Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice canceling temporary deviation from regulations.
SUMMARY:
The Coast Guard is canceling the temporary deviation published on May 2, 2012 (77 FR 25889) concerning the operation of the Amtrak Railroad Bridge across the Niantic River, mile 0.0, at Niantic, Connecticut.
DATES:
The temporary deviation published on May 2, 2012 (77 FR 25889) is cancelled as of July 14, 2012.
ADDRESSES:
The docket for this cancelled deviation is available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. You may also find this docket on the Internet by going to http://www.regulations.gov,, inserting USCG-2012-0305 in the “Keyword” box and then clicking “Search”.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Judy Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 668-7165, email judy.k.leung-yee@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Start Printed Page 42433
Basis and Purpose
On May 2, 2012, we published a temporary deviation entitled “Drawbridge Operations: Niantic River, Niantic, CT” in the Federal Register (77 FR 25889) for the Amtrak Railroad Bridge, across the Niantic River, mile 0.0, at Niantic, Connecticut. This deviation from the operating regulations was authorized under 33 CFR 117.35.
Cancellation
The Coast Guard previously issued a temporary deviation to Amtrak published on May 2, 2012 (77 FR 25889) to allow their bridge to remain in the closed position from 11 p.m. through 6 a.m., Monday through Thursday, beginning May 15, 2012 until August 15, 2012. The temporary deviation was necessary to facilitate completion of machinery installation and lift span work at the new railroad bridge.
In May 2012, the contractor building the bridge discovered a minor shift in the bascule pier, causing a misalignment of the new bridge. Until the pier alignment problem is resolved, the work anticipated to be completed during the closures authorized under the May 2, 2012 (77 FR 25889) temporary deviation could not be completed.
In order to complete all the remaining work and correct the pier alignment problem a new temporary deviation is required authorizing a 48 hour bridge closure from 9 p.m. July 15 to 9 p.m. July 17, 2012 and a series of overnight closures between July 22 and August 22, 2012.
As a result of all the above information it was determined that the temporary deviation published on May 2, 2012 (77 FR 25889) must be cancelled on July 14, 2012.
Start SignatureDated: July 9, 2012.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2012-17580 Filed 7-18-12; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 07/19/2012
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice canceling temporary deviation from regulations.
- Document Number:
- 2012-17580
- Dates:
- The temporary deviation published on May 2, 2012 (77 FR 25889) is cancelled as of July 14, 2012.
- Pages:
- 42432-42433 (2 pages)
- Docket Numbers:
- Docket No. USCG-2012-0305
- PDF File:
- 2012-17580.pdf
- CFR: (1)
- 33 CFR 117