98-17625. California Independent System Operator Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 127 (Thursday, July 2, 1998)]
    [Notices]
    [Pages 36219-36223]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-17625]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER98-991-001, et al.]
    
    
    California Independent System Operator Corporation, et al.; 
    Electric Rate and Corporate Regulation Filings
    
    June 24, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. California Independent System Operator Corporation
    
    [Docket No. ER98-991-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO) tendered for filing Amendment No. 1 
    to the Scheduling Coordinator Agreement between Power Resource 
    Managers, L.L.C., and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1 modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    2. California Independent System Operator Corporation
    
    [Docket No. ER98-994-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1 
    to the Scheduling Coordinator Agreement between Edison Source and the 
    ISO for acceptance by the Commission. The ISO states that Amendment No. 
    1 modifies the Agreement, as directed by the Commission, to comply with 
    the Commission's order issued December 17, 1997 in Pacific Gas and 
    Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    3. California Independent System Operator Corporation
    
    [Docket No. ER98-995-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO) tendered for filing Amendment No. 1 
    to the Scheduling Coordinator Agreement between Duke Energy Trading & 
    Marketing, L.L.C. and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1 modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    4. California Independent System Operator Corporation
    
    [Docket No. ER98-1000-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO) tendered for filing Amendment No. 1 
    to the Scheduling Coordinator Agreement between Northern California 
    Power Agency and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1 modifies the Agreement, as directed by the
    
    [[Page 36220]]
    
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    5. California Independent System Operator Corporation
    
    [Docket No. ER98-1001-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between PacifiCorp, an Oregon 
    Corporation and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    6. California Independent System Operator Corporation
    
    [Docket No. ER98-1003-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between PG&E Energy Services 
    Corporation and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para.  61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    7. California Independent System Operator Corporation
    
    [Docket No. ER98-1006-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Automated Power 
    Exchange, Inc., and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    8. California Independent System Operator Corporation
    
    [Docket No. ER98-1009-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Vitol Gas & Electric, 
    L.L.C., and the ISO for acceptance by the Commission. The ISO states 
    that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    9. California Independent System Operator Corporation
    
    [Docket No. ER98-1012-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between City of Seattle, City 
    Light Department and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    10. California Independent System Operator Corporation
    
    [Docket No. ER98-1013-001]
    
        Take notice on June 19, 1998, the California Independent System 
    Operator Corporation (ISO), tendered for filing Amendment No. 1, to the 
    Scheduling Coordinator Agreement between Electric Clearinghouse, Inc., 
    and the ISO for acceptance by the Commission. The ISO states that 
    Amendment No. 1, modifies the Agreement, as directed by the Commission, 
    to comply with the Commission's order issued December 17, 1997 in 
    Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    11. California Independent System Operator Corporation
    
    [Docket No. ER98-1016-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Enron Power Marketing, 
    Inc., and the ISO for acceptance by the Commission. The ISO states that 
    Amendment No. 1, modifies the Agreement, as directed by the Commission, 
    to comply with the Commission's order issued December 17, 1997 in 
    Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    12. California Independent System Operator Corporation
    
    [Docket No. ER98-1018-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between LG&E Energy Marketing, 
    Inc., and the ISO for acceptance by the Commission. The ISO states that 
    Amendment No. 1 modifies the Agreement, as directed by the Commission, 
    to comply with the Commission's order issued December 17, 1997 in 
    Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
    
    [[Page 36221]]
    
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    13. California Independent System Operator Corporation
    
    [Docket No. ER98-1020-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Arizona Public Service 
    Company and the ISO for acceptance by the Commission. The ISO states 
    that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    14. California Independent System Operator Corporation
    
    [Docket No. ER98-1021-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between San Diego Gas & 
    Electric Company and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    15. California Independent System Operator Corporation
    
    [Docket No. ER98-1884-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Symmetry Device 
    Research, Inc., and the ISO for acceptance by the Commission. The ISO 
    states that Amendment No. 1, modifies the Agreement, as directed by the 
    Commission, to comply with the Commission's order issued December 17, 
    1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    16. California Independent System Operator Corporation
    
    [Docket No. ER98-1870-001]
    
