98-19590. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 141 (Thursday, July 23, 1998)]
    [Notices]
    [Pages 39560-39561]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-19590]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-661-000]
    
    
    Koch Gateway Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    July 17, 1998.
        Take notice that on July 10, 1998, Koch Gateway Pipeline Company 
    (Koch Gateway), Post Office Box 1478, Houston, Texas 77251-1478, filed 
    a request with the Commission in Docket No. CP98-661-000, pursuant to 
    Sections 157.205, and 157.211 of the Commission's Regulations under the 
    Natural Gas Act (NGA) for authorization to operate as a jurisdictional 
    facility in interstate commerce a meter station previously installed, 
    operated and placed in service under Section 311(a) of the Natural Gas 
    Policy Act (NGPA) and Section 284.3(c) of the Commission's regulations 
    authorized in blanket certificate issued in Docket No. CP82-430-000, 
    all as more fully set forth in the request on file with the Commission 
    and open to public inspection.
        Koch Gateway proposes to operate as a jurisdictional facility a 
    two-inch meter station constructed under 311(a) of the NGPA, to 
    facilitate delivery of natural gas on behalf of Willmut Gas and Oil 
    Company (Willmut), a local distribution company in Covington County, 
    Mississippi to Blaine Asphalt, Inc. (Blaine), a end user. Koch states 
    that presently the meter station is limited solely for gas 
    transportation under section 311 of the NGPA. Operation of the 
    facilities for other than NGPA purposes would provide increased access 
    to shippers utilizing Natural Gas Act service and provide Willmut the 
    ability to obtain additional flexibility in acquiring gas supplies. 
    Koch states that once this delivery point is certificated as a 
    jurisdictional facility, Willmut will be able to receive gas shipped to 
    this point pursuant to jurisdictional open-access transportation 
    agreements as well as Section 311 agreements. Koch reports that Willmut 
    estimates its peak day and average day requirements for this delivery 
    point be 1,630 MMBtu and 104
    
    [[Page 39561]]
    
    MMBtu, respectively. Koch further reports that Willmut reimbursed Koch 
    Gateway approximately $53,000 for construction costs.
        Any person or the Commission's staff may, within 54 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filled within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-19590 Filed 7-22-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/23/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-19590
Pages:
39560-39561 (2 pages)
Docket Numbers:
Docket No. CP98-661-000
PDF File:
98-19590.pdf