95-17705. Northwest Pipeline Corporation; Notice of Application  

  • [Federal Register Volume 60, Number 138 (Wednesday, July 19, 1995)]
    [Notices]
    [Page 37060]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-17705]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-612-000]
    
    Northwest Pipeline Corporation; Notice of Application
    
    July 13, 1995.
        Take notice that on July 12, 1995, Northwest Pipeline Corporation 
    (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, filed in 
    Docket No. CP95-612-000, an application pursuant to Sections 7(c) and 
    7(b) of the Natural Gas Act and Part 157 of the Commission's 
    Regulations for an order granting a certificate of public convenience 
    and necessity for authorization to construct and operate certain 
    replacement natural gas facilities and for authorization to abandon and 
    remove the facilities being replaced, all as more fully set forth in 
    the request which is on file with the Commission and open to public 
    inspection.
        Northwest proposes to (1) construct and operate approximately 2,620 
    feet each of new 26-inch and 30-inch replacement pipeline in new right-
    of-way; (2) remove and abandon approximately 470 feet each of existing 
    26-inch and 30-inch pipeline; and (3) abandon in-place approximately 
    1,580 feet each of existing 26-inch mainline and 30-inch loop line, all 
    in Cowlitz County, Washington. Northwest states that the installation 
    of replacement pipeline and the removal and abandonment of existing 
    line is necessary to ensure the safety and integrity of its mainline 
    transmission system by relocating Northwest's lines away from an area 
    prone to landslides.
        Northwest indicates that its planned construction window for the 
    installation of replacement pipeline and the removal of the existing 
    pipeline is from September 1 to October 20, 1995. Northwest maintains 
    the project must be completed prior to the advent of the rainy season, 
    which could possibly cause earth movement in the vicinity of 
    Northwest's pipelines, placing stress on the pipelines, causing them to 
    rupture. Northwest asserts that is plans to complete the proposed 
    construction and place the replacement pipeline in service prior to the 
    start of the 1995-96 winter heating season.
        Northwest states that the proposed pipeline relocation and 
    replacements will result in no increase in the capacity of its mainline 
    transmission system.
        Northwest estimates the total cost to construct the proposed 
    replacement pipeline and abandon the existing pipeline segments at 
    approximately $1,964,700.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before July 21, 1995, file 
    with the Federal Energy Regulatory Commission, Washington, D.C. 20426, 
    a motion to intervene or a protest in accordance with the requirements 
    of the Commission's Rules of Practice and Procedure (18 CFR 385.214 and 
    385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). 
    All protests filed with the Commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceeding. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate for the proposal is required by 
    the public convenience and necessity. If a motion for leave to 
    intervene is timely filed, or if the Commission on its own motion 
    believes that formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Northwest to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-17705 Filed 7-18-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
07/19/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-17705
Pages:
37060-37060 (1 pages)
Docket Numbers:
Docket No. CP95-612-000
PDF File:
95-17705.pdf