July 15, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Original Major License.
b. Project No.: 11181-002.
c. Dated Filed: November 28, 1994.
d. Applicant: Energy Storage Partners, Inc.
e. Names of Project: Lorella Pumped Storage Project.
f. Location: In Klamath County, Oregon, partially in Bureau of Land
Management lands. T39S, R11E, section 35, T40S, R12E, section 2, T40S,
R12E, section 1, T40S, R12E, section 12, T40S, R12E, section 11, T40S,
R12E, section 14, T40S, R12E, section 22.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
825r.
h. Applicant's Contact: Mr. Douglas Spaulding, Energy Storage
Partners, 1030 North Tyrol Trail, Suite B-101, Minneapolis, MN 55416,
(612) 315-309.
i. FERC Contact: Hector Perez at (202) 219-2843.
j. Deadline Date: See attached paragraph D10.
k. Status of Environmental Analysis: This application has been
accepted for filing and is ready for environmental analysis at this
time--see attached standard paragraph D10.
l. Description of Project: The proposed project would consist of:
(1) An upper reservoir with a gross storage capacity of 16,519 acre-
feet and an area of 199 acres at maximum normal water surface elevation
of 5,523 feet above mean sea level (msl), impounded by two, 178-foot-
high rock fill embankments with a crest elevation of 5,533 feet msl;
(2) an ungated reinforced concrete intake/outlet structure with
trashracks; (3) a 24-foot-diameter, 1,326-foot-long vertical power
shaft; (4) a 24-foot-diameter, 3,200-foot-long concrete-lined power
tunnel; (5) a concrete-lined penstock manifold dividing the power
tunnel into four, 12-foot-diameter, 355-foot-long, steel-lined
penstocks; (6) a powerhouse with four reversible pump/turbines, with
four, 250-megawatt motor/generator units; (7) a 1,500-foot-long by 38-
foot-wide D-shaped concrete-lined tailrace tunnel; (8) a lower
reservoir with a storage capacity of 18,646 acre-feet and a maximum
water surface elevation of 4,191 feet msl, impounded by natural
topography and a 57-foot-high earth zoned embankment, with a crest
elevation of 4,199.2 feet msl; (9) a 4-mile-long, 500-kilovolt
transmission line connecting the project to Captain Jack substation'
and (10) other appurtenances. The project would operate as a closed
system using water supplied by two groundwater wells about 2 miles from
the lower reservoir.
m. Purpose of Projects: Project power would be sold to a local
utility.
n. This notice also consists of the following standard paragraphs:
D10.
o. Available Locations of Applications: A copy of the application,
as amended and supplemented, is available for inspection and
reproduction at the Commission's Public Reference and Files Maintenance
Branch, located at 888 First Street, N.E., Room 2A, Washington, DC
20426, or by calling (202) 208-1371. A copy is also available for
inspection and reproduction at the Klamath County Library in Klamath
Falls, Oregon.
D10. Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Section 4.34(b) of the
Regulations (See Order No. 533 issued May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, recommendations, terms and conditions and
prescriptions concerning the application be filed with the Commission
within 60 days from the issuance date of this notice. All reply
comments must be filed with the Commission within 105 days from the
date of this notice.
Anyone may obtain an extension of time for these deadlines from the
[[Page 39086]]
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of applicant and the project number of the application to which
the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Project Review,
Office of Hydropower Licensing, Federal Energy Regulatory Commission,
at the above address. Each filing must be accompanied by proof of
service on all persons listed on the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b), and
385.2010.
Linwood A. Watson, Jr.,
Acting Secretary.