Home »
1997 Issues »
62 FR (07/02/1997) » 97-17340. Northeast Utilities System (The Connecticut Light and Power Company, Holyoke Power and Electric Company, Holyoke Water Power Company, Public Service Company of New Hampshire, Western Massachusetts Electric Company); New England Electric ...
97-17340. Northeast Utilities System (The Connecticut Light and Power Company, Holyoke Power and Electric Company, Holyoke Water Power Company, Public Service Company of New Hampshire, Western Massachusetts Electric Company); New England Electric ...
[Federal Register Volume 62, Number 127 (Wednesday, July 2, 1997)]
[Notices]
[Pages 35799-35800]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-17340]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER97-3329-000]
Northeast Utilities System (The Connecticut Light and Power
Company, Holyoke Power and Electric Company, Holyoke Water Power
Company, Public Service Company of New Hampshire, Western Massachusetts
Electric Company); New England Electric System Operating Companies
(Granite State Electric Company, New England Power Company);
Commonwealth Energy System Companies (Cambridge Electric Light Company,
Canal Electric Company, Commonwealth Electric Company); Central Maine
Power Company; Notice of Filing
June 26, 1997.
Take notice that on June 16, 1997, the above-captioned utilities
(the Filing Systems) filed materials related to the Restated NEPOOL
Agreement entitled Additional Generating Resources Program Terms and
Conditions (the Terms and Conditions).
The Filing Systems state that the Terms and Conditions are intended
to make additional capacity and energy available in New England should
projected 1997 summer capacity shortage conditions materialize. The
proposed Terms and Conditions are applicable to the reactivation or
modification of certain generating units owned by participants in
NEPOOL (Participants) and the sales of electric energy at wholesale
from these units to the pool. The arrangements related to the Terms and
Conditions also involve a waiver of wheeling charges by certain
Participant transmission service providers for transmission over non-
pool transmission facilities of energy generated by reactivated or
modified generating units.
The Filing Systems state that reactivation of certain generating
units could be required as early as June 15, 1997 and request an
effective date of June 15, 1997 for the Terms and Conditions. The
Filing Systems state that copies of the materials in the filing have
been sent to members of the NEPOOL Executive Committee and to the
electric utility regulatory commissions and governors of the six New
England states.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211
[[Page 35800]]
and 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.211 and 385.214). All such motions or protests should be filed on
or before July 7, 1997. Protests will be considered by the Commission
in determining the appropriate action to be taken, but will not serve
to make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public
inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-17340 Filed 7-1-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/02/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-17340
- Pages:
- 35799-35800 (2 pages)
- Docket Numbers:
- Docket No. ER97-3329-000
- PDF File:
-
97-17340.pdf