99-18525. Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protest; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • [Federal Register Volume 64, Number 139 (Wednesday, July 21, 1999)]
    [Notices]
    [Pages 39128-39129]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-18525]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Soliciting Motions 
    To Intervene and Protest; Notice of Application Ready for Environmental 
    Analysis and Soliciting Comments, Recommendations, Terms and 
    Conditions, and Prescriptions
    
    July 15, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: New Major License.
        b. Project No.: 2084-020.
        c. Date filed: January 28, 1999.
        d. Applicant: Niagara Mohawk Power Corporation.
        e. Name of Project: Upper Raquette River.
        f. Location: On the Raquette River, between river miles 52 and 68 
    from its confluence with the St. Lawrence River, in the towns of Colton 
    and Parishville, St. Lawrence County, New York. The project would not 
    utilize federal lands.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Jerry L. Sabattis, Licensing Coordinator, 
    Niagara Mohawk Power Corporation, 300 Erie Boulevard West, Syracuse, 
    New York 13202, (315) 428-5561.
        i. FERC Contact: Charles T. Raabe, E-mail address, 
    Charles.Raabe@ferc.fed.us, or telephone (202) 219-2811.
        j. Deadline Date: 60 days from the date of issuance of this notice.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's Rules of Practice and Procedure require all 
    intervenors filing documents with the Commission to serve a copy of 
    that document on each person whose name appears on the official service 
    list for the project. Further, if an intervenor files comments or 
    documents with the Commission relating to the merits of an issue that 
    may affect the responsibilities of a particular resource agency, they 
    must also serve a copy of the document on that resource agency.
        k. Status of environmental analysis: This application has been 
    accepted for filing and is ready for environmental analysis at this 
    time. The Commission will prepare a multiple project Environmental 
    Assessment (EA) including the Carry Falls Project (FERC No. 2060-005), 
    the Upper Raquette River Project (FERC No. 2084-020), the Middle 
    Raquette River Project (FERC No. 2330-007). As part of the multiple 
    project EA, the Commission will also consider the merits of an 
    application for amendment to exemption for the Potsdam Project (FERC 
    No. 2869-007) which is located between the Middle and Lower Raquette 
    River Projects.
        l. Description of the Project: The existing, operating project 
    consists of: (1) The Stark Falls Development comprising: (a) A 35-foot-
    high concrete gravity-type dam with a concrete overflow section and a 
    control gate section flanked by earth dikes; (b) six earth saddle 
    dikes; (c) a 1.5-mile-long reservoir at normal pool elevation 1,355.0 
    feet USGS; (d) an intake; (e) a penstock; (f) a powerhouse containing a 
    23,872-kW generating unit; and (g) appurtenant facilities; (2) the 
    Blake Falls Development comprising: (a) A 75-foot-high concrete 
    gravity-type dam with a concrete overflow section; (b) an earth dike; 
    (c) a 5.5-mile-long reservoir at normal pool elevation 1,250.5 feet 
    USGS; (d) an intake; (e) a penstock; (f) a powerhouse containing a 
    13,913-kW generating unit; and (g) appurtenant facilities; (e) the 
    Rainbow Falls Development comprising: (a) A 75-foot-high concrete 
    gravity-type dam with a concrete overflow section flanked by a 1,630-
    foot-long earth dike; (b) an earth saddle dike; (c) a 3.5-mile-long 
    reservoir at normal pool elevation 1,181.5 feet USGS; (d) an intake; 
    (e) a penstock; (f) a powerhouse containing a 22,828-kW generating 
    unit; and (g) appurtentant facilities; (4) the Five Falls Development 
    comprising: (a) A 50-foot-high concrete gravity-type dam with a 
    concrete overflow section flanked at each end by an earth dike; (b) a 
    1.0-mile-long reservoir at normal pool elevation 1,077.0 feet USGS; (c) 
    an intake; (d) a 1,200-foot-long penstock; (e) a powerhouse containing 
    a 22,828-kW generating unit; and (f) appurtenant facilities; and (5) 
    the South Colton Development comprising: (a) A 45-foot-high concrete 
    gravity-type dam with a concrete overflow section and earth abutments; 
    (b) a 1.5-mile-long reservoir at normal pool elevation 973.5 feet USGS; 
    (c) an intake; (d) a 1,300-foot-long penstock; (e) a powerhouse 
    containing an 18,948-kW generating unit; and (f) appurtenant 
    facilities. The Upper Raquette River Project has a total installed 
    capacity of 102,389-kW.
        m. Locations of the application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Washington, DC 20246, 
    or by calling
    
    [[Page 39129]]
    
    (202) 208-1371. The application may be viewed on the web at http://
    www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). A 
    copy is also available for inspection and reproduction at the address 
    in item h. above.
        Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
    ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' 
    (2) set forth in the heading the name of the applicant and the project 
    number of the application to which the filing responds; (3) furnish the 
    name, address, and telephone number of the person protesting or 
    intervening; and (4) otherwise comply with the requirements of 18 CFR 
    385.2001 through 385.2005. All comments, recommendations, terms and 
    conditions or prescriptions must set forth their evidentiary basis and 
    otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
    obtain copies of the application directly from the applicant. Any of 
    these documents must be filed by providing the original and the number 
    of copies required by the Commission's regulations to: The Secretary, 
    Federal Energy Regulatory Commission, 888 First Street, NE, Washington, 
    DC 20426. An additional copy must be sent to Director, Division of 
    Project Review, Office of Hydropower Licensing, Federal Energy 
    Regulatory Commission, at the above address. A copy of any protest or 
    motion to intervene must be served upon each representative of the 
    applicant specified in the particular application. A copy of all other 
    filings in reference to this application must be accompanied by proof 
    of service on all persons listed in the service list prepared by the 
    Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
    385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-18525 Filed 7-20-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/21/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-18525
Dates:
60 days from the date of issuance of this notice.
Pages:
39128-39129 (2 pages)
PDF File:
99-18525.pdf