        Take notice that on June 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing Amendment No. 1, 
    to the Scheduling Coordinator Agreement between Citizens Power Sales 
    and the ISO for acceptance by the Commission. The ISO states that 
    Amendment No. 1, modifies the Agreement, as directed by the Commission, 
    to comply with the Commission's order issued December 17, 1997 in 
    Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced docket.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    17. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER98-2720-000]
    
        Take notice that on June 19, 1998, Consolidated Edison Company of 
    New York, Inc. (CECONY), tendered for filing, pursuant to its FERC 
    Electric Tariff Rate Schedule No. 2, a service agreement for 
    Consolidated Edison Solutions, Inc., to purchase electric capacity and 
    energy pursuant at negotiated rates, terms, and conditions.
        CECONY states that a copy of this filing has been served by mail 
    upon Consolidated Edison Solutions, Inc.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    18. The Washington Water Power Company
    
    [Docket No. ER98-3183-000]
    
        Take notice that on June 19, 1998, The Washington Water Power 
    Company (WWP), tendered for filing with the Federal Energy Regulatory 
    Commission an amendment in the above docket by submitting an executed 
    Service Agreement for Short-Term Firm and Non-Firm Point-To-Point 
    Transmission Service under WWP's Open Access Transmission Tariff--FERC 
    Electric Tariff, Volume No. 8 with PacifiCorp. WWP requests the Service 
    Agreement be given an effective date of May 1, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    19. Cinergy Services, Inc.
    
    [Docket No. ER98-3405-000]
    
        Take notice that on June 18, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and NorAm Energy Services, Inc., (NorAm).
        Cinergy and NorAm are requesting an effective date of May 20, 1998.
        Comment date: July 8, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    20. Public Service Electric and Gas Company
    
    [Docket No. ER98-3421-000]
    
        Take notice that on June 19, 1998, Public Service Electric and Gas 
    Company (PSE&G), of Newark, New Jersey tendered for filing an agreement 
    for the sale of capacity and energy to Tenaska Power Services Co. 
    (Tenaska), pursuant to the PSE&G Wholesale Power Market Based Sales 
    Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of May 22, 1998.
        Copies of the filing have been served upon Tenaska and the New 
    Jersey Board of Public Utilities.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    21. Public Service Electric and Gas Company
    
    [Docket No. ER98-3422-000]
    
        Take notice that on June 19, 1998, Public Service Electric and Gas 
    Company (PSE&G) of Newark, New Jersey tendered for filing an agreement 
    for the sale of capacity and energy to Duke/Louis Dreyfus, L.L.C. 
    (Duke), pursuant to the PSE&G Wholesale Power Market Based Sales 
    Tariff, presently on file with the Commission.
        PSE&G further requests waiver of the Commission's Regulations such 
    that the agreement can be made effective as of May 22, 1998.
        Copies of the filing have been served upon Duke and the New Jersey 
    Board of Public Utilities.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    22. Cinergy Services, Inc.
    
    [Docket No. ER98-3423-000]
    
        Take notice that on June 17, 1998, Cinergy Services, Inc. 
    (Cinergy),
    
    [[Page 36222]]
    
    tendered for filing a service agreement under Cinergy's Open Access 
    Transmission Service Tariff (the Tariff), entered into between Cinergy 
    and Amoco Energy Trading Corporation (Amoco).
        Cinergy and Amoco are requesting an effective date of May 21, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    23. Jersey Central Power & Light Company, et al.
    
    [Docket No. ER98-3424-000]
    
        Take notice that on June 19, 1998, Jersey Central Power & Light 
    Company, Metropolitan Edison Company and Pennsylvania Electric Company 
    (d/b/a GPU Energy), filed an executed Service Agreement between GPU 
    Energy and Engage Energy US, L.P. (EEU), dated June 18, 1998. This 
    Service Agreement specifies that EEU has agreed to the rates, terms and 
    conditions of GPU Energy's Capacity, Energy and Capacity Credit Sales 
    Tariff (Sales Tariff) designated as FERC Electric Tariff, Second 
    Revised Volume No. 1. The Sales Tariff allows GPU Energy and EEU to 
    enter into separately scheduled transactions under which GPU Energy 
    will make available for sale, capacity, energy and capacity credits.
        GPU Energy requests a waiver of the Commission's notice 
    requirements for good cause shown and an effective date of June 18, 
    1998, for the Service Agreement.
        GPU Energy has served copies of the filing on regulatory agencies 
    in New Jersey and Pennsylvania.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    24. Puget Sound Energy, Inc.
    
