services states that the TSA sets out the 
    transmission arrangements under which the Entergy Operating Companies 
    provide non-firm transmission service under their Transmission Service 
    Tariff.
        Comment date: July 23, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Entergy Services, Inc.
    
    [Docket No. ER96-2269-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Service Agreement for the sale of capacity and energy to Mississippi 
    Power Company and Southern Company Services, Inc. as agent for Alabama 
    Power Company, Georgia Power Company, Gulf Power Company, Mississippi 
    Power Company and Savannah Electric Power Company (collectively SCSI) 
    pursuant to Rate Schedule SP--System Power accepted for filing by the 
    Commission in Docket No. ER91-569. Entergy Services request waiver of 
    the notice requirements to permit an effective date of June 1, 1995.
        Comment date: July 23, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Entergy Services, Inc.
    
    [Docket No. ER96-2270-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Letter Agreement for the sale of limited firm capacity and associated 
    energy to Alabama Electric Cooperative, Inc. (AECI) pursuant to Service 
    Schedule LF--Limited Firm Capacity and Energy of the Interchange 
    Agreement between Entergy Mississippi, Inc. and AECI. Entergy Services 
    requests waiver of the notice requirements to permit an effective date 
    of July 1, 1995.
        Comment date: July 23, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Entergy Services, Inc.
    
    [Docket No. ER96-2271-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating companies), tendered for filing a 
    Transmission Service Agreement (TSA) between Entergy Services, Inc. and 
    Aquila Power Corporation. Entergy Services states that the TSA sets out 
    the transmission arrangements under which the Entergy Operating 
    Companies provide non-firm transmission service under their 
    Transmission Service Tariff.
        Comment date: July 23, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Entergy Services, Inc.
    
    [Docket No. ER96-2272-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Transmission Service Agreement (TSA) between Entergy Services, Inc. and 
    Southern Company Services, Inc. Entergy Services states that the TSA 
    sets out the transmission arrangements under which the Entergy 
    Operating Companies provide non-firm transmission service under their 
    Transmission Service Tariff.
        Comment date: July 23, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Entergy Services, Inc.
    
    [Docket No. ER96-2273-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Transmission Service Agreement (TSA) between Entergy Services, Inc. and 
    Commonwealth Edison Company. Entergy Services states that the TSA sets 
    out the transmission arrangements under which the Entergy Operating 
    Companies provide non-firm transmission service under their 
    Transmission Service Tariff.
        Comment date: July 23, 1996, in accordance with standard Paragraph 
    E at the end of this notice.
    
    12. Dayton Power and Light Company
    
    [Docket No. ER96-2274-000]
    
        Take notice that on June 28, 1996, Dayton Power and Light Company 
    (DP&L) tendered for filing an executed bilateral agreement dated June 
    25, 1996 between DP&L and American Municipal Power-Ohio, Inc. (AMP-
    Ohio). Under the agreement DP&L will provide AMP-Ohio with 30 MW of 
    non-firm point-to-point transmission service from DP&L's 
    interconnection with Cincinnati Gas & Electric Company (CG&E) to DP&L's 
    interconnection with The Ohio Edison Company (OE).
    
    [[Page 37254]]
    
        DP&L requests an effective date of July 1, 1996 and waiver of the 
    Commission's notice requirements.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Montaup Electric Company
    
    [Docket No. ER96-2275-000]
    
        Take notice that on June 28, 1996, Montaup Electric Company 
    tendered for filing an annual report titled Conservation and Load 
    Management Informational Report Proposed Surcharge--June 28, 1996--
    supporting surcharges for the period July 1, 1996 through December 31, 
    1996. This annual report filing is required under a conservation and 
    load management (C&LM) clause applied to service to Montaup's 
    affiliated M-rate customers as amended by Montaup in a filing approved 
    by the Commission on December 29, 1994 in Docket No. ER95-241-000. The 
    informational report shows the surcharges that will be required to true 
    up collections for the twelve months ended December 31, 1995 with 
    actual C&LM cost for calendar-year 1995.
        Comment date: September 27, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Boston Edison Company
    
    [Docket No. ER96-2276-000]
    
        Take notice that on June 28, 1996, Boston Edison Company (Boston 
    Edison) tendered for filing a letter agreement between Boston Edison 
    Company and Cambridge Electric Light Company (CEL). The tendered letter 
    agreement extends the terms and conditions of the Substation 402 
    Agreement to and including September 30, 1996. The Substation 402 
    Agreement is designated as Boston Edison's FERC Rate Schedule No. 149. 
    Boston Edison requests an effective date of June 30, 1996.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Entergy Services, Inc.
    
