-
Start Preamble
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA) is finalizing its decision to grant a 1-year extension of the attainment date for the Oakridge, Oregon nonattainment area to meet the 2006 24-hour PM2.5 NAAQS from December 31, 2015 to December 31, 2016, on the basis that the State has met the criteria for such an extension under the Clean Air Act (CAA).
DATES:
This final rule is effective August 17, 2016.
ADDRESSES:
The EPA has established a docket for this action under Docket ID No. EPA-R10-OAR-2016-0051. All documents in the docket are listed on the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information the disclosure of which is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through http://www.regulations.gov or in hard copy at the Air Planning Unit, Office of Air and Waste, EPA Region 10, 1200 Sixth Avenue, Seattle, WA 98101. The EPA requests that if at all possible, you contact the individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view the hard copy of the docket Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
For information please contact Justin Spenillo at (206) 553-6125, spenillo.justin@epa.gov or by using the above EPA, Region 10 address.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Table of Contents
I. Background Information
II. Final Action
III. Statutory and Executive Orders Review
I. Background Information
On May 18, 2016, the EPA proposed to grant a 1-year extension of the attainment date for the Oakridge, Oregon nonattainment area to meet the 2006 24-hour PM2.5 NAAQS from December 31, 2015 to December 31, 2016, on the basis that the State has met the criteria for such an extension under the CAA (81 FR 31202). An explanation of the CAA requirements, a detailed analysis of the submittal, and the EPA's reasons for proposing approval were provided in the notice of proposed rulemaking, and will not be restated here. The public comment period for this proposed rule ended on June 17, 2016. The EPA received no comments on the proposal.
II. Final Action
The EPA finds that the State has met the criteria for receiving a 1-year extension to the Moderate area attainment date for the 2006 PM2.5 NAAQS for the Oakridge NAA as provided in section 188(d) of the Act. The State is implementing the requirements and commitments in the applicable attainment plan for the PM2.5 NAAQS in the area, and the 98th percentile 24-hour PM2.5 air quality value for 2015 is below 35 μg/m3. Accordingly, the State has established that it meets the criteria of section 188(d) as the EPA interprets those requirements for purposes of the 2006 Start Printed Page 46613PM2.5 NAAQS. The EPA therefore exercises the discretion granted to the Administrator by section 188(d) of the CAA to extend the Moderate area attainment date for the Oakridge NAA from December 31, 2015 to December 31, 2016.
III. Statutory and Executive Orders Review
Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:
- Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
- does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
- is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
- does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
- does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
- is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
- is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
- is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and
- does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and it will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by September 16, 2016. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2)).
Start List of SubjectsList of Subjects in 40 CFR Part 52
- Environmental protection
- Air pollution control
- Incorporation by reference
- Nitrogen dioxide
- Ozone
- Particulate matter
- Reporting and recordkeeping requirements
- Sulfur oxides
- Volatile organic compounds
Dated: July 7, 2016.
Michelle L. Pirzadeh,
Acting Regional Administrator, Region 10.
[FR Doc. 2016-16789 Filed 7-15-16; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Effective Date:
- 8/17/2016
- Published:
- 07/18/2016
- Department:
- Environmental Protection Agency
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2016-16789
- Dates:
- This final rule is effective August 17, 2016.
- Pages:
- 46612-46613 (2 pages)
- Docket Numbers:
- EPA-R10-OAR-2016-0051, FRL-9949-18-Region 10
- Topics:
- Air pollution control, Environmental protection, Incorporation by reference, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds
- PDF File:
- 2016-16789.pdf
- Supporting Documents:
- » 104 Oakridge Extension Request
- » 103 LRAPA PM 2-5 at Oakridge and Other Lane County Monitoring Sites in 2006-...
- » 102 LRAPA letter to EPA re Oakridge extension request follow-up on February 11, 2016
- » 101 Extension Request Complete Dec 2015 Submittal
- CFR: (1)
- 40 CFR 52