94-17609. Issuance of Final Design Approval Pursuant to 10 CFR Part 52, Appendix O; U.S. Advanced Boiling Water Reactor Design; GE Nuclear Energy  

  • [Federal Register Volume 59, Number 138 (Wednesday, July 20, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-17609]
    
    
    [[Page Unknown]]
    
    [Federal Register: July 20, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 52-001]
    
     
    
    Issuance of Final Design Approval Pursuant to 10 CFR Part 52, 
    Appendix O; U.S. Advanced Boiling Water Reactor Design; GE Nuclear 
    Energy
    
        The U.S. Nuclear Regulatory Commission has issued a final design 
    approval (FDA) to GE Nuclear Energy (GE) pursuant to 10 CFR Part 52, 
    Appendix O. This FDA allows the U.S. advanced boiling water reactor 
    (ABWR) standard design to be referenced in an application for a 
    construction permit or operating license pursuant to 10 CFR Part 50, or 
    in an application for a combined license pursuant to 10 CFR Part 52.
        In addition, GE has completed the technical review stage of design 
    certification pursuant to the applicable requirements of Subpart B of 
    10 CFR Part 52. The staff performed its technical review of the U.S. 
    ABWR standard safety analysis report, certified design material, and 
    technical specifications in accordance with the standards for review of 
    design certification applications set forth in 10 CFR Section 52.48 
    that are applicable and technically relevant to the U.S. ABWR standard 
    design, including the exemptions and applicable regulations identified 
    in Section 1.6 of the final safety evaluation report (FSER). On the 
    basis of its evaluation and independent analyses, as discussed in the 
    FSER, the staff concludes that, subject to satisfactory completion of 
    the ABWR design control document and certified design material, GE's 
    application for design certification meets those portions of 10 CFR 
    Section 52.47 that are applicable and technically relevant to the U.S. 
    ABWR standard design.
        Therefore, the staff and the Advisory Committee on Reactor 
    Safeguards will utilize the U.S. ABWR standard design and will reply on 
    it in the administrative review phase of the design certification 
    process in accordance with 10 CFR 52.51.
        A copy of the FDA has been placed in the NRC's Public Docket Room, 
    the Gelman Building, 2120 L Street, N.W., Washington, D.C. 20555, for 
    review by interested persons.
    
        Dated at Rockville, Maryland, this 13th day of July 1994.
    
        For the Nuclear Regulatory Commission.
    Dennis M. Crutchfield,
    Associate Director for Advanced Reactors and License Renewal, Office of 
    Nuclear Reactor Regulation.
    [FR Doc. 94-17609 Filed 7-19-94; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
07/20/1994
Department:
Nuclear Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-17609
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: July 20, 1994, Docket No. 52-001