    [Docket No. ER96-2277-000]
    
        Take notice that on June 28, 1996, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (Entergy Operating Companies), tendered for filing a 
    Letter Agreement for the sale of limited firm capacity and associated 
    energy to Alabama Electric Cooperative, Inc. (AECI) pursuant to Service 
    Schedule LF--Limited Firm Capacity and Energy of the Interchange 
    Agreement between Entergy Mississippi, Inc. and AECI. Entergy Services 
    requests waiver of the notice requirements to permit an effective date 
    of June 1, 1995.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Midwest Energy, Inc.
    
    [Docket No. ER96-2278-000]
    
        Take notice that on June 28, 1996, Midwest Energy, Inc. (Midwest) 
    tendered for filing Service Agreements for Opportunity Sales Service 
    entered into between Midwest and the following customers:
    
    City of Colby (Fully Executed)
    City of Jetmore (Fully Executed)
    City of Oakley (Fully Executed)
    City of LaCrosse (Fully Executed)
    City of Hill City, Kansas (Partially Executed)
    
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Louisville Gas and Electric Company
    
    [Docket No. ER96-2281-000]
    
        Take notice that on July 1, 1996, Louisville Gas and Electric 
    Company tendered for filing copies of a service agreement between 
    Louisville Gas and Electric Company and Electric Clearinghouse Inc. 
    under Rate GSS.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Louisville Gas and Electric Company
    
    [Docket No. ER96-2282-000]
    
        Take notice that on July 1, 1996, Louisville Gas and Electric 
    Company tendered for filing copies of a service agreement between 
    Louisville Gas and Electric Company and Louis Dreyfus Electric Power 
    Inc. under Rate GSS.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Central Power and Light Company, West Texas Utilities Company
    
    [Docket No. ER96-2283-000]
    
        Take notice that on July 1, 1996, Central Power and Light Company 
    and West Texas Utilities Company, (jointly, the Companies) tendered for 
    filing a service agreement under which they will provide transmission 
    service to Calpine Power Services Company (Calpine) under their point-
    to-point transmission service tariff.
        The Companies state that copies of the filing have been served on 
    Calpine.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Public Service Company of Oklahoma, Southwestern Electric Power 
    Co.
    
    [Docket No. ER96-2284-000]
    
        Take notice that on July 1, 1996, Public Service Company of 
    Oklahoma and Southwestern Electric Power Company (collectively, the 
    Companies) tendered for filing a Service agreement under which they 
    will provide transmission service to Calpine Power Services Company 
    (Calpine) under their point-to-point transmission service tariff.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Duke Power Company
    
    [Docket No. ER96-2285-000]
    
        Take notice that Duke Power Company (Duke or Company) on July 1, 
    1996, tendered for filing the Fifth Amendments to the Interconnection 
    Agreements (Amendments) dated June 1, 1996, between the Company and 
    North Carolina Electric Membership Corporation (NCEMC) and Saluda River 
    Electric Cooperative, Inc. (Saluda River). Duke, NCEMC, and Saluda 
    River are three of the joint owners of the Catawba Nuclear Station. 
    Under the terms of the Interconnection Agreements, Duke interconnects 
    its generation and transmission system with the Catawba Nuclear 
    Station, wheels electric power and energy to the members of the other 
    joint owners, provides supplemental capacity and energy to the members 
    of the other joint owners, provides supplemental capacity and energy in 
    excess of that provided by the owners' ownership interest, and provides 
    back-up services. Duke states that these Amendments were entered into 
    in connection with a settlement of certain disputes under the 
    Interconnection Agreements which included the revision of those 
    portions of the Interconnection Agreements that would facilitate the 
    sale of Surplus Energy by NCEMC and Saluda River to third parties.
        Duke states that the Interconnection Agreements are on file with 
    the Commission and have been designated as follows:
    
