2016-17386. Virgil C. Summer Nuclear Station, Units 2 and 3  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Determination of the successful completion of inspections, tests, and analyses.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for multiple inspections, tests, analyses, and acceptance criteria (ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.

    ADDRESSES:

    Please refer to Docket ID NRC-2008-0441 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:

    • Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0441. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
    • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “ADAMS Public Documents” and then select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
    • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Billy Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5848; email: Bill.Gleaves@nrc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Licensee Notification of Completion of ITAAC

    South Carolina Electric & Gas (SCE&G), on behalf of itself and the South Carolina Public Service Authority, (both hereafter called the licensee) has submitted ITAAC closure notifications (ICNs) under § 52.99(c)(1) of title 10 of the Code of Federal Regulations (10 CFR), informing the NRC that the licensee has successfully performed the required inspections, tests, and analyses, and that the acceptance criteria are met for:

    VCSNS Unit 2 ITAAC

    2.1.02.08a.i (28), 2.1.02.08a.ii (29), 2.2.03.08c.vi.01 (189), 2.2.03.08c.vi.02 (190), 2.5.02.13 (552), 3.1.00.01 (733), C.3.8.01.04.01 (848), C.3.8.01.05.01.01 (849), C.3.8.01.05.02.01 (857), and C.3.8.01.05.02.02 (858)

    VCSNS Unit 3 ITAAC

    2.1.02.08a.i (28), 2.1.02.08a.ii (29), 2.1.03.11 (86), 2.2.03.08c.vi.01 (189), 2.2.03.08c.vi.02 (190), 2.5.02.13 (552), 3.1.00.01 (733), C.3.8.01.04.01 (848), C.3.8.01.05.01.01 (849), C.3.8.01.05.02.01 (857), and C.3.8.01.05.02.02 (858)

    The ITAAC for VCSNS Unit 2 are in Appendix C of the VCSNS Unit 2 combined license (ADAMS Accession No. ML14100A092). The ITAAC for VCSNS Unit 3 are in Appendix C of VCSNS Unit 3 combined license (ADAMS Accession No. ML14100A101).

    II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met. The documentation of the NRC staff's determination is in the ITAAC Closure Verification Evaluation Form (VEF) for each ITAAC. The VEF is a form that represents the NRC staff's structured process for reviewing ICNs. Each ICN presents a narrative description of how the ITAAC was completed. The NRC's ICN review process involves a determination on whether, among other things: (1) Each ICN provides sufficient information, including a summary of the methodology used to perform the ITAAC, to demonstrate that the inspections, tests, and analyses have been successfully completed; (2) each ICN provides sufficient information to demonstrate that the acceptance criteria of the ITAAC are met; and (3) any NRC inspections for the ITAAC have been completed and any ITAAC findings associated with that ITAAC have been closed.

    The NRC staff's determination of the successful completion of these ITAAC is based on information available at this time and is subject to the licensee's ability to maintain the condition that the acceptance criteria are met. If the staff receives new information that suggests the staff's determination on any of these ITAAC is incorrect, then the staff will determine whether to reopen Start Printed Page 47841that ITAAC (including withdrawing the staff's determination on that ITAAC). The NRC staff's determination will be used to support a subsequent finding, pursuant to 10 CFR 52.103(g), at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure process is not finalized for these ITAAC until the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future updates to the status of these ITAAC will be reflected on the NRC's Web site at http://www.nrc.gov/​reactors/​new-reactors/​oversight/​itaac.html.

    This notice fulfills the staff's obligations under 10 CFR 52.99(e)(1) to publish a notice in the Federal Register of the NRC staff's determination of the successful completion of inspections, tests and analyses.

    Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027

    A complete list of the review status for VCSNS Unit 2 ITAAC, including the submission date and ADAMS accession number for each ICN received, the ADAMS accession number for each VEF, and the ADAMS accession numbers for the inspection reports associated with these specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/​reactors/​new-reactors/​new-licensing-files/​sum2-icnsr.pdf.

    Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028

    A complete list of the review status for VCSNS Unit 3 ITAAC, including the submission date and ADAMS accession number for each ICN received, the ADAMS accession number for each VEF, and the ADAMS accession numbers for the inspection reports associated with these specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/​reactors/​new-reactors/​new-licensing-files/​sum3-icnsr.pdf.

    Start Signature

    Dated at Rockville, Maryland, this 11th day of July 2016.

    For the Nuclear Regulatory Commission.

    Jennifer Dixon-Herrity,

    Acting Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of New Reactors.

    End Signature End Supplemental Information

    [FR Doc. 2016-17386 Filed 7-21-16; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
07/22/2016
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Determination of the successful completion of inspections, tests, and analyses.
Document Number:
2016-17386
Pages:
47840-47841 (2 pages)
Docket Numbers:
NRC-2008-0441
PDF File:
2016-17386.pdf
Supporting Documents:
» NUREG-1939 Vol. 2 - Draft Environmental Impact Statement for Combined Licenses for Virgil C. Summer Nuclear Station Units 2 and 3
» NUREG-1939 Vol. 1 - Draft Environmental Impact Statement for Combined Licenses for Virgil C. Summer Nuclear Station Units 2 and 3