2018-15318. Sunshine Act Meeting Notice  

  • Start Preamble

    The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:

    AGENCY HOLDING MEETING:

    Federal Energy Regulatory Commission.

    DATE AND TIME:

    July 19, 2018, 10:00 a.m.

    PLACE:

    Room 2C, 888 First Street NE, Washington, DC 20426.

    STATUS:

    Open.

    MATTERS TO BE CONSIDERED:

    Agenda.* Note—Items listed on the agenda may be deleted without further notice.

    CONTACT PERSON FOR MORE INFORMATION:

    Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

    For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's website at http://ferc.capitolconnection.org/​ using the eLibrary link, or may be examined in the Commission's Public Reference Room.

    1046th—Meeting

    Item No.Docket No.Company
    Administrative
    A-1AD18-1-000Agency Administrative Matters.
    A-2AD18-2-000Customer Matters, Reliability, Security and Market Operations.
    Electric
    E-1RM18-2-000Cyber Security Incident Reporting Reliability Standards.
    E-2RM18-15-000Revisions to Parts 45 and 46 of the Commission's Regulations.
    E-3RR17-6-000North American Electric Reliability Corporation.
    E-4EL15-67-003Linden VFT, LLC v. PJM Interconnection, L.L.C.
    ER15-2562-002PJM Interconnection, L.L.C.
    ER17-950-003PJM Interconnection, L.L.C.
    EL17-68-000Linden VFT, LLC v. PJM Interconnection, L.L.C.
    EL17-84-001PJM Interconnection, L.L.C.
    EL17-90-001Linden VFT, LLC v. Public Service Electric and Gas Company and PJM Interconnection, L.L.C.
    EL17-94-000New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission Owners in their Collective Capacity.
    ER18-579-002PJM Interconnection, L.L.C.
    ER18-680-000 (Not Consolidated)PJM Interconnection, L.L.C.
    E-5EL18-146-000KCP&L Greater Missouri Operations Company.
    E-6EL15-95-003Delaware Public Service Commission and Maryland Public Service Commission v. PJM Interconnection, L.L.C. and Certain Transmission Owners Designated under CTOA RS FERC No. 42.
    Gas
    G-1OR14-4-002Guttman Energy, Inc. and PBF Holding Company LLC v. Buckeye Pipe Line Company, L.P. and Laurel Pipe Line Company, L.P.
    Hydro
    H-1OMITTED
    H-2P-2114-296Public Utility District No. 2 of Grant County, Washington.
    H-3P-12611-011Verdant Power, LLC.
    Certificates
    C-1CP17-80-000Columbia Gas Transmission, LLC.
    Start Printed Page 33219
    C-2CP18-10-000Texas Eastern Transmission, LP.
    C-3CP17-441-000, CP17-441-001Northwest Pipeline LLC.
    C-4CP18-66-000 CP18-69-000Gulf South Pipeline Company, LP. Tristate NLA, LLC.
    C-5CP18-5-001Constitution Pipeline Company, LLC.
    C-6CP16-22-001NEXUS Gas Transmission, LLC.
    CP16-23-001Texas Eastern Transmission, LP.
    CP16-24-001DTE Gas Company.
    CP16-102-001Vector Pipeline L.P.
    C-7CP16-486-001Millennium Pipeline Company, L.L.C.
    Start Signature

    Issued: July 12, 2018.

    Kimberly D. Bose,

    Secretary.

    End Signature

    A free webcast of this event is available through http://ferc.capitolconnection.org/​. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov' s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://ferc.capitolconnection.org/​ or contact Danelle Springer or David Reininger at 703-993-3100.

    Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

    End Preamble

    [FR Doc. 2018-15318 Filed 7-13-18; 4:15 pm]

    BILLING CODE 6717-01-P

Document Information

Published:
07/17/2018
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2018-15318
Pages:
33218-33219 (2 pages)
PDF File:
2018-15318.pdf