    Rate Schedule FERC No. 273 (NCEMC)
    Rate Schedule FERC No. 274 (Saluda
    River)
    
        Copies of this filing were mailed to NCEMC, Saluda River, the North 
    Carolina Utilities Commission, and the
    
    [[Page 37255]]
    
    South Carolina Public Service Commission.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Illinois Power Company
    
    [Docket No. ER96-2286-000]
    
        Take notice that on July 1, 1996, Illinois Power Company (Illinois 
    Power) tendered for filing firm and non-firm transmission agreements 
    under which Eastern Power Corporation, Inc. will take transmission 
    service pursuant to its open access transmission tariff. The agreements 
    are based on the Form of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 1,1996.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. Illinois Power Company
    
    [Docket No. ER96-2287-000]
    
        Take notice that on July 1, 1996, Illinois Power Company (Illinois 
    Power) tendered for filing non-firm transmission agreements under which 
    Tennessee Power Company will take transmission service pursuant to its 
    open access transmission tariff. The agreements are based on the Form 
    of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 1, 1996.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. Illinois Power Company
    
    [Docket No. ER96-2288-000]
    
        Take notice that on July 1, 1996, Illinois Power Company (Illinois 
    Power) tendered for filing firm and non-firm transmission agreements 
    under which National Gas & Electric L.P. will take transmission service 
    pursuant to its open access transmission tariff. The agreements are 
    based on the Form of Service Agreement in Illinois Power's tariff.
        Illinois Power has requested an effective date of July 1, 1996.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    25. Arizona Public Service Company
    
    [Docket No. ER96-2289-000]
    
        Take notice that on July 1, 1996, Arizona Public Service Company 
    (APS), tendered for filing a Service Agreement under APS-FERC Electric 
    Tariff Original Volume No. 1 (APS Tariff) with the following entity:
    
    City of Azusa
    
        A copy of this filing has been served on the above listed party and 
    the Arizona Corporation Commission.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. Northern States Power Company (Minnesota Company)
    
    [Docket No. ER96-2290-000]
    
        Take notice that on July 1, 1996, Northern States Power Company 
    (Minnesota) (NSP), tendered for filing the following Transmission 
    Service Agreement between NSP and Wisconsin Public Service Company.
        NSP requests that the Commission accept the agreement effective 
    June 12, 1996, and requests waiver of the Commission's notice 
    requirements in order for the agreement to be accepted for filing on 
    the date requested.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. Northern Indiana Public Service Company
    
    [Docket No. ER96-2291-000]
    
        Take notice that on July 1, 1996, Northern Indiana Public Service 
    Company, tendered for filing an executed Service Agreement between 
    Northern Indiana Public Service Company and Duke/Louis Dreyfus L.L.C.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to Duke/Louis Dreyfus L.L.C. under 
    Northern Indiana Public Service Company's Power Sales Tariff, which was 
    accepting for filing by the Commission and made effective by Order 
    dated August 17, 1995 in Docket No. ER95-1222-000. Northern Indiana 
    Public Service Company and Duke/Louis Dreyfus L.L.C. request waiver of 
    the Commission's sixty-day notice requirement to permit an effective 
    date of July 1, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. Northern Indiana Public Service Company
    
    [Docket No. ER96-2292-000]
    
        Take notice that on July 1, 1996, Northern Indiana Public Service 
    Company, tendered for filing an executed Service Agreement between 
    Northern Indiana Public Service Company and TransCanada Power 
    Corporation.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to TransCanada Power Corporation 
    under Northern Indiana Public Service Company's Power Sales Tariff, 
    which was accepting for filing by the Commission and made effective by 
    Order dated August 17, 1995 in Docket No. ER95-1222-000. Northern 
    Indiana Public Service Company and TransCanada Power Corporation 
    request waiver of the Commission's sixty-day notice requirement to 
    permit an effective date of July 1, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    29. New York State Electric & Gas Corporation
    
