98-19360. Drawbridge Operation Regulations; Honker Cut, San Joaquin County, CA, Eightmile Road Bridge  

  • [Federal Register Volume 63, Number 139 (Tuesday, July 21, 1998)]
    [Rules and Regulations]
    [Pages 39029-39030]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-19360]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Coast Guard
    
    33 CFR Part 117
    
    [CGD11-98-010]
    
    
    Drawbridge Operation Regulations; Honker Cut, San Joaquin County, 
    CA, Eightmile Road Bridge
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Notice of temporary deviation from regulations.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the Coast Guard has issued a 
    temporary deviation to the regulations governing the opening of the 
    Eightmile Road swing bridge over Honker Cut between Empire Tract and 
    King Island at Stockton, CA. The deviation specifies that the bridge 
    need not be opened for vessels from 12:01 a.m., September 1, 1998 until 
    11:59 p.m., October 23, 1998. The purpose of this deviation is to allow 
    San Joaquin County and its contractors paint the bridge. During this 
    work, this bridge will have scaffolding and tarpaulins installed, which 
    prevent the bridge from opening.
    
    DATES: The effective period of the deviation is 12:01 a.m. September 1, 
    1998 to 11:59 p.m., October 23, 1998.
    
    FOR FURTHER INFORMATION CONTACT: Mr. Jerry Olmes, Bridge Administrator, 
    Eleventh Coast Guard District, Building 50-6 Coast Guard Island, 
    Alameda, CA 94501-5100, telephone (510) 437-3515.
    
    SUPPLEMENTARY INFORMATION: The Coast Guard anticipates that the 
    economic consequences of this deviation will be minimal. The bridge 
    opens on average only 6 times per year. If mariners require an opening, 
    they have alternate routes available via Little Connection Slough or 
    King Island Cut, two miles east and west of Honker Cut, respectively.
        This deviation from the normal operating regulations in 33 CFR 
    117.161 is authorized in accordance with the provisions of 33 CFR 
    117.35.
    
    
    [[Page 39030]]
    
    
        Dated: June 24, 1998.
    R.D. Sirois,
    Captain, U.S. Coast Guard, Commander, Eleventh Coast Guard District, 
    Acting.
    [FR Doc. 98-19360 Filed 7-20-98; 8:45 am]
    BILLING CODE 4910-15-M
    
    
    

Document Information

Effective Date:
9/1/1998
Published:
07/21/1998
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
98-19360
Dates:
The effective period of the deviation is 12:01 a.m. September 1, 1998 to 11:59 p.m., October 23, 1998.
Pages:
39029-39030 (2 pages)
Docket Numbers:
CGD11-98-010
PDF File:
98-19360.pdf
CFR: (1)
33 CFR 117