[Federal Register Volume 60, Number 140 (Friday, July 21, 1995)]
[Notices]
[Page 37640]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-18048]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4725-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075. Weekly receipt of
Environmental Impact Statements Filed July 10, 1995 through July 14,
1995 Pursuant to 40 CFR 1506.9.
EIS No. 950302, DRAFT EIS, AFS, UT, WY, Wasatch-Cache National Forest,
Rangeland Health Forest Management Plan, Implementation, Cache, Box
Elders, Davis, Duchesne, Morgan, Rich, Salt Lake, Tooele, Summit,
Wasatch and Weber Counties, UT and Uinta County, WY, Due: September 5,
1995, Contact: Tom Scott (801) 524-5188.
EIS No. 950303, FINAL EIS, NPS, CA, Joshua Tree National Monument
General Management Plan and Development Concept Plan, Implementation,
Riverside and San Bernardino Counties, CA, Due: August 21, 1995,
Contact: Alan Schmierer (415) 744-3971.
EIS No. 950304, DRAFT SUPPLEMENT, FHW, CT, US 6 Freeway Transportation
Corridor Improvements, Additional Alternatives for Improvements between
I-384 and the US 6 Freeway in Columbia, Bolton, Coventry, Andover and
Columbia, CT, Due: September 22, 1995, Contact: Dwight A. Home (203)
659-6703.
EIS No. 950305, FINAL EIS, NPS, WA, Lake Chelan National Recreation
Area General Management Plan, Implementation, Chelan County, WA, Due:
August 21, 1995, Contact: William Paleck (360) 856-5700.
EIS No. 950306, DRAFT EIS, SFW, NV, Lahontan Valley Wetlands Water
Rights Acquisition Program, Implementation, Churchill County, NV, Due:
September 20, 1995, Contact: Ronald M. Anglin (702) 432-5128.
EIS No. 950307, FINAL EIS, AFS, CO, Illinois Creek Timber Sale, Timber
Harvesting, Implementation, Amended Land and Resource Management Plan,
Grand Mesa, Uncompahgre and Gunnison National Forests, Taylor River/
Cebolla Ranger District, Gunnison County, CO, Due: August 21, 1995,
Contact: James Dawson (970) 641-0471.
EIS No. 950308, DRAFT EIS, AFS, ID, Lower South Fork Salmon River Post-
Fire Project, Fire-Killed and Imminently Dead Timber Harvesting,
Implementation and COE Section 404 Permit Issuance, Payette National
Forest, McCall Ranger District, Idaho and Valley Counties, ID, Due:
September 5, 1995, Contact: Dan Anderson (208) 634-0400.
EIS No. 950309, FINAL EIS, GSA, NY, U.S. Plaza at Rainbow Bridge
Renovation Project, Leasing of Space for Use by the U. S. Immigration
and Naturalization Service and the U. S. Customs Service, Niagara
County, NY, Due: August 21, 1995, Contact: Peter A. Sneed (212) 264-
3581.
EIS No. 950310, LEGISLATIVE FINAL EIS, AFS, OR, Wallowa River National
Wild and Scenic River Study from the Confluence of the Minam and
Wallowa Rivers to the Confluence of the Wallowa River and the Wild and
Scenic Grande Ronde River for Designation or Nondesignation into the
National Wild and Scenic Rivers System, Union and Wallowa Counties, OR,
Due: August 21, 1995, Contact: Steve Davis (503) 523-6391.
EIS No. 950311, LEGISLATIVE FINAL EIS, NPS, OR, ADOPTION--Wallowa River
Wild and Scenic River Study from the Confluence of the Minam and
Wallowa Rivers to the Confluence of the Wallowa River and the Wild and
Scenic Grande Ronde River for Designation or Nondesignation into the
National Wild and Scenic River System, Union and Wallowa Counties, OR,
Due: August 21, 1995, Contact: Dan Haas (206) 220-4120. The US
Department of the Interior's, National Park Service (NPS) has adopted
the US Department of Agriculture's, Forest Service FEIS #950310, filed
with the Environmental Protection Agency on 7-13-95. NPS is a
cooperating agency on this project. Recirculation of the document is
not necessary under Section 1506.3(c) of the Council on Environmental
Quality Regulations.
EIS No. 950312, FINAL EIS, UMC, CA, San Onofre Area Sewage Effluent
Compliance Project, Cease and Desist Order, Camp Pendleton Marine Corps
Base, San Diego County, CA, Due: August 21, 1995, Contact: Luple Armas
(619) 725-3004.
EIS No. 950313, DRAFT EIS, FRC, WA, Rocky Reach Hydroelectric Project
(FERC No. 2145) Operating License Amendment Issuance to Increase Lake
Entiat Reservoir, Chelan and Douglas Counties, WA, Due: September 5,
1995, Contact: James Hastreiter (503) 326-5846.
EIS No. 950314, FINAL EIS, DOE, Energy Planning and Management Program
to Service (15) States from Minnesota in the Northeast to California in
the Southwest, Power Marketing Initiative, Implementation, Due: August
21, 1995, Contact: Robert Fullerton (303) 275-1610.
EIS No. 950315, DRAFT EIS, EPA, NJ, Hackensack Meadows District (HMD)
Special Area Management Plan (SAMP), Development and Implementation,
COE Section 10 and 404 Permit Issuance, NJ, Due: September 18, 1995,
Contact: Robert W. Hargrove (212) 637-3495.
EIS No. 950316, FINAL EIS, NPS, AZ, Grand Canyon National Park General
Management Plan, Implementation, Coconino and Mohave Counties, AZ, Due:
August 21, 1995, Contact: Larry L. Norris (303) 969-2267.
EIS No. 950317, FINAL EIS, NAS, Cassini Spacecraft Exploration Mission
to Explore the Planet Saturn, Implementation, Due: August 21, 1995,
Contact: Peter B. Ulrich (202) 358-0290.
EIS No. 950318, DRAFT EIS, USN, PR, VA, Relocatable Over The Horizon
Radar (ROTHR) System Construction and Operation, Commonwealth of Puerto
Rico and Chesapeake, VA, Due: September 5, 1995, Contact: Linda Blount
(804) 322-4892.
EIS No. 950319, DRAFT EIS, USN, IL, Glenview Naval Air Station Disposal
and Reuse, Implementation, COE Section 404 Permit and EPA Permits
Issuance, Cook County, IL, Due: September 5, 1995, Contact: Thomas
Burst (803) 743-0590.
Dated: July 18, 1995.
William D. Dickerson,
Deputy Director, NEPA Division, Office of Federal Activities.
[FR Doc. 95-18048 Filed 7-20-95; 8:45 am]
BILLING CODE 6560-50-U