    [Docket No. ER98-3425-000]
    
        Take notice that on June 19, 1998, Puget Sound Energy, Inc., as 
    Transmission Provider, tendered for filing a Service Agreement for Firm 
    Point-To-Point Transmission Service (Firm Point-To-Point Service 
    Agreement) and a Service Agreement for Non-Firm Point-To-Point 
    Transmission Service (Non-Firm Point-To-Point Service Agreement) with 
    NorAm Energy Services, Inc. (NES), as Transmission Customer.
        A copy of the filing was served upon NES.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    25. Puget Sound Energy, Inc.
    
    [Docket No. ER98-3426-000]
    
        Take notice that on June 19, 1998, Puget Sound Energy, Inc., as 
    Transmission Provider, tendered for filing a Service Agreement for Firm 
    Point-To-Point Transmission Service (Firm Point-To-Point Service 
    Agreement) and a Service Agreement for Non-Firm Point-To-Point 
    Transmission Service (Non-Firm Point-To-Point Service Agreement) with 
    Duke Energy Trading and Marketing, L.L.C. (DETM), as Transmission 
    Customer.
        A copy of the filing was served upon DETM.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    26. Cinergy Services, Inc.
    
    [Docket No. ER98-3427-000]
    
        Take notice that on June 19, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff), entered into between 
    Cinergy and Amoco Energy Trading Corporation (Amoco).
        Cinergy and Amoco are requesting an effective date of May 21, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    27. Duquesne Light Company
    
    [Docket No. ER98-3428-000]
    
        Take notice that on June 19, 1998, Duquesne Light Company (DLC), 
    filed a Service Agreement dated June 9, 1998, with Constellation Power 
    Source under DLC's FERC Coordination Sales Tariff (Tariff). The Service 
    Agreement adds Constellation Power Source as a customer under the 
    Tariff. DLC requests an effective date of June 9, 1998, for the Service 
    Agreement.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    28. Cinergy Services, Inc.
    
    [Docket No. ER98-3429-000]
    
        Take notice that on June 17, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and Oglethorpe Power Corporation (OPC).
        Cinergy and OPC are requesting an effective date of May 21, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    29. Cinergy Services, Inc.
    
    [Docket No. ER98-3430-000]
    
        Take notice that on June 19, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a Service Agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff), entered into between 
    Cinergy and Oglethorpe Power Corporation (OPC).
        Cinergy and OPC are requesting an effective date of May 21, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    30. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER98-3431-000]
    
        Take notice that on June 19, 1998, Orange and Rockland Utilities, 
    Inc. (O&R), tendered for filing pursuant to Part 35 of the Federal 
    Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 
    35, a service agreement under which O&R will provide capacity and/or 
    energy to NGE Generation, Inc. (NGE Generation).
        O&R requests waiver of the notice requirement so that the service 
    agreement with NGE Generation becomes effective as of June 16, 1998.
        O&R has served copies of the filing on The New York State Public 
    Service Commission and NGE Generation.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    31. Rochester Gas and Electric Corporation
    
    [Docket No. ER98-3432-000]
    
        Take notice that on June 19, 1998, Rochester Gas and Electric 
    Corporation (RG&E), filed a Service Agreement between RG&E and the 
    Coral Power, L.L.C.(Customer). This Service Agreement specifies that 
    the Customer has agreed to the rates, terms and conditions of the RG&E 
    open access transmission tariff filed on July 9, 1996 in Docket No. 
    OA96-141-000.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of June 11, 1998, for the Coral 
    Power, L.L.C., Service Agreement. RG&E has served copies of the filing 
    on the New York State Public Service Commission and on the Customer.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    32. JMF Power Marketing
    
    [Docket No. ER98-3433-000]
    
        Take notice that on June 19, 1998, JMF Power Marketing (JMF), 
    petitioned the Commission for acceptance of JMF Rate Schedule FERC No. 
    1; the granting
    
    [[Page 36223]]
    
    of certain blanket approvals, including the authority to sell 
    electricity at market-based rates; and the waiver of certain Commission 
    Regulations.
        JMF intends to engage in wholesale electric power and energy 
    purchases and sales as a marketer. JMF is not in the business of 
    generating or transmitting electric power. JMF is a privately owned 
    company, is not affiliated with any other entity and is engaged in 
    electric and water resources energy consulting.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    33. Unitil Power Corp.
    
