E9-17505. Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble July 16, 2009.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Application: Raw Water Intake on 0.26 Acres of Project Lands.

    b. Project No.: 2232-570.

    c. Date Filed: June 18, 2009.

    d. Applicant: Duke Energy Carolinas, LLC.

    e. Name of Project: Catawba-Wateree.

    f. Location: Lake Rhodhiss on the Catawba River, city of Lenoir, Caldwell County, North Carolina

    g. Filed Pursuant to: Federal Power Act, 16 USC 791a-825r.

    h. Applicant Contact: Mr. Kelvin K. Reagan, Duke Energy Carolinas, LLC, P.O. Box 1006, Charlotte, North Carolina 28201-1006, (704) 382-9386.

    i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502-6779.Start Printed Page 36482

    j. Deadline for filing comments, motions to intervene and protests: August 17, 2009.

    All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    k. Description of Request: Duke Energy Carolinas, LLC, proposes to grant permission to the City of Lenoir to use 0.26 acres of project lands to replace, construct, and maintain a raw water intake pipeline. The proposed eighteen million gallons per day intake would consist of two passive intake screens, two 36-inch diameter ductile iron intake pipes, a 45-ft deep wet well, and a raw water pump station. The area where the proposed intake tubes will be installed may require dredging to achieve the necessary line and grade, and excavation to construct structural supports for the intake screens. The proposed withdrawal is for municipal use by the City of Lenoir, North Carolina.

    l. Location of the Application: The filing is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by calling (202) 502-8371, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docsfiling/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Any filing must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers.

    p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov under the “e-Filing” link.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E9-17505 Filed 7-22-09; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
07/23/2009
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E9-17505
Pages:
36481-36482 (2 pages)
Docket Numbers:
Project No. 2232-570
EOCitation:
of 2009-07-16
PDF File:
e9-17505.pdf