2019-15506. Test Procedure Interim Waiver Process  

  • Start Preamble

    AGENCY:

    Office of Energy Efficiency and Renewable Energy, Department of Energy.

    ACTION:

    Proposed rule; re-opening of public comment period.

    SUMMARY:

    On May 1, 2019, the U.S. Department of Energy (DOE) published a Notice of Proposed Rulemaking (NOPR) that proposed amendments to streamline its test procedure interim waiver decision-making process. The comment period for the NOPR ended on July 1, 2019. As a result of stakeholder requests, on June 26, 2019, DOE published a notice of webinar and an extension of the public comment period through July 15, 2019. During the webinar and shortly thereafter, stakeholders requested additional time to comment. Therefore, DOE has decided to reopen the comment period. This document announces that the period for submitting comments on the NOPR is to be re-opened.

    DATES:

    The comment period for the proposed rule published on May 1, 2019 (84 FR 18414) is reopened. DOE will accept comments, data, and information regarding this NOPR received no later than midnight on August 6, 2019, and deems any comments received prior to that date to be timely filed.

    ADDRESSES:

    Interested persons are encouraged to submit comments, identified by docket number [EERE-2019-BT-NOA-0011], and/or Regulation Identification Number (RIN) 1904-AE24, by any one of the following methods:

    1. Federal e-Rulemaking Portal: http://www.regulations.gov. Follow the instructions for submitting comments.

    2. Email: TPWaiverProcess2019NOA0011@ee.doe.gov. Include docket number [EERE-2019-BT-NOA-0011] and/or RIN 1904-AE24 in the subject line of the message. Please include the full body of your comments in the text of the message or as an attachment. If you have additional information such as studies or journal articles and cannot attach them to your electronic submission, please send them on a CD or USB flash drive to the address listed in paragraph 4. The additional material must clearly identify your electronic comments by name, date, subject, and docket number [EERE-2019-BT-NOA-0011].

    3. Mail: Address written comments to Appliance and Equipment Standards Program, U.S. Department of Energy, Building Technologies Office, Mailstop EE-5B, 1000 Independence Avenue SW, Washington, DC 20585-0121 (due to potential delays in DOE's receipt and processing of mail sent through the U.S. Postal Service, we encourage respondents to submit comments electronically to ensure timely receipt). If possible, please submit all items on a CD or USB flash drive, in which case it is not necessary to include printed copies.

    4. Hand Delivery/Courier: Appliance and Equipment Standards Program, U.S. Department of Energy, Building Technologies Office, 950 L'Enfant Plaza SW, Suite 600, Washington, DC 20024. Telephone (202) 287-1445. If possible, please submit all items on a CD or USB flash drive, in which case it is not necessary to include printed copies.

    Docket: The docket, which includes Federal Register notices, public meeting attendee lists and transcripts, comments, and other supporting documents/materials, is available for review at http://www.regulations.gov. All documents in the docket are listed in the http://www.regulations.gov index. However, some documents listed in the index, such as those containing information that is exempt from public disclosure, may not be publicly available. A link to the docket web page can be found at: http://www.regulations.gov/​docket?​D=​EERE-2019-BT-NOA-0011. The http://www.regulations.gov web page contains instructions on how to access all documents, including public comments, in the docket.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Jennifer Tiedeman, U.S. Department of Energy, Office of the General Counsel, GC-33, 1000 Independence Avenue SW, Washington, DC 20585-0121. Telephone: (202) 287-6111. Email: Jennifer.Tiedeman@hq.doe.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    On May 1, 2019, DOE published a NOPR in the Federal Register that proposed amendments to its regulations to streamline its test procedure interim waiver decision-making process. (84 FR 18414) The proposed amendments would require the Department to notify, in writing, an applicant for an interim waiver of the disposition of the request within 30 business days (i.e., approximately 45 days) of receipt of the application. Should DOE fail to satisfy this requirement, the request for interim waiver would be deemed granted based on the criteria in DOE regulations. Specifically, DOE regulations require that DOE grant an interim waiver if it determines that it is desirable for public policy reasons to grant immediate relief pending a determination of the petition for waiver. An interim waiver would remain in effect until a waiver decision is published or until DOE publishes a new or amended test procedure that addresses the issues presented in the application, whichever is earlier. If the alternate test procedure ultimately required by DOE differs from what is specified in the interim waiver, manufacturers would have a 180-day grace period to begin using the alternate test procedure specified in the decision and order on the petition. This proposal is intended to address delays in DOE's current process for considering requests for interim waivers and waivers from the DOE test method. These delays impose costs on manufacturers, as they cannot certify and distribute their products while they wait for DOE to respond to their petitions.

    The NOPR provided for the submission of comments by July 1, 2019. DOE received requests to hold a public meeting and to extend the comment period on the proposal. As a result, on June 26, 2019, DOE published a notice of webinar and an extension of the public comment period through July 15, 2019. DOE held a webinar on July 11, 2019. During the webinar and shortly thereafter, stakeholders requested additional time to prepare comments.

    Given the importance to DOE of receiving public input, DOE is re-opening the comment period. DOE will consider any comments received by midnight on August 6, 2019, and deems any comments received prior to that date to be timely filed.

    Start Signature

    Signed in Washington, DC, on July 16, 2019.

    Daniel R. Simmons,

    Assistant Secretary for Energy Efficiency, Energy Efficiency and Renewable Energy, U.S. Department of Energy.

    End Signature End Supplemental Information

    [FR Doc. 2019-15506 Filed 7-19-19; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Effective Date:
5/1/2019
Published:
07/22/2019
Department:
Energy Department
Entry Type:
Proposed Rule
Action:
Proposed rule; re-opening of public comment period.
Document Number:
2019-15506
Dates:
The comment period for the proposed rule published on May 1, 2019 (84 FR 18414) is reopened. DOE will accept comments, data, and information regarding this NOPR received no later than midnight on August 6, 2019, and deems any comments received prior to that date to be timely filed.
Pages:
35040-35040 (1 pages)
Docket Numbers:
EERE-2019-BT-NOA-0011
RINs:
1904-AE24: Test Procedure Interim Waiver Process
RIN Links:
https://www.federalregister.gov/regulations/1904-AE24/test-procedure-interim-waiver-process
PDF File:
2019-15506.pdf
Supporting Documents:
» 2021-12-14 Test Procedure Interim Waiver Process; Final rule.
» 2021-08-20 Test Procedure Interim Waiver Process; Notice of proposed rulemaking and request for comment
» Documentation of Changes between the draft Final Rule submitted to the Office of Information and Regulatory Affairs (OIRA) and the issued Final Rule
» 2020-12-11 Test Procedure Interim Waiver Process; Final rule
» 2019-07-11 Transcript: Webinar Test Procedure Interim Waiver Process U.S. Dept. of Energy
» 2019-07-22 Test Procedure Interim Waiver Process; Proposed rule; re-opening of public comment period
» DOE notes of teleconference between DOE and representative of SBA Office of Advocacy
» DOE Test Procedure Waiver PR Roundtable Attendees 6.26.19
» Frequently Asked Questions - Notice of Proposed Rulemaking pertaining to the Test Procedure Interim Waiver Process
» 2019-06-26 Test Procedure Interim Waiver Process; Notice of webinar and extension of public comment period
CFR: (2)
10 CFR 430
10 CFR 431