-
Start Preamble
The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING:
Federal Energy Regulatory Commission.
DATE AND TIME:
July 19, 2012, 10:00 a.m.
PLACE:
Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS:
Open.
MATTERS TO BE CONSIDERED:
Agenda.
* NOTE—Items listed on the agenda may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.
983RD—MEETING
REGULAR MEETING
July 19, 2012, 10:00 a.m.
Item No. Docket No. Company ADMINISTRATIVE A-1 AD02-1-000 Agency Business Matters. A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations. ELECTRIC E-1 ER12-1265-000, ER12-1265-001, ER09-1049-005 Midwest Independent Transmission System Operator, Inc. E-2 ER12-1266-000, ER12-1266-001, ER11-4337-001 Midwest Independent Transmission System Operator, Inc. E-3 OMITTED E-4 AD12-9-000, AD11-11-000 Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded Transmission Projects, Priority Rights to New Participant-Funded Transmission. E-5 NP11-238-000 North American Electric Reliability Corporation. E-6 RM12-9-000 Regional Reliability Standard PRC-006-SERC-01—Automatic Underfrequency Load Shedding Requirements. E-7 EL12-19-001 FirstEnergy Solutions Corp. and Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C. E-8 EL12-56-000 Energy Spectrum, Inc. and Riverbay Corporation v. New York Independent System Operator, Inc. E-9 AC11-46-000 Ameren Corporation. E-10 NJ08-2-001 United States Department of Energy—Bonneville Power Administration. E-11 ER10-253-001, EL10-14-001 Primary Power, LLC. E-12 EL10-52-001 Central Transmission, LLC v. PJM Interconnection L.L.C. E-13 EL12-69-000 Primary Power, LLC v. PJM Interconnection, L.L.C. E-14 EL12-24-000 Pioneer Transmission, LLC v. Northern Indiana Public Service Company and Midwest Independent Transmission System Operator, Inc. E-15 EL12-28-000 Xcel Energy Services Inc. and Northern States Power Company, a Wisconsin Corporation v. American Transmission Company, LLC. E-16 EL12-49-000 Northern Indiana Public Service Company. E-17 EL12-55-000 SIG Energy, LLLP v. California Independent System Operator Corporation. E-18 ER10-2061-000, ER10-2061-001, ER10-2061-002, ER10-2061-003, ER10-2061-004 Tampa Electric Company. E-19 ER11-4244-001 Midwest Independent Transmission System Operator, Inc. MISCELLANEOUS M-1 RM12-13-000 Continuity of Operations Plan. GAS G-1 RM96-1-037 Standards for Business Practices for Interstate Natural Gas Pipelines. HYDRO H-1 P-13226-004 Blue Heron Hydro LLC. H-2 P-2146-137 Alabama Power Company. H-3 P-1881-076 PPL Holtwood, LLC. Start Printed Page 41980 CERTIFICATES C-1 CP12-40-000 Questar Pipeline Company. C-2 OMITTED C-3 CP12-47-000 Chipeta Processing LLC. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
Start SignatureDated: July 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-17415 Filed 7-13-12; 4:15 pm]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 07/17/2012
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2012-17415
- Pages:
- 41979-41980 (2 pages)
- PDF File:
- 2012-17415.pdf