[Federal Register Volume 62, Number 127 (Wednesday, July 2, 1997)]
[Notices]
[Pages 35796-35797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-17321]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP97-603-000]
Egan Hub Partners, L.P.; Notice of Application
June 26, 1997.
Take notice that on June 23, 1997, Egan Hub Partners, L.P. (Egan
Hub) 44084 Riverside Parkway, Suite 340, Leesburg, Virginia 20176,
filed, in Docket No. CP97-603-000, an application pursuant to Section
7c of the Natural Gas Act and part 157 of the Federal Energy Regulatory
Commission's (Commission) regulations for a certificate of public
convenience and necessity authorizing the construction, and operation
of additional compressors and related facilities and to increase the
capacity of Egan Hub's existing salt dome storage facility located in
Acadia Parish, Louisiana, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
Specifically, Egan Hub seeks authorization to increase the total
combined operating capacity of its two caverns to approximately 15.5
Bcf and to construct four additional 4,450 horsepower compressors, and
appurtenant facilities.
Any person desiring to be heard or to make any protest with
reference to said application should on or before July 17, 1997, file
with the Federal Energy Regulatory Commission, Washington, D.C. 20426,
a motion to intervene or a protest in accordance with the requirements
of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or
18 CFR 285.211) and the Regulations under the Natural Gas Act (18 CFR
157.10). All protests filed with the Commission will be considered by
it in determining the appropriate action to be taken but will not serve
to make the protestants parties to the proceeding. Any person wishing
to become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate is required by the public
convenience and given.
Under the procedures herein provided for, unless otherwise advised,
it will be unnecessary for Egan Hub to appear or be necessity. If a
motion for leave to intervene is timely filed, or if the Commission on
its own motion believes that a formal hearing is required, further
[[Page 35797]]
notice of such hearing will be duly represented at the hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 97-17321 Filed 7-1-97; 8:45 am]
BILLING CODE 6717-01-M