    [Docket No. ER98-3434-000]
    
        Take notice that on June 19, 1998, Unitil Power Corp. (UPC), 
    tendered for filing a service agreement between UPC and PG&E Energy 
    Trading-Power, L.P., for service under UPC's Market-Based Power Sales 
    Tariff. This Tariff was accepted for filing by the Commission on 
    September 25, 1997, in Docket No. ER97-2460-000. UPC requests an 
    effective date of July 15, 1998, for the service agreement.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    34. Fitchburg Gas and Electric Light Company
    
    [Docket No. ER98-3435-000]
    
        Take notice that on June 19, 1998, Fitchburg Gas and Electric Light 
    Company (Fitchburg), tendered for filing a service agreement between 
    Fitchburg and PG&E Energy Trading-Power, L.P., for service under 
    Fitchburg's Market-Based Power Sales Tariff. This Tariff was accepted 
    for filing by the Commission on September 25, 1997, in Docket No. ER97-
    2463-000. Fitchburg requests an effective date of July 15, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    35. Entergy Services, Inc.
    
    [Docket No. ER98-3436-000]
    
        Take notice that on June 19, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc., Entergy Gulf States, 
    Inc., Entergy Louisiana, Inc., Entergy Mississippi, Inc., and Entergy 
    New Orleans, Inc. (collectively, the Entergy Operating Companies), 
    tendered for filing a Non-Firm Point-To-Point Transmission Service 
    Agreement and a Short-Term Firm Transportation Agreement both between 
    Entergy Services, Inc., as agent for the Entergy Operating Companies, 
    and NorAm Energy Services, Inc.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    36. FirstEnergy System
    
    [Docket No. ER98-3437-000]
    
        Take notice that on June 19, 1998, FirstEnergy System filed Service 
    Agreements to provide Firm Point-to-Point Transmission Service for 
    Coral Power, L.L.C., Dayton Power & Light Co., Duquesne Light Co., Koch 
    Energy Trading, Inc., PacifiCorp Power Marketing, Inc., and Plum Street 
    Energy Marketing, Inc., the Transmission Customers. Services are being 
    provided under the FirstEnergy System Open Access Transmission Tariff 
    submitted for filing by the Federal Energy Regulatory Commission in 
    Docket No. ER97-412-000. The proposed effective date under these 
    Service Agreements is June 1, 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    37. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER98-3438-000]
    
        Take notice that on June 19, 1998, Consolidated Edison Company of 
    New York, Inc. (CECONY), tendered for filing, pursuant to its FERC 
    Electric Tariff Rate Schedule No. 2, a service agreement for Northeast 
    Utilities Service Company to purchase electric capacity and energy 
    pursuant at negotiated rates, terms, and conditions.
        CECONY states that a copy of this filing has been served by mail 
    upon Northeast Utilities Service Company.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    38. Entergy Services, Inc.
    
    [Docket No. ER98-3440-000]
    
        Take notice that on June 19, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Gulf States Utilities Company tendered for 
    filing a Letter Agreement between Entergy Services, Inc., and Sam 
    Rayburn Municipal Power Agency (SRMPA). Entergy Services states that 
    the Letter Agreement provides for the relocation of certain 
    distribution facilities to accommodate an SRMPA terminal addition at an 
    Entergy Services substation.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    39. Entergy Services, Inc.
    
    [Docket No. ER98-3441-000]
    
        Take notice that on June 19, 1998, Entergy Services, Inc. (Entergy 
    Services), on behalf of Entergy Arkansas, Inc. (Entergy Arkansas), 
    submitted for filing the Second Amendment to the Agreement for 
    Wholesale Power Service between Entergy Arkansas, Inc. and the City of 
    Benton, Arkansas, dated March 1998.
        Comment date: July 9, 1998, in accordance with Standard Paragraph E 
    at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in 
    accordance with Rules 211 and 214 of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or 
    protests should be filed on or before the comment date. Protests will 
    be considered by the Commission in determining the appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of these filings are on file with the Commission and 
    are available for public inspection.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-17625 Filed 7-1-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
07/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-17625
Dates:
July 9, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
36219-36223 (5 pages)
Docket Numbers:
Docket No. ER98-991-001, et al.
PDF File:
98-17625.pdf