    [Docket No. ER96-2293-000]
    
        Take notice that on July 1, 1996, New York State Electric & Gas 
    Corporation (NYSEG) tendered for filing pursuant to Sec. 35.12 of the 
    Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
    18 CFR 35.12, as an initial rate schedule, an agreement with Duke/Louis 
    Dreyfus L.L.C. (D/LD). The agreement provides a mechanism pursuant to 
    which the parties can enter into separately scheduled transactions 
    under which NYSEG will sell to D/LD and D/LD will purchase from NYSEG 
    either capacity and associated energy or energy only as the parties may 
    mutually agree.
        NYSEG requests that the agreement become effective on July 2, 1996, 
    so that the parties may, if mutually agreeable, enter into separately 
    scheduled transactions under the agreement. NYSEG has requested waiver 
    of the notice requirements for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and D/LD.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    30. Upper Peninsula Power Company
    
    [Docket No. ER96-2294-000]
    
        Take notice that on July 1, 1996, Upper Peninsula Power Company 
    (UPPCO), tendered for filing a proposed Power Service Agreement for 
    sales of electricity to the Village of Baraga, Michigan. UPPCO states 
    that the rates established in the Power Service
    
    [[Page 37256]]
    
    Agreement for 1996 will result in a decrease in revenues from sales to 
    Baraga of approximately 9% annually. UPPCO has asked for waiver of the 
    notice provisions of the Commission's regulations in order to make the 
    Power Service Agreement effective in accordance with its terms 
    beginning July 1, 1996.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    31. Florida Power Corporation
    
    [Docket No. ER96-2295-000]
    
        Take notice that on July 2, 1996, Florida Power Corporation, 
    tendered for filing a modification to its power sales tariff. Florida 
    Power requests that the Commission waive its notice requirements and 
    allow the modification to take effect on July 2, 1996, the day on which 
    it was filed.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    32. AIG Trading Corporation
    
    [Docket No. ER96-2296-000]
    
        Take notice that on July 1, 1996, AIG Trading Corporation (AIGTC), 
    tendered for filing a letter from the Executive Committee of the 
    Western Systems Power Pool (WSPP) indicating that AIGTC had completed 
    all the steps for good membership. AIGTC requests that the Commission 
    amend the WSPP Agreement to include it as a member.
        AIGTC requests an effective date of July 1, 1996 for the proposed 
    amendment. Accordingly, AIGTC requests waiver of the Commission's 
    notice requirements for good cause shown.
        Copies of the filing were served upon the WSPP Executive Committee.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    33. Indianapolis Power & Light Company
    
    [Docket No. ER96-2297-000]
    
        Take notice that on July 2, 1996, Indianapolis Power & Light 
    Company (IPL), tendered for filing a letter agreement extending by one 
    year to August 31, 1997, the service IPL currently provides to PSI 
    Energy, a public utility subsidiary of Cinergy, under an existing 
    interconnection agreement.
        Copies of this filing were sent to the Indiana Utility Regulatory 
    Commission and Cinergy.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    34. Union Electric Company
    
    [Docket No. ER96-2298-000]
    
        Take notice that on July 2, 1996, Union Electric Company (UE), 
    tendered for filing a Transmission Service Agreement dated June 30, 
    1996 between Duke/Louis Dreyfus L.L.C. (D/LD) and UE. UE asserts that 
    the purpose of the Agreement is to act out specific rates, terms, and 
    conditions for transmission service transactions from UE to D/LD.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    35. Union Electric Company
    
    [Docket No. ER96-2299-000]
    
        Take notice that on July 2, 1996, Union Electric Company (UE), 
    tendered for filing an Interchange Agreement dated June 30, 1996, 
    between UE and Duke Power Company. UE asserts that the purpose of the 
    Agreement is to set out specific rates, terms, and conditions for the 
    types of power and energy to be exchanged.
        Comment date: July 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (19 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-18120 Filed 7-16-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/17/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-18120
Dates:
July 31, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
37252-37256 (5 pages)
Docket Numbers:
Docket No. EG96-79-000, et al.
PDF File:
96-18120.pdf